Explore Maharashtra government tenders and latest e-tenders online. Find updated tender notices, bid details and procurement opportunities.
FILTERS
corrigendum : development of integrated residential township at airoli, navi mumbai
View Insights
corrigendum : development and maintenance of land to be created in offshore of vadhvan coast by dredging, reclamation and construction of offshore protection bund for vadhvan port on ppp to be executed on hybrid annuity mode
eoi for providing transaction advisory cum project monitoring agency/ project monitoring unit (pmu) for development of a 200 mw data centre project in maharashtra.
corrigendum : construction of 6l access controlled greenfield highway from ahilyanagar km 290.000 to hasapur km 512.000 (ahilyanagar bypass pkg 2) - construction of 6-lane access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) and section-2: operation & maintenance of existing highways from start of ahilyanagar bypass (km 0.000) to walunj junction (km 29.280) of nh160 & nh-61; walunj junction (km 9.980) to chapadgaon (km 80.390) of nh-561a; chapadgaon (karmala) (km 80.390) to tembhurni (km 139.700) of nh-561a; tembhurni (km 150.050) to solapur (km 251.325) of nh-65; and solapur (km 99.400) to akkalkot (km 138.352) of nh-150e in the state of maharashtra on bot (toll) mode.
corrigendum : develop of 6l access controlled greenfield highway starting from junction with nh60 at adgaon km. 138.00 to ahilyanagar km. 290.000 (ahilyanagar bypass pkg i) - section 1: development of 6-lane access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) and section-2: operation, maintenance and tolling of existing highways from nashik (km. 205.310) to sinnar (km. 180.00) of nh-60; sinnar (km. 180.000) to nandur shingote (km. 162.900) of nh-60; nandur shingote (km. 0.00) to kolhar (km. 47.37) of nh160d; kolhar (82.800) to start of ahilyanagar bypass (km. 126.564) of nh-160 in the state of maharashtra on bot (toll) mode.
corrigendum : construction of the new integrated high court complex on plot bearing ct.s. no. 629/1234/a/1 at bandra government colony bandra (e)mumbai. epc (engineering, procurement and construction)
corrigendum : handling ,transport and other mining services - percentage quote based - handling & transport service, ob removal, coal extraction, extraction and evacuation of coal, removal of all type of materials(hard ob, soft ob) by hiring of equipment such as h..
corrigendum : construction of six lane greenfield highway starting from its junction with nh4b (new nh348) near pagote (design km. 0.000) till its junction on nh48 at chowk (design km. 29.219) in maharashtra to be executed on bot (toll) mode under nh(o)
request for selection (rfs) document for selection of vendors for design, manufacture, supply, transport, installation, testing and commissioning of off-grid dc solar photovoltaic water pumping systems of 3 hp, 5 hp & 7.5 hp capacity at identified farmers site in district of maharashtra, including complete system warranty and its repair and maintenance for 5 years under magel tyala saur krushi pump / pm kusum b scheme
notice inviting expression of interest for selection of the pmc project management consultant for mrc mega re development of colony project at sbi colony nerul navi mumbai
expression of interest (eoi) from reputed & experienced project management consultancy firms for participating in the selection process & engagement as project management consultant (pmc) for an epc project regarding re-development & construction of high-rise commercial & residential towers, its amenities, infrastructure works, interiors, etc. at sbis 25 acres colony, on plot no. 1 & 2, sector-13, nerul, navi mumbai.
balance work for construction of 8-lane access-controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg-viii)-02nd call
corrigendum : cons of 6l gf ac indore eastern bypass from km 113.000 on nh 347bg near simrol/datoda end at km 139.630 nanded pkg2 of indore dist n rehab n upgrade of exist nh52 from km 18.000 khandwa to km 27.000 ahilyapur from 4to6l pkg2 of indore in mp on ham
corrigendum : ie for const of 6l gf ac indore e by km113.00 on nh 347bg vill simrol datoda vill and at km139.630 nanded vil pkg2 of indore l26.630 km n rnu of nh52 ex.18.000 khandwa vill to km27.00 ahilyapur vil 4lto6l pkg2 of indore l9.00 km in mp nho tl35.630km
public health and municipalengineering department-urban infrastructure-proiding of roads.central medians.street lighting.parks and other developmental works in various urban local bodies under public health circles of andhra pradesh state under hybrid annuity model(ham)
corrigendum : construction of ratan tata udyog bhavan midc (hq) along with printing press building for maharashtra industrial development corporation on engineering procurement and construction (epc) mode.
corrigendum : cs for ae for balance work for construction of 8lane access controlled expressway from km 128.0 to km 154.6 of vadodara mumbai expressway karvad to jujuwa section in gujarat pkg ix
corrigendum : 4l of kolhapur sangli sec of nh166 from sangli phata km 0.00 to chokak km 7.738 n chokak km 145.300 to ankali km171.171 length33.609 km in maharashtra to be executed on hybrid annuity mode under nh o
construction of new double line between new palghar & vadhavan port (varor station) including electrification works in mumbai division of western railway
procurement of 30.8 million sheets of icao compliant electronic contactless inlays (in 2 ups) along with its operating system for indian e-passport booklets