FILTERS
supply of manufacture and supply of fabricated anti creep device for 10125 mm curved switches with zu-1-60 thick web tongue rails b.g. (1673 mm) for 60 kg (uic) on psc sleepers as per rdso drg.no. rdso/ t-8782 & rdso/t-8783 complete with fittings (including 27 mm dia. hts bolt with nut to drg.no. rdso/t-8 786 & rdso/t- 8787and hardened packing plate to drg. no. rdso/t-8784 & rdso/t-8785) acd material s hall be structural steel confirming to the requirement of grade e-350/br of is: 2062-2011 "indian standard hot rolled medium and high tensile steel - specification"(seventh revision). notes : (i) the 27 mm dia hts bolt and nut shall be confirm to is:3757 & is:6623. the dimension of hts bolts and nuts shall be as per dra wing no. rdso / t-8786 & rdso/t- 8787. these bolt and nuts are shall be arranged and supplied by the su ppliers /tenderers. (ii) hardened packing plate shall confirm to is : 6649 and material 45c8 steel according to is:1570(part 2). the dimension of hardened packing plate shall be as per drawing no. rdso/t-8784 & r dso/t- 8785. hardened packing plate shall be arranged and supplied by the suppliers /tenderers. (the alte ration in drawing and specifications issued by rdso up to one month prior to tender opening date shall be applicable to this tender.) [ warranty period: 30 months after the date of delivery ] ]
View Insights
supply of key switch simulation (pos no 179) as per clw spec no- clw/es/3/0079 alt-a and abb document no3ehp585704r2222 or clw drg no clw/es/3/sk1/0079 alt-a. as per drg.no. clw drg no clw/es/3/sk1/0079 alt-a. specn: clw spec no- clw/es/3/0079 alt-a [ warranty period: 30 months a fter the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] dls/raipur, secr
supply of bush cam roller fip lifter15mm to drg. no.tpe-16-0054 [ warranty period: 30 mo nths after the date of delivery ] ]
supply of side stopper (rubber) for wag-7 loco as per clw drg. no. 06/3/1 5/47 'alt. 2 with lat est. [ warranty period: 30 months after the date of delivery ] ]
supply of zero toe load fastening system (ztlf) for h-beam sleepers for bg 60 kg rails as per rdso drawing no. t-8759 to t-8765. 1 set of fastening consists of 02 nos. of rail pad with embedded steel plate (t-8761), 02 nos. of special cast galvanized liner (inner) for 60 kg uic rail (t- 8762), 02 nos. special cast galvanized liner (outer) for 60 kg uic rail (t-8763) and 04 nos. erc mk-v (t-5919). [ warranty period: 3 0 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of supply of fixing clip 72 mm dia. confirming to rcf drg. n0: lp63137 ]
supply of poh kit for adapter plate assembly/intermediate piece of c3w type d.v. of freight stock as per greysham drg.no.-g/c3w/78868308 item no.12,13 & 14, one set consists of following items-1. o ring, gipl part no.gi/c3w/0015/149 qty.-2 nos/set, 2.vave assembly,gipl part no.gi/c3w/192057 qt y.1no/set 3.spring gipl part no.-gi/c3w/192058 qty.1 no/set.make-gipl ,sil or equivalent. specn: con firming to rdso specification 02-abr-02 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of kit for direct br manifold ftrtil pt. no. -790006155 comprising of :- (i) seal ftrtil pt. n o-009702500 - 01no/set (ii) o- ring ftrtil pt. no.-018704500a - 05nos./set [ warranty period: 30 mo nths after the date of delivery ] ]
supply of kit for ep relay valve for e-70 brake system as per ftrtipl part no 790 013 105 and d &m part no. rk-ab914-w47 comprising of 10 items in 13 pieces as per annexure - i. [ warranty peri od: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of set of maintenance kit for latched isolating cock 1-1/4" (vented), bp isolating cock with switch 1-1/4" and manifold mounting cock of e-70 brake system as per ftrtipl part no. for 3 phase lo co. set details as per annexure-i [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of kit for isolating assly (ftrtipl pt no. 790005105) comprising of 05 items as per annexu re attached. [ warranty period: 30 months after the date of delivery ] ] trs/ddu, ecr
