FILTERS
construction of office cum rest house building at sitamarhi station in connection with construction of new line between sitamarhi to sheohar under dy.ce/c/smi.
View Insights
s&t work in connection with:(1) construction of long haul loop in up grid by extending de of orl of up loop l/no.-1 at kte end with dispatch facility and connecting banking engine siding to up loop l/no.-1 at bsp end at kgs station of bilaspur division.(2) chhulha: construction of long loop line (cal-750m, ds- pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end.
nanded division : proposed safety related track maintenance works and other miscellaneous track works under in sse/pway/pau & sse/pway/hnl under aden/pau's jurisdiction
replacement of channel sleepers with h-beam sleepers 1500 nos on major / important bridge nos. 1025/1up, 1025/1dn, 1029/1up, 1029/1dn, 1033/1up, 1033/1dn, 1033/1boxn on 7 bridges of jabalpur - katni,anuppur - new katni junction and new katni juntion - katni murwara section and bridge nos 1198/1 up, 1198/1dn on 2 bridges of satna - manikpur section under jurisdiction of divisional engineer (central) jabalpur and sr. divisional engineer (north) jabalpur section.
indoor and outdoor replacement of existing relay based auto hut no.6 with ei in the diva-panvel section of mumbai division.
1)shegaon-replacement and repairs to existing sse(wks) seg & sse(p-way) seg office at shegaon station under aden(w) akola section.(id no.01.01.64.25.3.50.023) 2)badnera-construction of sse(wks)bd office at badnera station with allied facilities under aden bd section.(id no.01.01.64.25.3.50.021)
tbr 87.851 tkms in bsl division.
a) dr-pr-mtn-sion-gtbn - rendering service for maintenance work including supply of materials for colonies under sse(w)dr for 24 months. b) cla-vvh-tmby - rendering service for maintenance work including supply of materials for colonies under sse(w)cla for 24 months
(composite tender for track & s & t work) improvement/upgradation works of kalyan yard under aden (ne)kyn under sr den ne
(dhanbad division: tsr (p) -37.769 tkm), tsr(p) with new 60kg psc wider/modifed wider sleeper(bytrt)= 37.769 tkm under the jurisdiction of sr.den/2/dhn.
yard improvement and upgradation work at dss,bca, and bju yard under aden/west/bju in connection with "(i) yard improvement and upgradation work of passenger running lines other than main line at station bju,bca,dss,rd & sai under sr.den/iii/see & (ii) yard improvement and upgradation work of non- passenger running lines at station bju,dss,rd & sai under sr. den/iii/see."
work of camc for out of warranty coaches & periodical maintenance of under warranty coaches of pneumatic pressurized flushing system (ppfs) and electro pneumatic pressurized flushing system (eppfs) installed in lhb coaches at dhn coaching depot for the period of 3 years and supply, laying of epoxy flooring in lwaccw, lwaccn, lwaccne, lwscn, lws/ls and lwsczac type lhb coaches at coaching depot, dhn for 3 years.
bina-itarsi & bhopal-sant hirdaram nagar section: execution of turnout sleeper renewal (ttr (tsr)- 14 sets) and renewal of turnouts (ttr (fs+tws+cms)-87 sets) under the sr.den/c/bhopal section.
replacement of flexible wire between point machine and junction box with armoured signaling cable in all the points and other safety works at various locations on bsl division.
s&t work in connection with: rupaund (rpd): extension of de of dn loop (c/loop) l/1 at kte end for long haul formation and goods parking line.
increasing sleeper density (isd) 54.40 km in katni -singrauli section under divisional engineer(east) jabalpur jurisdiction.
dhanbad division:-ctr(s/p)- 15.284 tkm : pka-dhn (2.566 tkm), dhn-jnn (10.842 tkm), pka-peh (0.929 tkm), pka-peh (0.947tkm) in the jurisdiction of sr.aden/2/dhn.
provision of track machine siding facilities for track machines siding at katangi khurd, khanna banjari, beohari, niwas road and sarai gram and (ii) improvement of civil infrastructure at lc no. 59,67,88,105 on katni-singrauli section under jurisdiction of divisional engineer(east) jabalpur
construction of track machine stabling sidings in gwalior-dholpur & birlanagar- etawah sections of jhansi division under sr.den/north jurisdiction.
nanded division : proposed safety related track maintenance works and other miscellaneous track works under sse/pway/j & sse/pway/selu under aden/j's jurisdiction.
comprehensive repair, condition monitoring and maintenance of ccb brake system in 3-phase electric locos. (qty: 20 nos loco set)
three miscellaneous work under divisional engineer (east) jabalpur jurisdiction .part :-1 upgradation of existing infrastructure including construction of new telecom store in premises of sse/ tele / katni under assistant divisional engineer(maintenance) katni sub division. [ part of work :- modernization of s&t infrastructure through construction of new telecom store at jabalpur and new room at katni depot (telecom) over jabalpur division.]part:-2 construction of relay room for provision of axle counter in parallel to track in katni-singrauli section under assistant divisional engineer (maintenance) katni sub division (location -katangi khurd , salhana).[ part of work- enhancing the system redundancy by provision of digit axle counters in parallel with track circuits at station yard on in section of katni -singrauli ].part 3 :- construction of relay room for provision of axle counter in parallel to track in katni-singrauli section under assistant divisional engineer beohari sub-division . (location- niwas road -2, dubri kalan -1, beohari-1, chhataini-1)[ part of work -enhancing the system redundancy by provision of digit axle counters in parallel with track circuits at station yard on in section of katni -sgrl].
