Find the latest canal tenders in canal division for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
corrigendum : estimate for remodeling reconstruction of bahadarpur minor rd 0 to 2000 and construction of escape structure at rd 42500 of longowal disty
View Insights
construction of pucca water course in chak 80 rb
corrigendum : estimate for reconstruction/ remodeling of water course of o/l rd 8228/tr of subhan sub minor village- jhotianwali district - fazilka
1. execution of 1st-class brick lining work on the amaura minor of the amaura pump canal (located in the bhadaura development block of ghazipur district) from chainage 0.000 km to 0.180 km, in accordance with departmental drawings and standards; this includes the provision of labor and equipment, but excludes construction materials (cement and bricks). all works shall be executed in accordance with the bill of quantities. 2. execution of 1st-class brick lining work on the main channel of the gahmar western pump canal (located in the bhadaura development block of ghazipur district) from chainage 0.600 km to 0.750 km, in accordance with departmental drawings and standards; this includes the provision of labor and equipment, but excludes construction materials (cement and bricks). all works shall be executed in accordance with the bill of quantities. (hindi document)
corrigendum : estimate for permanent plugging of breach by brick linning rd 19850, 22150, 22210, 22780, 23800, 25600, 26450 of aspal disty
construction of stone lining and earth work with proper completion of work in main canal rach from 0.687 km to 0.862 km (length-175 meter) at ramraipur pump canal.
1. operation and maintenance work of various lift irrigation schemes under the maintenance head in pratham upkhand, pithoragarh, under janpad pithoragarh, from october 2026 to march 2027. 2. operation and maintenance work of various lift irrigation schemes under the maintenance head in dwitiya upkhand, didihat, under janpad pithoragarh, from october 2026 to march 2027. 3. operation and maintenance work of various lift irrigation schemes under the maintenance head in tritiya upkhand, bageshwar, under janpad bageshwar, from october 2026 to march 2027. 4. operation and maintenance work of various lift irrigation schemes under the maintenance head in chaturth upkhand, garud, under janpad bageshwar, from october 2026 to march 2027. (hindi image)