Find the latest silent block tenders in central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
(composite tender for track & s & t work) improvement/upgradation works of kalyan yard under aden (ne)kyn under sr den ne
View Insights
(dhanbad division: tsr (p) -37.769 tkm), tsr(p) with new 60kg psc wider/modifed wider sleeper(bytrt)= 37.769 tkm under the jurisdiction of sr.den/2/dhn.
yard improvement and upgradation work at dss,bca, and bju yard under aden/west/bju in connection with "(i) yard improvement and upgradation work of passenger running lines other than main line at station bju,bca,dss,rd & sai under sr.den/iii/see & (ii) yard improvement and upgradation work of non- passenger running lines at station bju,dss,rd & sai under sr. den/iii/see."
work of camc for out of warranty coaches & periodical maintenance of under warranty coaches of pneumatic pressurized flushing system (ppfs) and electro pneumatic pressurized flushing system (eppfs) installed in lhb coaches at dhn coaching depot for the period of 3 years and supply, laying of epoxy flooring in lwaccw, lwaccn, lwaccne, lwscn, lws/ls and lwsczac type lhb coaches at coaching depot, dhn for 3 years.
bina-itarsi & bhopal-sant hirdaram nagar section: execution of turnout sleeper renewal (ttr (tsr)- 14 sets) and renewal of turnouts (ttr (fs+tws+cms)-87 sets) under the sr.den/c/bhopal section.
replacement of flexible wire between point machine and junction box with armoured signaling cable in all the points and other safety works at various locations on bsl division.
s&t work in connection with: rupaund (rpd): extension of de of dn loop (c/loop) l/1 at kte end for long haul formation and goods parking line.
increasing sleeper density (isd) 54.40 km in katni -singrauli section under divisional engineer(east) jabalpur jurisdiction.
dhanbad division:-ctr(s/p)- 15.284 tkm : pka-dhn (2.566 tkm), dhn-jnn (10.842 tkm), pka-peh (0.929 tkm), pka-peh (0.947tkm) in the jurisdiction of sr.aden/2/dhn.
provision of track machine siding facilities for track machines siding at katangi khurd, khanna banjari, beohari, niwas road and sarai gram and (ii) improvement of civil infrastructure at lc no. 59,67,88,105 on katni-singrauli section under jurisdiction of divisional engineer(east) jabalpur
construction of track machine stabling sidings in gwalior-dholpur & birlanagar- etawah sections of jhansi division under sr.den/north jurisdiction.
nanded division : proposed safety related track maintenance works and other miscellaneous track works under sse/pway/j & sse/pway/selu under aden/j's jurisdiction.
comprehensive repair, condition monitoring and maintenance of ccb brake system in 3-phase electric locos. (qty: 20 nos loco set)
three miscellaneous work under divisional engineer (east) jabalpur jurisdiction .part :-1 upgradation of existing infrastructure including construction of new telecom store in premises of sse/ tele / katni under assistant divisional engineer(maintenance) katni sub division. [ part of work :- modernization of s&t infrastructure through construction of new telecom store at jabalpur and new room at katni depot (telecom) over jabalpur division.]part:-2 construction of relay room for provision of axle counter in parallel to track in katni-singrauli section under assistant divisional engineer (maintenance) katni sub division (location -katangi khurd , salhana).[ part of work- enhancing the system redundancy by provision of digit axle counters in parallel with track circuits at station yard on in section of katni -singrauli ].part 3 :- construction of relay room for provision of axle counter in parallel to track in katni-singrauli section under assistant divisional engineer beohari sub-division . (location- niwas road -2, dubri kalan -1, beohari-1, chhataini-1)[ part of work -enhancing the system redundancy by provision of digit axle counters in parallel with track circuits at station yard on in section of katni -sgrl].
p.way work of scy-dure: yard improvement/up-gradation work under aden/l/dnr at station pws, bta, kua, krs & rpr yard.
maintenance of gc line for two years between birlanagar-kailaras section under aden/gwl sub-division of sr.den/north jurisdiction.
tsr 4.448 km , trr 10.20 km and tfr(r) 99.00 km { rubber pad only} on katni singrauli section under jurisdiction of divisional engineer (east) jabalpur
see division - provision of associate s&t work in connection with provision of lhs in lieu of lc no. 1 (bca-vpda) , lc no. 2 (bca-vpda), lc no. 44 (csr-ayrn) and provision of rub in lieu of lc no. 7'b' (vpda-bca), 13'c'(mog-vpda) & lc no. 14'a'(mog-vpda).