Find the latest subway tenders in central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
improvement of structural life composite robs and tgbs by metallising and conventional painting over various sections (dw-pnvl ,mnkd-pnvl, kyn-lnl) of mumbai division. (8 bridges)
View Insights
ned div: bridge zonal works under den/ne/ned jurisdiction. section pau -pmkt excluding pau and section mlsu - akot excluding mlsu.
ohe modification work in connection with construction of rob in lieu of level crossing gate no.69 at km.92/41-42 in ksra-igp section of mumbai division of central railway
electrical(g) portion of work for:-(1) construction of rub at km. 725/25-27 in lieu of lc no. 369 between bsp-dph section in howrah-mumbai main line (2) construction of rub near lc no. 375(otgan) in between byl-dgs section (km. 739/3-5) on howrah-mumbai main line (3) construction of rub by box pushing method in lieu of lc no. 376 at km. 741/26 between npi-dgs section on ngp-hwh main line. (4) provision of rub in lieu of lc no.389 at km.774/13-15 between byt- hn station. (5) construction of rub on km. 785/23-25 in lieu of lc no. 394(khapari gate) in between hn-tld section in howrah-mumbai main line (6) construction of rub on km. 807/7-9 in lieu of lc no. 406, between slh-mdh section in howrah- mumbai main line (7) construction of rub at km 874/2-3 in lieu of manned lc no. dd-8 between mxa-rsa section of raipur division. (8) construction of rub at km 889/7-8 in lieu of manned level crossing no. dd-19 at rsa yard of raipur division. (9) construction of rub at km 947/1-2 in lieu of manned lc no. dd-59 at kys yard of raipur division.
strengthening of fob by replacement of steel girder, corroded steel member, rcc slab etc at fob between patna saheeb and gulzarbagh stations on main line of danapur division
ohe modification work in connection with construction of rob in lieu of level crossing gate no.34 at km.130/7-8 in kyn-lnl section of mumbai division of central railway
1.aden sgz :- repairs to fob at goh station 2.aden/sgz section:- repair to valley gutter & repainting of cop's at station goh, sgz,sva, nkh, cmu, vma, lnr, mep and rlk
repairs painting of rob no. 264 at km 101/10-12 & pipeline painting at km. 100/46-48 with power block under aden/rnq.
s&t works in connection with: construction of 12 mtr foot over bridge at cmu, vma,sgz & goh and bwm station.
inspection of br. no.-10 up (15x61.00m owg) & rob-23a (1x60.0 m bsg) in kir- bju section under sse/bridge/mgr and br.no.-78up(2x18.3+8x76.2+4x18.3m owg) & rob govindchak (2x60.0m bsg) in hjp-ci section, rob-47a (1x56.60 m bsg) in kir-bju section & rob 3 spl(1x50.0m bsg) in hjp-mfp section under sse/bridge/see using high resolution image & video capture uav/drone under sse/bridge/see of sonpur division.