supply of cost of hydraulic re-railing equipment (hre) as per attached technical specification no. ec r/hre/2026 (one set of hre means basic equipment and items mentioned in para 4.2 of section iv of technical specification uploaded with the tender ) with warranty of 24 months from the date of commissioning. ]
supply of spindle for hand brake for brhnehs wagon as per rdso drawing no.- wd-04004-s-60, alt.-1 item no.- 04 and 05. material and spec. as per drg. [ warranty period: 30 months after the da te of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of baby foot step for 3-phase locomotives (with red oxide painted) as per s.c.rly. drg.no.c/el s/lgd/b.f/3/27, alt-2 [ warranty period: 30 months after the date of delivery ] ]
supply of apd for primary & secondary brake beam pin for bmbs bogie as per drg. no. wr/dhd/wn/4- bt-011. [ warranty period: 30 months after the date of delivery ] ]
supply of spheri block for axle guide link / tm torque arm for wap7/wag9 locos as per rdso spe cn. no. rdso/2007/el/spec/0051 rev. '4'. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of earthing and bonding system as per rdso spec. no. rdso/spn/197/2008, rdso dr g. no. sdo/rdso/e&b/001 dt. 19.09.08 and rdso drg. no. sdo/rdso/e&b/002 dt. 19.09.08. earthing and b onding system for relay room , ips room ,spd box, operator panel in sm's room, signalling equipments in s tation building, block circuit, ssdac,etc. supply of"permanent and maintenance free earth pits materials".1 set pmf earth pit consisting of: i) 17 mm diameter and minimum 3 m long copper bonded steel rod - 1no. ii ) gem 25 lb - 3 bags. iii) 25*6*150 mm cu bus bar- 2 no. iv) supply for connection between earthpits and m ebb it includes 35 sq mm multistrand pvc insulated single core cu cable (15 mtr lump sum).supply for inter nal connection from mebb to sebb and to other equipments.(50 mtr lump sum).it includes 16 sq mm and 1 0 sq mm multi strand pvc insulated single core cu cable. [ warranty period: 30 months after the date of d elivery ] ]
supply of brake gear arrangement and details for wag9hc loco to set list no. el291 40225 rev.-03, specification no. m&c/mtd/101/2007, confirming to modifications advices is sued by clw letter nos. eldd/3758/pt. 81 vol. 2 dated 26.10.19, eldd/3758/pt. 201 dated 20. 03.20, eldd/3758/pt. 81 vol. 3 dated 21.02.22 and plw letter no. plw/m/drg/loco/el- 101 da ted 11.04.22, and str no. clw/2022/eldo/m/str/0133 rev. 0. specifications: dmw purchase s pecification no. d10011, dated: 13.11.2009, dmw material treatment no. d99999 va, dated: 2 8.8.2008, rdso spec. no. m&c/mtd/101/2007. drawings:1209-01-116-059-alt.-5, 1209-01- 116-060 -alt.-nil, 01/3/19/56 alt. 11. [ warranty period: 30 months after the date of delivery ] ]
supply of disconnecting & earthing device, 8 pole, 2 way, no off, on load 63a, 750 v ac (1000v insulation) , 2 no + 2 nc with heavy handle and pad locking arrangement in earth position, mounted i n a stainless steel enclosure suitable for ac 23 duly confirming to is:13947/iec947, item no. 12 a1 as per specification edts-355,rev-1,amendment-1,2,3,4,5 & 6 with icf annexure-1,2 & 3 make - schalt bau/l&t drawing no. - m137.0827407 of m/s schaltbau or cat. no.73342slb321 ogb of m/s l&t [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of supply installation, testing & commissioning of cab air conditioner hvac unit with built in in verter by cutting the roof and wielding mounting frame and making provision of drain arrangement as per specification no. wag4/el/ps/35 (rev.03) or latest. blw- vendor-id:2201230. [ warranty period: 30 m onths after the date of delivery ] ]
