Find the latest rail spare tenders in central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of poh kit for 3/8" lever operated horn valve (as per clw drawing no. 0/3/65/95- alt.-5) compri sing of : 1. ref no. 4 - valve spring qty.= 01 no. 2. ref. no. 5 - valve qty.= 01 no. 3. ref. no. 3 - washer qty. = 01 no. 4. ref no. 8 - o-ring qty. = 01 no. 5. ref no. 12 - spring qty.= 01 no. 6. ref no. 13 - split pin dia. 2 mm * , length 25 mm, qty. = 01 no. (one set consist of 06 items having 06 nos.) [ warranty period: 30 months after the date of delivery ] ] sse/ poh maintenance /snpd - poh kit for 3/8" lever operated horn
View Insights
supply of aoh kit for high reach pantograph type wbl85hr, make-schunk each kit con sists of 7 items as per annexure attached [ warranty period: 30 months after the date of deli very ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - aoh kit for high reach pantograph
supply of gaskets for m/s. shil make transformer oil pump, to type acpd175 for 3 phase locos, s et consists of 4 items as given below: 1) terminal box nitrile rubber gasket part no. sh/opc/19-1no./s et 2) compression gland complete with cable gland, grommet & washer part no. sh/opc/16-1 no./set 3) o ring between suction flange and shell part no. sh/opc/31-1 no./set 4) o ring between shell & d elivery flange part no. sh/opc/23 -1 no./set [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - gaskets for m/s shil make transformer oil pump
supply of brake pad for emu us brake assembly as per rdso/2013/cg/01 (lestest revision) of make 1. knorr bremse part no. - c105255/35g5x or 2. faiveley becorit drawing no 43152c0a. material test certifica te from oem/nabl approved lab, warranty certificate required as per irs condition. [ warranty period: 3 0 months after the date of delivery ] ] - brake pad for emu us brake assembly
supply of overhauling kit set for lrus of ccb 2.0 system for diesel locomotives . each set consisti ng of 10 overhauling kits 1) over hauling kit for lru control portion bc(bc-cp) kb part no.-789009. 2) overhauling kit for lru ,control portion, 16-pipe (16-cp) kb part no.-787556-2004. 3) overhauling kit f or lru ,control portion,20-pipe (20-cp) kb part no.-787775-2004. 4) overhauling kit for lru ,control p ortion, er(er-cp)kb part no. 788753-2004. 5) overhauling kit for lru ,control portion, bp(bp-cp)kb pa rt no.-787321-2004. 6) overhauling kit for distributor valve .kb part no. ii73835. 7)overhauling kit for lru, controller assembly, cab-1(ebv-a) kb part no.-787452-2004. 8) overhauling kit for lru, controll er assembly, cab-2(ebv-b) kb part no.-787453-2004. 9) overhauling kit for emergency brake valve n b11 .kb part no.-i69411. 10) overhauling kit for 821 vent valve. kb part no.-785260-1000. [ warrant y period: 30 months after the date of delivery ] ] - overhauling kit set for lrus of ccb 2.0 system for diesel locomotives
corrigendum : supply of pedestal jaw liner for casnub bogie as per g-95 (revision 2), fig. no. 31, size 67 x 38 x 5 mm, material: is:3885 part-i, gr. iv (bh 380 - 420). [ warranty period: 48 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - pedestal jaw liner for casnub bogie as per g-95
supply of supply of motorised changing kit for axle box without lifting of 3phase loco(c onsist 04 items & accessories in one set) sps model no. - axle c. k. 121990. as per attached an nexure-a. [ warranty period: 30 months after the date of delivery ] ] - supply of motorised changing kit for axle box without lifting of 3phase loco
supply of poh kit for passenger emergency alarm valve ( peav ) consisting of 9 items (rd so design) . and confirming to rdso specn. no. 02-abr-02 , amendment no. 4 of sept 2016. appendix -j .[ full description of the 9 items attached in document coloumn]. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted : max 8 lacs ] ] mechanical & electrical/lgd, - poh kit for passenger emergency alarm valve ( peav ).
supply of kit of hand brake gear consisting of 6 items. 1] hand brake pull rod for bcn to drg. no. wa/bg-6356, alt.-3, item no. 3, qty.-05 nos. 2] hand brake pull rod for boxn & boxnhs to drg. no. w a/bg-6356 alt.-3, item no. 1 & 2, qty.-05 nos. 3] spindle for hand brake for boxn & bcn to drg. no. w a/bg-6337 alt. nil, qty.-04 nos. 4] spindle for hand brake for bcn & bcxc-iii to drg. no. wd-84014-s-0 6 alt.-10, item no. - 1, qty.-03 nos. 5] connecting rod for hand brake gear for bcn & bcxc-iii to drg. n o. wd-84014-s-06, alt. -10 item no.- 2, qty. - 03 nos. 6] sleeve to drg. no. w/bg-6310 alt.-3, qty.-05 n os. material and specification confirming to is 2062 : part-1 : 2025, gr. e 250 a, material for bush as p er drawing. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] smm-d kurdwadi, cr - kit of hand brake gear
supply of m.s., black, hex head, round body, without nut, size 20 x 65 mm - shall conform to item no. 1 of icf drawing no. t-0-5-673, alt. d. the specification of the item shall be as per the drawing, i.e ., is 1364 : part 2 : 2023 ( iso 4017 : 2022), property class - 8.8. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] dycmm(cwe), matunga, cr - m.s., black, hex head, round body, without nut, size 20 x 65 mm - shall conform to item no. 1 of icf drawing no. t-0-5-673, alt. d. the specification of the item shall be as per the drawing, i.e., is 1364 : part 2 : 2023 ( iso 4017 : 2022), property class - 8.8.
