Find the latest sofas tenders in central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of sofa set ( 2+1+1) with center table [ warranty period: 30 months after the date of de livery ] ]
View Insights
supply of - sofa (v3) (q2) - | quantity - 1
(i) pardhade: provision of high-level platform at pardhade station of length (375x3.75mx2) (pf 1&2) (pid: 01.01.53.25.3.50.026), (ii)sirsoli- raising of platform from rail level to high level at sirsoli railway station, dn rl pf: 360 m x 4m) & up rl pf : (360m x 4m) (pid : 01.01.53.25.3.50.027), (iii)mahaswad- raising of platform from rail level/medium level (220mx 9.10m) & (144mx9.10m) to high level dn loop pf (240mx7m). (pid : 01.01.53.25.3.50.028), (iv)waghoda : raising and extension of platforms from rail level to high-level platform (555mm x6mm,) including toilet, sitting arrangement, drinking water and drainage arrangement etc. at waghoda railway station. (pid: 01.01.53.25.3.50.030), (v)dongargaon : raising and extension of platform from rail level to high level up (360m x 8m) & dn (380m x 8m), including toilet, sitting arrangement, drinking water and drainage arrangement etc at dongargaon station. (pid : 01.01.53.25.3.50.031), (vi)provision for divyangjan amenities at asirgarh, bagmar, mandwa & duskheda on railway stations.(nsg-6) (pid : 01.01.53.25.3.50.029).
complete internal electrical and mechanical furnishing with stripping and fitment of seating arrangement along with supply and application of paint in lhb coaches during mlr schedules" at rcnk/jhs.
a) miscellaneous annual maintenance work of quarters in lieu of zonal work under sse (wks) tna for year 2026-27.b) thane (nsg 1) - renovation of vartak nagar prs building, provision of additional lights, fans & sitting arrangements and provision of cop from main gate to entrance gate of main prs and allied facilities. c)miscellaneous annual maintenance work at station areas, platforms and service building in lieu of zone under sse(w)tna for year 2025-26.
repair/overhauling work of furnishing activity for icf & lhb ac & non-ac and all ocv/pcv coaches as per scope of work at motibagh workshop, nagpur
custom bid for services - general carpentry plumbing and passenger amenity attention work round the clock in bg railway coaches at coaching depot jbp during primary and other end maintenance
tna-klva - rendering service for maintenance work including supply of materials for colonies under sse(w)tna for 24 months: o mprehensive breakdown of the schedule:, schedule 1: part 'a' ns items, description: supply of skilled/unskilled staff/labours under sse(wks)tna total value for part a: 1,08,81,792.00, ns1 supply of skilled mason (1 nos), quantity: 24.00 month | unit rate: 29,896.00 | total amount: 7,17,504.00, ns2 supply of skilled carpenter (1 nos), quantity: 24.00 month | unit rate: 29,896.00 | total amount: 7,17,504.00, ns3 supply of skilled g/fitter (1 nos), quantity: 48.00 month | unit rate: 29,896.00 | total amount: 14,35,008.00, ns4 supply of skilled p/fitter (1 nos), quantity: 24.00 month | unit rate: 29,896.00 | total amount: 7,17,504.00, ns5 supply of skilled painter (1 nos), quantity: 24.00 month | unit rate: 29,896.00 | total amount: 7,17,504.00, ns6 supply of unskilled labour/khalashi (10 nos), quantity: 240.00 month | unit rate: 24,912.00 | total amount: 59,78,880.00, ns7 supply of unskilled safaiwala (1 nos), quantity: 24.00 month | unit rate: 24,912.00 | total amount: 5,97,888.00, schedule 2: part 'b' ns items, description: supply of material to rendering service for maintenance under sse(w)tna for 24 months total value for part b: 19,38,544.00, ns1 ordinary portland cement grade-53 grade, quantity: 12.00 mt | unit rate: 6,210.00 | total amount: 74,520.00, ns2 white cement, quantity: 6.00 mt | unit rate: 12,937.50 | total amount: 77,625.00, ns3 stone aggregate broken : 20 mm nominal size, quantity: 20.00 cum | unit rate: 805.00 | total amount: 16,100.00, ns4 coarse sand (minimum zone iii ), quantity: 80.00 cum | unit rate: 1,380.00 | total amount: 1,10,400.00, ns5 f.p.s. bricks class designation 7.5, quantity: 16,000.00 (per 1000 nos.) | unit rate: 4,025.00 | total amount: 64,400.00, ns6 hydraulic door closer isi marked (is:3564-1996), quantity: 40.00 each | unit rate: 314.64 | total amount: 12,585.60, ns7 fly proof wire mesh, quantity: 600.00 sqm | unit rate: 149.50 | total amount: 89,700.00, ns8 brass tower bolt (barrel type) 250x10 mm, quantity: 300.00 each | unit rate: 165.60 | total amount: 49,680.00, ns9 block board construction flush door with commercial ply on both faces 35 mm thick, quantity: 120.00 sqm | unit rate: 726.80 | total amount: 87,216.00, ns10 1.0 mm thick decorative laminated sheet (mat finish), quantity: 120.00 sqm | unit rate: 316.25 | total amount: 37,950.00, ns11 frosted glass sheet