supply of manual uncoupling device for 'h' type cbc coupler of 3-phase loco as per d rg. no. ngp/trs/4/25.224 alt. 'o' as per drg.no. ngp/trs/4/25.224 alt. 'o' [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of set of items for brake rigging of wag9hc loco. one set consist of following items: (1) bu lb head cotter size 10 mm dia, 12 mm width, 65 mm long x 5 mm thick as per is 2638/1974 with zinc coating, qty. 48 nos. (2) split cotter pin size dia 4 mm x 72 mm long, material steel is 549, qty. 16 no s. (3) split cotter pin size dia 6.3 mm x 80 mm long, material steel is 549, qty. 24 nos. (4) split cotter pin size dia 3.2 mm x 40 mm long, material steel is 549, qty. 40 nos. (5) dowel (roll) pin size dia 4m m x 45 mm long, material spring steel is 2507, qty. 08 nos. (6) threaded stud size 16 x 65, fine pitch 1.5 mm, grade 8.8, qty. 04 nos. (7) machined flat washer size od 56 mm, id 30 mm, thickness 02 m m, material steel is 2016,1967, qty 04 nos. (8) machined flat washer size od 56 mm, id 36 mm, thic kness 02 mm, material steel is 2016,1967, qty 04 nos. (9) machined flat washer size od 44 mm, id 2 6 mm, thickness 02 mm, material steel is 2016,1967, qty 04 nos. (10) machined flat washer size od 56 mm, id 30 mm, thickness 03 mm, material steel is 2016,1967, qty 04 nos. (11) machined flat was her size od 56 mm, id 36 mm, thickness 03 mm, material steel is 2016,1967, qty 04 nos. (12) machi ned flat washer size od 44 mm, id 26 mm, thickness 03 mm, material steel is 2016,1967, qty 04 nos . [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of center rod for m/s. crimpwell make pinion mounting & extractor machine model no. htmda mfg. 10/2020 as per m/s. crimpwell part no. htmdtr or equivalent. make: crimpwell or equivalent. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of flexible cover for tm 6fra6068 of loco wag-9/wap-7 as per els/bia drg. no. els/bia/e3/20 26/07-01. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
corrigendum : supply of supply and commissioning of lock bolting machine with power pack and tool size- 1/2", 3/4", 5/8" & 7/8" with all concomitant accessories as per annexure-a & b. make: stanley, huck, avlock, renewed , orione or similar. [ warranty period: 30 months after the date of delivery ] ]
supply of set of overhauling kit for cock of electric ccb system. one set consisting of 04 sub kits. item details as per kbi annexure attached. [ warranty period: 30 months aft er the date of delivery ] ] trs/ddu, ecr
supply of compensating plate (big) for wap-7/wag-9 locos as per clw drg. no. 1209.01.415.011, alt- 1. note: ten samples should be got approved before effecting bulk supply. [ warranty period: 30 months after the date of delivery ] ]
supply of back stop to drg. no. w/bd-699, alt-4 or latest. [ warranty period: 72 months after the dat e of delivery ] ]
supply of ioh kit for laxven make energy cum speed recording system, model no.- lax-2000e2 c onsisting of 37 items as per annexure attached. [ warranty period: 30 months after the date of deli very ] ] gsd/ghz, ecr
supply of frp type hinged point jb 10mm thick of size, 410 x 260 x145mm, weighing approx. 11.5kg.( +/-10% in weight) , as per rdso spec no.rdso/spn/151/1997 made fire retardant gp resin with 2 5%-30% glass content including 2nos. 40 x40 x 6 mm frp angle of 1000mm length with provision for fixing of angle to the body of point jb & 4 nos. pbt ara terminal 6 way fixed and duly fitted on frp sheet in point jb and 2 nos. gi/frp bent pipe of 35mm dia. 2 nos. extra half drilled holes which can be drilled finally at sit e if required to be provided on sides of the box and with the provision of two support angles for erection pur pose as per drawing drg no. drg/misc/19/01 .(drawing attached) [ warranty period: 30 months after th e date of delivery ] ]
supply of brake head assly. for wag-7 loco,clw drg.no.- 06/2/19/109 alt.-nil with latest alt. [ wa rranty period: 30 months after the date of delivery ] ]
corrigendum : supply of supply of ss worm driven clip for 100 mm od pipe confirming to is 304. ]
supply of slack adjuster complete. specn/ drg no :- abb drg.no.- ib 011-00259, clw drg. no. 120 9-01.116-006 alt-3 with latest alteration. [ warranty period: 30 months after the date of delivery ] ]
