Find the latest Madhya Pradesh government tenders and e-tenders online. Explore tender opportunities, bid details and procurement notices.
corrigendum : construction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
corrigendum : ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km - independent engineer services for construction of six lane greenfield access-controlled indore eastern bypass starting from design km 64+000 near pirkaradiya village and ending at design km 113+000 on nh 347bg near village simrol/datoda (package - 1) of indore & dewas district in the state of madhya pradesh on ham mode (length - 49.00 km).
corrigendum : widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham on hybrid annuity mode.
corrigendum : package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india - package- 3 electro-mechanical works of indirasagar-omkareshwar pumped storage project (8 x 80 mw i.e. 640 mw), district khandwa, madhya pradesh, india
corrigendum : construction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
corrigendum : consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.0.000 village khilchipura to ch.86.500 village aakli-kadiya (package-1) in madhya pradesh on epc mode under nh(o).
corrigendum : cons of 6l gf ac indore eastern bypass from km 113.000 on nh 347bg near simrol/datoda end at km 139.630 nanded pkg2 of indore dist n rehab n upgrade of exist nh52 from km 18.000 khandwa to km 27.000 ahilyapur from 4to6l pkg2 of indore in mp on ham
corrigendum : ie for const of 6l gf ac indore e by km113.00 on nh 347bg vill simrol datoda vill and at km139.630 nanded vil pkg2 of indore l26.630 km n rnu of nh52 ex.18.000 khandwa vill to km27.00 ahilyapur vil 4lto6l pkg2 of indore l9.00 km in mp nho tl35.630km
corrigendum : construction of 4l of ujjain jhalawar sec of nh 552g from ch.86.500 aakli kadiya to ch.159.263 jhalawar (jn with nh52) pkg 2 in the state of madhya pradesh and rajasthan on epc mode under nh(o).
corrigendum : consultancy services for ae for supervision of construction of 4-lanning of ujjain-jhalawar section of nh-552g from ch.86.500 village aakli-kadiya to ch.159.263 jhalawar (junction with nh52) (package-2) in madhya pradesh and rajasthan epc nh(o).
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
handling ,transport and other mining services - percentage quote based - ob removal, ob removal for a quantity of 96990600 bcm for a period of 1217 days at dudhichua project
construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
pre-bid assistance for preparation of priced boq for the tender- construction of new railway bg line in km 28.970 to 42.040 in between kulthana station (including) and rajpura station (including) earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge (03 nos) including electrification in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
handling ,transport and other mining services - percentage quote based - ob removal, ob removal of 98.31 mbcm at bina project for a period of 05 years.
corrigendum : construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
corrigendum : development, operation and maintenance of ims project at dewas gate on dbfot mode in the state of madhya pradesh
corrigendum : upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
corrigendum : const.of 4l ac gf alignment of southern bypass to jhansi and cl for nh44 n nh39 from km.16.920 of nh44 near bangay khas vill.dc 0.030 and terminating forming t junc at km6.650 of nh39 near orchha tigela dc15.542 l15.572km in mp and up on epc mode
corrigendum : upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode