Find the latest subway tenders in east coast railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
construction of lhs in lieu of lc no. 14 (gadh-kdjr), lc no. 08 (gadh-prnr), lc no. 23 (hcnr-nkw) and lc no. cp-1 (ctc-kdrp), provision of lhs at trespassing locations between bgpl-sknd, construction of lhs from r1 to r4 portion at dnkl yard, replacement of overaged battery chargers, chokes and other track circuit equipment, and ei alteration in 02 nos. siemens electronic interlocking installations in khurda road division."
View Insights
execution of ohe modification work in connection with construction of limited height subway (lhs) at rly km. 439/19-21 in lieu of manned level crossing no. jb- 14 at 439/23-25 between ghnh and nqr stations of khurda road division.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 41.50 to km 69.60 (including nunkhari station) involving earthwork in formation, embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), viaducts, tunnels, protection works, blt works, p.way track works with contractor's own materials (except new/sh rails), construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, tunnel ohe with rocs, tunnel lighting, tss, sp, general power supply arrangements modifications/conversion to underground for overhead electrical ht/lt power line crossings etc on epc basis in waltair division of east coast railway.
corrigendum : jeypore-malkangiri new bg railway line: design & construction of new bg railway line from km 69.60 to km 125.18 involving earthwork in formation , embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road under bridge (rubs), road over bridge (rob's), protection works, p.way track works with contractor's own materials(except new/sh rails) construction of platforms, station buildings, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification, provision of 1x25 kv conventional type ohe, provision of 2 nos. tss, 1 no sp, construction of new sub-stations, electrification of station building, circulating areas, fobs, pfs, quarters, goomties, modification/conversion to underground for overhaed electrical ht/lt power line crossings etc. on epc basis in rayagada division of east coast railway.
corrigendum : gunupur-theruvali new bg line project : design and construction of new bg railway line from km 122.750 to km 141.940 (excluding rcc box, rob br. no 388 from km 137.725 to 137.925 but including p way & ohe works) involving 08 nos of tunnels (t-2 to t-9) & from km 110.02 to km 113.12 involving 1 no tunnel(t-1), blt works & its approaches and earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridge, road over bridge (robs), road under bridge (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleeper, special psc sleepers (for turnouts, improvised sejs, guard rails etc), point (thick web switches & wcms crossing, glued joints, h- beam/ composite sleepers over girder bridges, improvised sejs, all p-way fittings, ohe foundations, supply and erection of ohe masts, provision of 1x25 kv conventional type ohe (ohe-22.660tkm) including 2.86 km rocs in tunnel, provision of one feeding post (tss) modifications/conversion to underground for overhead electrical ht/lt power line crossings, construction of platforms, station buildings, fob, service buildings, sp/ssp buildings and residential buildings, water supply, indoor and outdoor electrification works etc in waltair division of east coast railway.
jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor's own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, improvised sejs, guard rails etc), points (thick web switches) & wcms crossings, glued joints, h-beam/composite sleepers over girder bridges, improvised sejs, all p-way fittings, 2x25 kv ac ohe works, 2x25 kv tss with sp/ssp works along with scada, modification/conversion to underground for overhead electrical ht/lt power line crossings, electrical general services, construction of platforms, station buildings, service buildings, sp/ssp buildings, trd depot building with tower wagon shed, residential buildings, water supply, indoor and outdoor electrification etc. on epc basis in rgda division of east coast railway"
corrigendum : execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
proposed underwater repairing and strengthening of bridge foundation, pier and substructure elements based on underwater inspection reports for various bridges over khurda road division.