supply of flush pipe arrangement (for pan lavatory). icf drawing no.wcbac6-6-3-609, alt-h/nil, it-3 wit h fish tail flashing head to drawing no. rdso's sk-85072, alt.-1 in assembled condition. other end of the pi pe should be threaded for fixing with push type flushing [ warranty period: 30 months after the date of de livery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: m ax 8 lacs ] ]
supply of set of c runer for l.h.b ac/nac/coaches as per drg no.(i)310113.0.05.000.102 altr, qt y:01 no.(ii) drg no. -310113.0.05.000.103 alt -r qty-01 no. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sse/draw and buffering gear,
supply of set of rubber items for pantograph isolating cock [kaba key] for pneumatic panel of wa g-9/wap-7 locos provided in the e-70 brake system consisting following items: - [1] valve sent qty./s et- 01 material specn. silicon rubber pce ref- 10. [2] o ring qty./set- 01 material specn. silicon rubb er pce ref- 16. [3] o ring qty./set- 01 material specn. silicon rubber pce ref- 18. [4] key way ring qt y./set- 01 material specn. silicon rubber pce ref- 19. specification: clw spec. no. clw/es/sk-3/0049 alt-e. or latest. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of modified single duct leather bellow for wag9/wap7 locos. specn/ drg. no - clw drg. no. 1209-01.018.029 or latest rdso specn. no. spec/e-7/06 rev-2 or latest. str no.- clw/2022/eld o/m/str/0145 rev 0 or latest. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of aoh kit for high reach pantograph type wbl85hr, make-schunk each kit con sists of 7 items as per annexure attached [ warranty period: 30 months after the date of deli very ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - aoh kit for high reach pantograph
supply of gaskets for m/s. shil make transformer oil pump, to type acpd175 for 3 phase locos, s et consists of 4 items as given below: 1) terminal box nitrile rubber gasket part no. sh/opc/19-1no./s et 2) compression gland complete with cable gland, grommet & washer part no. sh/opc/16-1 no./set 3) o ring between suction flange and shell part no. sh/opc/31-1 no./set 4) o ring between shell & d elivery flange part no. sh/opc/23 -1 no./set [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - gaskets for m/s shil make transformer oil pump
supply of overhauling kit set for lrus of ccb 2.0 system for diesel locomotives . each set consisti ng of 10 overhauling kits 1) over hauling kit for lru control portion bc(bc-cp) kb part no.-789009. 2) overhauling kit for lru ,control portion, 16-pipe (16-cp) kb part no.-787556-2004. 3) overhauling kit f or lru ,control portion,20-pipe (20-cp) kb part no.-787775-2004. 4) overhauling kit for lru ,control p ortion, er(er-cp)kb part no. 788753-2004. 5) overhauling kit for lru ,control portion, bp(bp-cp)kb pa rt no.-787321-2004. 6) overhauling kit for distributor valve .kb part no. ii73835. 7)overhauling kit for lru, controller assembly, cab-1(ebv-a) kb part no.-787452-2004. 8) overhauling kit for lru, controll er assembly, cab-2(ebv-b) kb part no.-787453-2004. 9) overhauling kit for emergency brake valve n b11 .kb part no.-i69411. 10) overhauling kit for 821 vent valve. kb part no.-785260-1000. [ warrant y period: 30 months after the date of delivery ] ] - overhauling kit set for lrus of ccb 2.0 system for diesel locomotives
corrigendum : supply of pedestal jaw liner for casnub bogie as per g-95 (revision 2), fig. no. 31, size 67 x 38 x 5 mm, material: is:3885 part-i, gr. iv (bh 380 - 420). [ warranty period: 48 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - pedestal jaw liner for casnub bogie as per g-95
supply of supply of motorised changing kit for axle box without lifting of 3phase loco(c onsist 04 items & accessories in one set) sps model no. - axle c. k. 121990. as per attached an nexure-a. [ warranty period: 30 months after the date of delivery ] ] - supply of motorised changing kit for axle box without lifting of 3phase loco
