Find the latest earth work tenders in canal division for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
1. construction of earth work and pucca work from km 0.000 to km. 0.350 of bairkhar minor. 2. earth work from km 4.400 to km 4.575 and construction of vrb cum fall at km. 4.575 of bome minor. 3. construction of type-iii(quarter no iii/5 & iii/6) in dhanaura sichayi colony duddhi sonebhadra.
View Insights
earth work for strengthening of bank & dowel of main canal (0-2.0 km ) work includes : excavation of earth , loading , carriage upto 1 km , unloading , lead of 200 mtr and 1.8 mtr lift with manual compaction , dressing making profile but excluding mechanical compaction & royality will be applicable from time to time on govt. order and work will be done as per the l- section and cross section drawing & survey report provided by the department including all cost of required material , labour and t & p for proper completion of work as per direction engineer -in charge at main canal of nagapur pump canal.
construction of stone lining and earth work with proper completion of work in main canal rach from 0.687 km to 0.862 km (length-175 meter) at ramraipur pump canal.
earth work for strengthening of bank & dowel of main canal (0-2.0 km) work includes: excavation of earth, loading, carriage upto 1 km, unloading, lead of 200 mtr and 1.8 mtr lift with manual compaction, dressing making profile but excluding mechanical compaction & royalty will be applicable from time to time on govt. order and work will be done as per the l-section and cross section drawing & survey report provided by the department including all cost of required material, labor and t & p for proper completion of work as per direction engineer -in charge at main canal of nagapur pump canal kanpur nagar. (hindi image)