Find the latest side bearer tenders in central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of spring loaded side bearer assembly for blcs wagons as per drg. no. wd-12008-s/01, alt-3. [ war ranty period: 60 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
View Insights
supply of spring loaded side bearer complete assembly to rdso drg. no. contr-9404-s-15, item-1 to 8, alt-13 [ warranty period: 72 months after the date of delivery ] ]
supply of constant contact side bearer assembly (spring loaded type) design - "b" for bvcm/boxns to drg.no. wd-12008-s/1, alt-3. confirming to rdso specification -wd-62-misc-17 amendment no. 1 [ warra nty period: 60 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] bogie shop, rayanapadu,
supply of "constant contact side bearer assembly (spring loaded type) for blcs wagon to rdso drg. no. wd-17025-s/1 alt. 1, conforming to rdso specification no. wd-62-misc-17, revision 1." [ warranty period: 60 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - constant contact side bearer assembly
supply of top side bearer liner to rdso drg. no. wd-14027-s-01- alt 2, item no.11. material and spec ification as per is:3885 pt.1 gr.4 (hardness 380-420 bhn) with proper marking on each liner. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 0 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - top side bearer liner to rdso drg. no. wd-14027-s-01- alt 2, item no.11. material and specification as per is:3885 pt.1 gr.4 (hardness 380-420 bhn) with proper marking on each liner.
supply of constant contact side bearer to rdso specn.no.contr-01-misc -2007, rev.-1 ,am ndt. no.1 [ warranty period: 30 months after the date of delivery ] ] - constant contact side bearer
engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut- cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar- andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in the state of chhattisgarh.
construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellaneous works in connection with kharsia- parmalkasa 5th & 6th new bg line project under south east central railway in the state of chhattisgarh.
corrigendum : engineering, procurement and construction (epc) agreement with schedule g-1 for third line track between manikpur (excluding) to iradatganj (including) (ch: 1257.180 to 1340.820) including electrification & signaling works along with construction of rob on lc no. 404/c2, 406/2t, 407/2e & 418c/2e and rub in lc no 426 in connection with manikpur-iradatganj 3rd line project of north central railway
engineering, procurement and construction (epc) contract for quadrupling (laying of new 3rd & 4th lines) of tracks between sulehali west and kurugunta (kqt) stations including electricfication and signalling &telecommunication works in connection with wadi-secunderabad quadrupling project in the state of karnataka.
south central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for "construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana"
engineering, procurement and construction (epc) tender for"construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, lc work and other miscellaneous works for 25t indian railway standard loading from raxaul (excl.) to narkatiaganj (excl.) (i.e. ch.189.400 to 227.200) (total- 37.80 km) in connection with doubling of raxaul - narkatiaganj section in samastipur division of east central railway"
new broad gauge single line of railway project comprising the section commencing from paradol takeoff point (km 947.257) to nagpur road station ( connecting point-km:964.820) and slewing of existing boridand-chirmiri line from km:946.640 to km: 947.257 in the state of chhattisgarh in the south east central railway zone in epc mode.
engineering procurement and construction (epc) for "construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 26.292 km) in connection with the doubling of the bakhtiyarpur-rajgir - tilaiya section"
engineering procurement and construction (epc) contract for construction of new railway line from rowghat - jagdalpur(140kms) package- i from ch 12+700 to 42+600 from kurkanar to bhanpuri excluding kurkanar station and including bhanpuri station in connection of dallirajhara - rowghat - jagdalpur new railway line in the state of chhattisgarh.
engineering, procurement and construction (epc) for "signalling & telecom works in connection with the 3rd and 4th line between chirailapothu to paharpur and koderma to pradhankhunta (exclusive) (total- 242 km approx) of east central railway
corrigendum : south central railway (construction organization)- engineering, procurement and construction (epc) contract for doubling of track between bommaipalli station & valigonda station including electrification & signaling works in connection with doubling of guntur-bibinagar section and provision of auto fault locator at tss/sp/ssps between kukkadam-valigonda section in the state of telangana.
engineering, procurement and construction (epc) agreement for construction of new bg rail line including earth work, blanketing, minor bridges, major bridges, track works, station building, buildings and other miscellaneous works for 25t indian railway standard loading from sitamarhi (excluding) to rewasi (including) (i.e.ch. 0.700 to 12.400) (total length = 11.70km) in connection with sitamarhi-sheohar new bg rail line project in east central railway in the state of bihar
s&t works comprising trenching, laying of cables, construction of foundations, erection of location boxes, signals and other outdoor equipment, associated wiring in connection with the yard remodeling of 05 stations (talodhi, rajoli, mul-maroda, kelzar and chandafort), including design, supply, installation, testing and commissioning of new ei, msdac, ips, lc gate etc., subsequent modifications to ei systems and associated indoor and outdoor s&t works in station yards and block sections, and s&t works in facilitation of engineering works, in connection with the doubling work of the gondia-chandafort section.
annual maintenance contract for m/s. faiveley make axle mounted disc brake system fitted in lhb coaches at carriage workshop, lallaguda, secunderabad.
scr construction organization- nanded division- proposed yard arrangements at dinegaon yard from km. 167.500 to 170.200 (2.70kms) and jalna yard at km. 174.975 to 177.450 (2.475kms) (total:5.175kms) in connection with proposed doubling of track from chhatrapati sambhaji nagar to parbhani stations and as a part of jalna- jalgaon newline: execution of earth work in formation, construction of minor bridges, fob, station building, rbg rooms, goompties, staff quarters, high level platform, collection of ballast, transportation of p.way materials, laying and linking of track and other connected miscellaneous works etc
construction of substructure of br. no. 382(1x61.0 m owg) & 383(1x61.0 m owg) for two lines and transportation, assembling and launching of superstructure of br. no. 382(1x61.0 m owg),383(1x61.0 m owg) ,br. no. 383(b)(1x61.0 m owg) & 383(c) (1x61.0 m owg), linking of track on bridges, supply & fabrication of pathway materials, and other allied works in connection with doubling of vknrpnya section in samastipur division of e.c. railway.
makholi-mathura section-tsr(p)-98.755 kms by pqrs with contractor's portal 87.569 kms & manual-11.186 kms including subsidiary work with bcm.
s&t work in connections with enhancing the system redundancy by provision of digital axle counters in parallel with track circuits at stations yard in section of kte-sgrl on jabalpur division of west central railway (signalling work).
bilaspur division: tsr(p)-20.294tkm (champa - gevra road section), tsr(p) - 31.677 tkm (bilaspur - anuppur section), tsr(p) -23.428 tkm (anuppur-katni section) & tsr(p)-9.511 tkm (anuppur-ambikapur section), total 84.91 tkm, by contractor's pqrs portal.