of nominal thickness 4 mm (weighing not less than 10 kg/sqm), quantity: 160.00 sqm | unit rate: 460.00 | total amount: 73,600.00, ns12 ply wood 5 ply with commercial ply on both faces 6 mm thick, quantity: 480.00 sqm | unit rate: 253.00 | total amount: 1,21,440.00, ns13 flat pressed 3 layer and graded particle board medium density ) grade i conforming to is-3087-18 mm thick, quantity: 400.00 sqm | unit rate: 498.46 | total amount: 1,99,384.00, ns14 veneered particle board with commercial veneering on both sides 12mm thick, quantity: 200.00 sqm | unit rate: 379.50 | total amount: 75,900.00, ns15 synthetic enamel paint in all shades, quantity: 240.00 litre | unit rate: 109.25 | total amount: 26,220.00, ns16 plastic emulsion paint, quantity: 240.00 litre | unit rate: 204.70 | total amount: 49,128.00, ns17 oil bound washable distemper / acrylic distemper, quantity: 240.00 kg | unit rate: 86.25 | total amount: 20,700.00, ns18 water proofing cement paint / snowcem, quantity: 400.00 kg | unit rate: 31.05 | total amount: 12,420.00, ns19 plaster of paris, quantity: 400.00 kg | unit rate: 4.89 | total amount: 1,956.00, ns20 rectangular shape 600x450 mm precast r.c.c. manhole cover with frame-ld-2.5, quantity: 100.00 each | unit rate: 1,039.97 | total amount: 1,03,997.00, ns21 ceramic floor tiles group b-ii clause 5.1 of size 400x400 mm & above, quantity: 160.00 sqm | unit rate: 419.75 | total amount: 67,160.00, ns22 polyethylene vinyl chloride water storage tank with cover and suitable locking arrangement, quantity: 80,000.00 litre | unit rate: 4.31 | total amount: 3,44,800.00, ns23 white plastic w.c seat (solid) with lid c.p. brass hinges and rubber buffers, quantity: 20.00 each | unit rate: 455.40 | total amount: 9,108.00, ns24 mirror of superior make glass 60x45 cm (with 5-6 mm thick base complete), quantity: 120.00 each | unit rate: 287.50 | total amount: 34,500.00, ns25 semi rigid pvc waste pipe for sink and wash basin 32 mm dia (min 700 mm length), quantity: 400.00 each | unit rate: 26.50 | total amount: 10,600.00, ns26 coloured high density polyethylene polypropylene 10 lit. (full flush) capacity controlled, quantity: 160.00 each | unit rate: 1,046.59 | total amount: 1,67,454.40, schedule 3: part 'c' ns items, description: supply of material to rendering service for maintenance under sse(w)tna for 24 months, total value for part c: 7,72,396.60, ns1 supply of 15 mm dia c.p. brass angle cock with flange (seiko, goldline or similar), quantity: 240.00 each | unit rate: 462.04 | total amount: 1,10,889.60, ns2 supply of nylon rassi 4 mm thick of good quality, quantity: 300.00 kg | unit rate: 194.09 | total amount: 58,227.00, ns3 supply of cpvc pipes 20 mm dia, quantity: 400.00 metre | unit rate: 110.00 | total amount: 44,000.00, ns4 supply of cpvc pipes 25 mm dia, quantity: 300.00 metre | unit rate: 170.00 | total amount: 51,000.00, ns5 supply of cpvc fittings: elbow 90 degree 20mm efm thrd tee (brass fbt), quantity: 100.00 each | unit rate: 120.00 | total amount: 12,000.00, ns6 supply of cpvc fittings: male thrd adapter (brass mabt) 20mm, quantity: 100.00 each | unit rate: 166.00 | total amount: 16,600.00, ns7 supply of swr pvc pipe type a: single socket 10' (3mtr) 90mm, quantity: 280.00 metre | unit rate: 212.00 | total amount: 59,360.00, ns8 supply of swr pvc pipe type a: single socket 10' (3mtr) 110mm, quantity: 300.00 metre | unit rate: 230.00 | total amount: 69,000.00, ns9 supply of swr pvc pipe type a: double socket 10' (3mtr) 90mm, quantity: 300.00 metre | unit rate: 243.00 | total amount: 72,900.00, ns10 supply of swr pvc pipe type a: double socket 10' (3mtr) 110mm, quantity: 360.00 metre | unit rate: 265.00 | total amount: 95,400.00, ns11 supply of swr pvc pipes fitting type a: plain "y" 90 mm, quantity: 40.00 each | unit rate: 179.00 | total amount: 7,160.00, ns12 supply of swr pvc pipes fitting type a: plain "y" 110 mm, quantity: 60.00 each | unit rate: 238.00 | total amount: 14,280.00, ns13 supply of swr pvc pipes fitting type a: double plain "y" 90 mm, quantity: 80.00 each | unit rate: 288.00 | total amount: 23,040.00, ns14 supply of swr pvc pipes fitting type a: double plain "y" 110 mm, quantity: 60.00 each | unit rate: 313.00 | total amount: 18,780.00, ns15 supply of pvc pipes high pressure (40 mm), quantity: 320.00 metre | unit rate: 134.00 | total amount: 42,880.00, ns16 supply of heavy duty 22" long drawer channels, quantity: 400.00 each | unit rate: 192.20 | total amount: 76,880.00,
secunderabad division electrical maintenance department - (i) lingampalli - new tte rest house with 30 beds (24 beds for male ttes and 06 beds for lady ttes with separate toilets) with acs, kitchen, store, ro water and furniture provision (ii) construction of new running room at lpi with 40 beds - electrical arrangements.
