corrigendum : estimate for balance work for reconstruction of fall-cumbridge at rd 2950 of kishanpura disty
View Insights
earth work for strengthening of bank & dowel of main canal (0-2.0 km ) work includes : excavation of earth , loading , carriage upto 1 km , unloading , lead of 200 mtr and 1.8 mtr lift with manual compaction , dressing making profile but excluding mechanical compaction & royality will be applicable from time to time on govt. order and work will be done as per the l- section and cross section drawing & survey report provided by the department including all cost of required material , labour and t & p for proper completion of work as per direction engineer -in charge at main canal of nagapur pump canal.
construction of stone lining and earth work with proper completion of work in main canal rach from 0.687 km to 0.862 km (length-175 meter) at ramraipur pump canal.
earth work for strengthening of bank & dowel of main canal (0-2.0 km) work includes: excavation of earth, loading, carriage upto 1 km, unloading, lead of 200 mtr and 1.8 mtr lift with manual compaction, dressing making profile but excluding mechanical compaction & royalty will be applicable from time to time on govt. order and work will be done as per the l-section and cross section drawing & survey report provided by the department including all cost of required material, labor and t & p for proper completion of work as per direction engineer -in charge at main canal of nagapur pump canal kanpur nagar. (hindi image)
1. operation and maintenance work of various lift irrigation schemes under the maintenance head in pratham upkhand, pithoragarh, under janpad pithoragarh, from october 2026 to march 2027. 2. operation and maintenance work of various lift irrigation schemes under the maintenance head in dwitiya upkhand, didihat, under janpad pithoragarh, from october 2026 to march 2027. 3. operation and maintenance work of various lift irrigation schemes under the maintenance head in tritiya upkhand, bageshwar, under janpad bageshwar, from october 2026 to march 2027. 4. operation and maintenance work of various lift irrigation schemes under the maintenance head in chaturth upkhand, garud, under janpad bageshwar, from october 2026 to march 2027. (hindi image)