Find the latest stands tenders in east central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of lower side wall part (turn under) to drg. no. crw/sk- 546, alt.1. epoxy coated (dft min.75 micron) as per rdso spec. m&c/pcn/123/2012. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - lower side wall part etc.
View Insights
supply of - chair for general purpose (q2) - | quantity - 25
supply of on load change over switch, 4 pole, 415 v, 50 hz capacity 63 amp.confirming to is: 139 47 part i and iii with s/s enclosure. [ warranty period: 30 months after the date of delivery ] ] - on load change over switch, 4 pole, 415 v, 50 hz capacity 63 amp.confirming to is: 13947 part i and iii with s/s enclosure.