supply of set of pneumatic fittings of pneumatic control box 1-v15.12520 for high reach pantograph type wbl85hr as per m/s schunk part no-909010045200,each set consis ts of 16 items in 43 nos. as per annexure attached. makes chunk metal and carbon india pvt. ltd. bangalore [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - set of pneumatic fittings
supply of supply and fitment of ss metal trough floor below rmpu in place of frp trough in coaches a s per annexure-i and drawing attached. [ warranty period: 36 months after the date of delivery ] ] - supply and fitment of ss metal trough floor below rmpu. 200 coach set
supply of 34277 - prone position with head mirror . polyurethane head cushion foam w ith acrylic mirror.made without dehp , height-14.83 cm,width-30.61 cm, tensile strength [ warranty period: 30 months after the date of delivery ] ] - 34277 - prone position with head mirror . polyurethane head cushion foam with acrylic mirror.made without dehp , height-14.83 cm,width- 30.61 cm, tensile strength
supply of equalising stay pin long with coller to drg.no. wlrrm-0-5-003, alt-g/9. item no.11 and 12 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] bogie shop, rayanapadu, - equalising stay pin long with coller to drg.no. wlrrm-0-5-003, alt- g/9. item no.11 and 12
supply of set of bearing cover (ce) consisting of 1 no inner bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.2, and 01 no outer bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.1 and confirming to clw spec. 4tms.095.003 rev-l, alt.3 and rdso str no rdso/2007/el/str/0017, r ev-1 with latest. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - set of bearing cover (ce) consisting of 1 no inner bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.2, and 01 no outer bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.1 and confirming to clw spec. 4tms.095.003 rev- l, alt.3 and rdso str no rdso/2007/el/str/0017, rev-1 with latest.
supply of rubber stopper assembly for pantograph type ir03h of high speed electric locomotive c lw specification no. clw/es/p-5 alt f m/s contransys pt no. coh200 or similar [ warranty period: 3 0 months after the date of delivery ] ] - rubber stopper assembly for pantograph type ir03h of high speed electric locomotive clw specification no. clw/es/p-5 alt f m/s contransys pt no. coh200 or similar
supply of - main spring assly of pantograph ir-03h contransys specification:- tender title contransys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f 2. item details s.no. pl code item stock / ordering consider approving inspection currency estimated (group) type nonstock for eval agency agency allowed rate gst(y/n) 1 25888183 goods (y) stock --- yes clw tpi agency inr description :description :- main spring assly of pantograph ir-03h contransys specification:-contran sys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f [ warranty period: 30 months after t he date of delivery ] ] trs/gmo, ecr - description :- main spring assly of pantograph ir-03h contransys specification:- contransys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f
supply of compartment door for ac coaches consisting 2 items are : [1] compartment door [with grill] for ac sleeper coaches [lh] to rcf's drg. no.cc56408, alt.no.-'f', item no.- 9 (for make and m odel follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item, qty/kit-1 no. [2] compartment door [with grill] for ac sleeper coaches [r.h] to rcf's drg. no.cc56419, alt. no.-'e', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplie d as loose item qty/kit-1 no [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] page 1 of 6 run date/time: 11/09/2026 11:11:16 stores/east central rly tender document tender no: 04250623b closing date/time: 21/09/2026 14:00 - compartment door for ac coaches consisting 2 items are : [1] compartment door [with grill] for ac sleeper coaches [lh] to rcf's drg. no.cc56408, alt.no.- 'f', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item, qty/kit-1 no. [2] compartment door [with grill] for ac sleeper coaches [r.h] to rcf's drg. no.cc56419, alt. no.-'e', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item qty/kit-1 no
supply of kit for ebc/5 blending unit to ftrtil pt no. 790006105 and d&m pt no. rk-ab578-w398 with solenoid valve kit to ftrtil pt no. 790013115 (10 items 18 nos) as per attached annexure [ warr anty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] smm-d(els) itarsi, wcr - kit for ebc/5 blending unit
supply of fresh air screen ( stainless steel) as per part no: sr-075-73 of m/s. sidwal oe equ ivalent and confirming to rdso specn. no: rdso/pe/spec/ ac/0061-2005, rev-1 suitable for linke hofmann bosch variant coaches [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - fresh air screen etc.