supply of set of pneumatic fittings of pneumatic control box 1-v15.12520 for high reach pantograph type wbl85hr as per m/s schunk part no-909010045200,each set consis ts of 16 items in 43 nos. as per annexure attached. makes chunk metal and carbon india pvt. ltd. bangalore [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - set of pneumatic fittings
supply of slack adjuster bottom with mn steel bush irs-r-65 for wag-7 loco specification/drg.:- c lw drg no-06/3/19/99 alt-1 bush material- mn steel to irs-r-65 [ warranty period: 30 months after the date of delivery ] ] trs/ddu, ecr - slack adjuster bottom with mn steel bush irs-r-65 for wag-7 loco specification/drg.:- clw drg no-06/3/19/99 alt-1 bush material- mn steel to irs- r-65
supply of set of bearing cover (ce) consisting of 1 no inner bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.2, and 01 no outer bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.1 and confirming to clw spec. 4tms.095.003 rev-l, alt.3 and rdso str no rdso/2007/el/str/0017, r ev-1 with latest. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - set of bearing cover (ce) consisting of 1 no inner bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.2, and 01 no outer bearing cover (ce) to hitachi drg no. 10q 750 259 alt-i ref.1 and confirming to clw spec. 4tms.095.003 rev- l, alt.3 and rdso str no rdso/2007/el/str/0017, rev-1 with latest.
supply of rubber stopper assembly for pantograph type ir03h of high speed electric locomotive c lw specification no. clw/es/p-5 alt f m/s contransys pt no. coh200 or similar [ warranty period: 3 0 months after the date of delivery ] ] - rubber stopper assembly for pantograph type ir03h of high speed electric locomotive clw specification no. clw/es/p-5 alt f m/s contransys pt no. coh200 or similar
supply of - main spring assly of pantograph ir-03h contransys specification:- tender title contransys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f 2. item details s.no. pl code item stock / ordering consider approving inspection currency estimated (group) type nonstock for eval agency agency allowed rate gst(y/n) 1 25888183 goods (y) stock --- yes clw tpi agency inr description :description :- main spring assly of pantograph ir-03h contransys specification:-contran sys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f [ warranty period: 30 months after t he date of delivery ] ] trs/gmo, ecr - description :- main spring assly of pantograph ir-03h contransys specification:- contransys pt.no.-coh-600 or similar clw specn.no.- clw/es/p-5 alt.f
supply of compartment door for ac coaches consisting 2 items are : [1] compartment door [with grill] for ac sleeper coaches [lh] to rcf's drg. no.cc56408, alt.no.-'f', item no.- 9 (for make and m odel follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item, qty/kit-1 no. [2] compartment door [with grill] for ac sleeper coaches [r.h] to rcf's drg. no.cc56419, alt. no.-'e', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplie d as loose item qty/kit-1 no [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] page 1 of 6 run date/time: 11/09/2026 11:11:16 stores/east central rly tender document tender no: 04250623b closing date/time: 21/09/2026 14:00 - compartment door for ac coaches consisting 2 items are : [1] compartment door [with grill] for ac sleeper coaches [lh] to rcf's drg. no.cc56408, alt.no.- 'f', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item, qty/kit-1 no. [2] compartment door [with grill] for ac sleeper coaches [r.h] to rcf's drg. no.cc56419, alt. no.-'e', item no.- 9 (for make and model follow dy.cme/tot l.no.md46151 dated 10.07.2004)) supplied as loose item qty/kit-1 no
supply of fresh air screen ( stainless steel) as per part no: sr-075-73 of m/s. sidwal oe equ ivalent and confirming to rdso specn. no: rdso/pe/spec/ ac/0061-2005, rev-1 suitable for linke hofmann bosch variant coaches [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - fresh air screen etc.
supply of cross members for lhb coaches as per item no- 1 of drg no- judw/mech/20-721 [ warrant y period: 30 months after the date of delivery ] ] - cross members for lhb coaches