Find the latest drain tenders in east central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
(1)construction of sanded dead end and buffer stop work and sand hump under the jurisdiction of aden/cwa & nir. & (2) provision of yard drain at cwa,ula,bdkd,klod,nir,btc under the jurisdiction of aden/cwa & nir.
View Insights
improvement to road surface & drain and provision of cover shed at lhs no. 29,32 & 41 under aden/lthr.
construction of stp plant as per required capacity (approx 0.4 mld), construction of drain and other ancillary work at ara.
balance work of snmy and sndt yard like curtain wall, retaining wall, buffers, central drain, boundary wall, toilet complex and other miscellaneous work in the section of aden/2/dhn.
special repair of staff quarters by leaky roof repair, drain, septic tank, etc at way side station in gc-1 under sr.den/i/ddu.
(i) drainage system rectification measures at rub no. 130 & 132 with cctv, w.l. indicator, road signages board & speed breaker between gwh-deia section. (ii) drainage system rectification measures at rub no. 140 & 144 with cctv, w.l. indicator, road signages board & speed breaker between gwh-diea section. (iii) drainage system rectification measures at rub no. 153 & 156 with cctv, w.l. indicator, road signages board & speed breaker between gwh-deia section & (iv) drainage system rectification measures at rub no. 163 & 166 with cctv, w.l. indicator, road signages board & speed breaker between gwh-deia section.