carrying out revetment work at : 10 nos. locations (10/5, 27/1, 27/3, 30/1, 16/2, 17/1, 26/1, 28/1, ap29 & 34/3) of 132 kv dcds sendhwa pansemal line undef eht-c, dn., barwaha. (ii) 12 nos. locations (ap- 1, ap-2, 21/1, 21/3, 21/5, 32/5, 33/2, 38/1, 38/4, ap39, 39/3, ap-40) of 132 kv dcss julwaniya pati line under eht-c, dn., barwaha required cement, sand, metal, labour and water shall be arranged by the contractor at his own cost.