Find the latest gangway tenders in east central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
cess repair work under the jurisdiction of sse/p.way/bmy from h-cabin to p/cabin to repair low cess and high bank side slopes.
View Insights
yard improvement and upgradation work at rd and sai under aden/south/mfp in connection with "(i) yard improvement and upgradation work of passenger running lines other than main line at station bju, bca, dss, rd & sai under sr. den/iii/see & (ii) yard improvement and upgradation work of non-passenger running lines at station bju, dss, rd & sai under sr. den/iii/see."
shifting of ohe mast and lt crossing in connection with construction of new major bridge no.- 47 (18x18.3m composite girder) over river dhadhar at km 33.087 between sarsu & oro statlon , minor bridges, rub, retaining wall, earthwork, blanketing and track linking in diversion on both approaches of major bridge to connect existing track in rajgir- tilaiya section.
electrical work:1 part a:-provision of 3m wide fob & high level pf at deoria kurmaha naresh halt station (dkmn) in gc section. part b:-provision of 03 m wide fob with high level pf at chirailla pauthu (cpbh) halt station in gc section. part c :provision of 03 m fob wide with ramp and high level pf with divyangjan amenities & other amenities at karwandia (kwd) station in gc section. part d :provision of high level platform with divyangjan amenities and other amenities and ramp at existing fob at kmge station.part e: replacement of old fob , surfacing of pfs and divyangjan facilities at seb station.
(a) provision of maintenance terminal console (mtc)/network management system for kyosan make electronic interlocking in dhanbad division. (b) provision of multi section digital axle counter (msdac) in salaibanwa (slbn) yard under dhanbad division. (c) provision of dog kennel at dhn. (d) development of shunting track of jharia line to washing pit from kalka end in coaching depot, dhanbad. (e) electrical work in connection with installation of habd under dhn division. (f) installation of rolling-in/out examination lighting arrangement at svpo, plbs, bukru, bumh & tori siding line. (g) provision of gang hut at churki under aden/cpu.
1. provision of civil infrastructure for track machine staff in raipur division. (this work primarily includes construction of one seminar hall (9m x 8m), one counselling room (6m x 4m), one visitor room(2m x 4m), pathway 48m and boundary wall of length 71m.)2. provision of sound proof acoustic system at railway institute bmy.
zone no.11:-zonal contract for all civil repairing worksfalling in new station building. old station building includingecrku office, traffic hospital platform, circulating area ofstation east, west and central cabin, yards between rob andart siding (excluding) under aden/hq/ddu.
zone no.6:-zonal works for wood work falling in fromg.t. road rob (including) to the end of jurisdiction ofaen/i/mgs on main line and gc all service buildings of up anddn yard including running room no. 555 and 1102 and c&tebarrack and all staff quarters falling in i.i. colony, stationstation, shastri colony, new shastri colony, rpf colony andservice building such as i.i. stadium, north side of track fromrob (g.t. road excluding) viz (a) european colony, (b) stationcolony, roza colony to plant depot colony staff quarter and allservice building including drm office, old and new officersrest house, new station building. old station building includingecrku office, traffic hospital platform, circulating area ofstation east, west and central cabin, yards between rob andart siding (excluding) etc under aden/hq/ddu.
zone no.2:-zonal works for wood work falling indiesel colony, hopper colony, loco colony, central colony,new central colony, police colony of staff quarters, artsiding and yard from old rob to end of jurisdiction of aldup & dn line lko- passenger and goods line and includingall cabins, p.way training school, tli office, up yardcolony, gaya colony, manas nagar colony, of staff quartersand service buildings viz trs training school and hostelmanas sansthan, rpf up post, rpf barrack, sub station,rcc oh tank, steel oh tank, atp school, pump house,telephone exchange, health unit and sub station etc. underaden/hq/ddu.
zone no.8:-zonal works for all civil repairing worksetc falling in north side of track from rob (g.t. roadexcluding) viz (a) european colony, (b) station colony, rozacolony to plant depot colony staff quarter and all servicebuilding including drm office, old and new officers rest houseetc under aden/hq/ddu.
zone no.5:-zonal work for all civil repairing works etcfalling in from g.t. road rob (including) to the end ofjurisdiction of aen/i/mgs on main line and gc all servicebuildings of up and dn yard including running room no. 555and 1102 and c&te barrack and all staff quarters falling in i.i.colony, station station, shastri colony, new shastri colony,rpf colony and service building such as i.i. stadium etc underaen/hq /ddu.
zone no.3:-zonal work for pipeline & sanitation fallingin diesel colony, hopper colony, loco colony, central colony,new central colony, police colony of staff quarters, art sidingand yard from old rob to end of jurisdiction of ald up & dnline lko-passenger and goods line and including all cabins,p.way training school, tli office, up yard colony, gayacolony, manas nagar colony, of staff quarters and servicebuildings viz trs training school and hostel manas sansthan,rpf up post, rpf barrack, sub station, rcc oh tank, steeloh tank, atp school, pump house, telephone exchange,health unit and sub station etc. under aden/hq/ ddu.
(i) electrical work in connection with renovation work of old station with latest equipment & enhancement of internet speed at zrti/mfp.(ii) electrical work in connection with provision of 60 beded new rpf barrack at mfp under samastipur division.
zone no.12:-zonal contract for all civil repairing works,pipe line, sanitary works and other wood works falling in trsshed, diesel shed under aden/hq/ddu.