p.way work of scy-dure: yard improvement/up-gradation work under aden/l/dnr at station pws, bta, kua, krs & rpr yard.
maintenance of gc line for two years between birlanagar-kailaras section under aden/gwl sub-division of sr.den/north jurisdiction.
tsr 4.448 km , trr 10.20 km and tfr(r) 99.00 km { rubber pad only} on katni singrauli section under jurisdiction of divisional engineer (east) jabalpur
see division - provision of associate s&t work in connection with provision of lhs in lieu of lc no. 1 (bca-vpda) , lc no. 2 (bca-vpda), lc no. 44 (csr-ayrn) and provision of rub in lieu of lc no. 7'b' (vpda-bca), 13'c'(mog-vpda) & lc no. 14'a'(mog-vpda).
(1)pachora-replacement of sse(p-way)pc office at pachora station under aden(l) bsl section.(id no.01.01.64.25.3.50.022) (2)jalgaon-provision of community hall for rly staff at jl.(id no.01.01.64.25.3.50.020)
dhanbad division-tsr(p)-21.274 tkm (tsr/p) with new 60kg psc wider/modified wider sleeper in the jurisdiction of aden(2)/dhn.
a) proposed construction of rbg and station building at mjf ( on account of doubling) (irpsm id : 11.03.16.25.3.52.011) b) replacement of panel interlocking both indoor and outdoor by electronic interlocking system at cvb station on hun/hdn routes of hyd.division (irpsm id : 11.03.33.25.2.52.001)
"electrical general construction work in connection with (i) replacement of pi by ei at kumhari and sarona, (ii) construction of y-link line from durg direction line to dallirajhara line at maroda yard and (iii) construction of ei building-01 no. & end goomty-04 nos. between dlbs-durg; in raipur division over s.e.c. railway"
request for proposal(rfp) for appointment of general consultant for signal & telecommunication construction unit central railway.
s&t work in connection with interlocking of non-interlocked lc gates (05 nos) having tvu more than 10000 on jabalpur division of west central railway
enhancing the reliability of existing signalling gears by replacement of outlived eld, batteries & track feed charger of kte-mkp & kte - sgrl section of jabalpur division on west central railway.
comprehensive annual maintenance contract of frauscher make multi section digital axle counters jamuna bridge- tundla section & idgah- bayana section of agra division for a period of 03 years.
trr (p) between fut-ipr from km 21.782 - 43.000 =20.890 tkm under sse/p.way/hilsa
construction of ohe cum psi depot including tower car shed at mndh station. (this work primarily involves construction of 23 x 140m ohe cum psi depot and 160m long track for tower car shed.)
(a)-itarsi - up gradation of roh and sick line facilities at wagon repair shed and yard itarsi . (b)-itarsi- creation of trip maintenance/advance inspection centers for inspection amd maintenance activity with retievable ohe and crane facility to carry out ia/ib schedule/minor unscheduled repair of electric locos. (c)-bina- provision of covered shed , pitline for 140t crane in existing washing siding at bina. (d) provision of sufficient lighting in yards/stations of bhopal division.( electrical work )
gwalior jn.: necessary alteration in line no.6 (pf-4 line) for making through 3rd line with additional loop line (pf-5 lne) at gwalior yard.
intermediate overhauling (ioh) of high adhesion fabricated bogie frames of wag- 7 locomotives of diesel loco shed, kazipet
conversion of swr into lwr by mobile flush welding plant under the jurisdiction of sr.den/north/nagpur.
(i) hajipur - muzaffarpur (up) - tbr -8.055 tkm. (ii) bca-spj-trr(p)-8.665 tkm. (iii) bju-bca-ttr (fs+tws+cmsc) - 37 sets & ttr (fs+tws+cmsc)- 19 sets, (tws + wcmsc) -5 sets, (tws+cmsc) - 5sets, twsej-156 sets & glued joint - 04 nos.
s&t work in connection with turnout renewal in bina-katni & katni singrauli section of jabalpur division on west central railway (signalling work)
nanded division - nanded division: proposed safety related track works under in sse/pway/whm & sse/pway/akot under aden/ak's jurisdiction.
custom bid for services - schedule a supply & filling of silica sand of specification aar m-916-51 for 08 months (june - sept both the years) including 72610 nos of polythene bags (50 micron or above) & labour cost (incl gst) at rig & brjn for two.. , custom bid for services - schedule b supply & filling of dry and screened river sand from (oct - may both the years) including 145220 nos of polythene bags (50 micron or above) & labour cost(incl gst) at rig & brjn for two years , custom bid for services - schedule c repairing of locomotive sanders at filling point at rig & brjn (incl gst) for two years
(1) improvement to level crossings by providing road surface of dilapidated surface of level crossings under the jurisdiction of aden/gondia. (2) improvement to level crossing by providing road surface of dilapidated surface of level crossings under the jurisdiction of aden/dongargarh (dgg).
special track maintenance work under aden/nwd
various signalling work in connection with (a) extension of up & dn loop line to achieve 753m csr at ghoti station. (b)provision of track machine siding at lasalgaon, dhule & kajgaon on bhusawal division