lnr - provision of fob with ramp at lunirichha to eliminate deficiency in mea and thuria - provision of fob with ramp at thuria to eliminate deficiency in mea and krls - provision of fob with ramp at kurlasi to eliminate deficiency in mea and dkra - provision of fob with ramp at dhuankheri to eliminate deficiency in mea and providing power supply through at, procurement of furniture, oil based heaters, mink blankets, and hot-cold water dispensers for the running room of kota division, crew & guard lobbies including provision of modular furniture, supply, computerization (computers, printers, scanners, ups) & other associate facilities. (electrical g work for provision of at supply at jlwc running room and electrical g work for provision of at supply at bxn running room and electrical g work for provision of at supply at swm running room) and interlocking of non- interlocked lc gate having tuv more than 20000 on kota division" (lc 13 on kota-rta sec.) and construction of s&t building in connection with interlocking of lc no: 08, 14, 51, 65, 68, 93 of kota-cor section of kota division.
chabra googor :- provision of new rpf barracks with furniture of 15 beds capacity in chabra googor(cag).
zone no.6:-zonal works for wood work falling in fromg.t. road rob (including) to the end of jurisdiction ofaen/i/mgs on main line and gc all service buildings of up anddn yard including running room no. 555 and 1102 and c&tebarrack and all staff quarters falling in i.i. colony, stationstation, shastri colony, new shastri colony, rpf colony andservice building such as i.i. stadium, north side of track fromrob (g.t. road excluding) viz (a) european colony, (b) stationcolony, roza colony to plant depot colony staff quarter and allservice building including drm office, old and new officersrest house, new station building. old station building includingecrku office, traffic hospital platform, circulating area ofstation east, west and central cabin, yards between rob andart siding (excluding) etc under aden/hq/ddu.
four miscellaneous electrical work (i) construction of new 50 bedded running room with lobby at rewa under aden/n/sta sub division (ii)construction of rpf out post building with furniture at majhgawan (iii)upgradation/ modification of rpf barrack with furniture at rewa and (iv) construction of new building office sse/pw/usfd behr at behr station under aden/behr sub division
zone no.2:-zonal works for wood work falling indiesel colony, hopper colony, loco colony, central colony,new central colony, police colony of staff quarters, artsiding and yard from old rob to end of jurisdiction of aldup & dn line lko- passenger and goods line and includingall cabins, p.way training school, tli office, up yardcolony, gaya colony, manas nagar colony, of staff quartersand service buildings viz trs training school and hostelmanas sansthan, rpf up post, rpf barrack, sub station,rcc oh tank, steel oh tank, atp school, pump house,telephone exchange, health unit and sub station etc. underaden/hq/ddu.
fabrication, furnishing & installation / mounting of bus body on the road mobile relief vehicle gvw-28t
zone no.12:-zonal contract for all civil repairing works,pipe line, sanitary works and other wood works falling in trsshed, diesel shed under aden/hq/ddu.
corrigendum : supply of set of sliding door with assembly for bcnhl wagon conforming to rdso drawing/ spec. no.wd-10068-s-17 item no.1 to 7 with latest modifications as per drg.no. rdso drawing/ spec. no.w d-10068-s-17 specn: rdso drawing/ spec. no.wd-10068-s-17 item no.1 to 7 with latest modifications. [ warranty period: 30 months after the date of delivery ] ]
supply of flap door arrangement(reduced height-retrofitment) for boxn variants to rdso dr awing no. wd-23018-s-01, alt-4, consisting of item no. 1,4,5,6,7,9,10 & 19. [ warranty period: 30 mont hs after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of single piece frp louver shutter (2'-0'' wide window), supplied in satin blue colour to is 5/2007 (shade no.177) to drg. no. rdso sketch-97020, alt.8 with frp/smc to str no. rdso/2007/cg -01, with amendment no. 3 of february 2019 & rdso/2007/cg-02 (rev.01) with amendment no. 2 of a ugust 2016. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of door hand hold for 'boxn' wagon to irs's drg. no.w/ml-6, alt. no-3 (three). [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] dy.cmm,wrs,kota, wcr
supply of supply of vestibule sliding door for lhb/eog coaches to drg.no. lscn/eog-2-5- 0 01, col-i, alt-a. [ warranty period: 36 months after the date of delivery ] ]