FILTERS
supply of supply & installation level crossing gate optical device with data and voice fiber modem an d poe adaptor 02 no. as per specification attached [ warranty period: 12 months after the date of deliver y ] ] - level crossing gate optical device (tele)
View Insights
supply of set of piping arrangement for modification of bogie to suit 110 kmph of memu trailer coa ches, detailed description, quantity and specification mentioned in annexure-a, (materials specification as per note of drg.) [ warranty period: 30 months after the date of delivery ] ] - set of piping arrangement for modification of bogie to suit 110 kmph of memu trailer coaches
supply of union g18la3c ( aisi 304 ) ermeto or equivalent as per drg. no mi006025, item no 23 with t ype test certification in accordance to is:10103-1982 with amd-01 to 03. [ warranty period: 30 months a fter the date of delivery ] ] - union g18la3c
supply of axle box end cover machined for vb/ts to medha drg no. c-a675uv2-135337, rev-01. special condition: there will be minor modification in design firm may be advised to collec t final drawing before manufacturing suitable packing to be done to prevent damage d uring transit. [ warranty period: 30 months after the date of delivery ] ] - axle box end cover machined for vb/ts
supply of silent block for anchor link (type-a)to rdso's sk - 94101, item no.1,2 and 3, al t no - 2(two) , and rdso's specn.no. c-9406(rev-ll ) with 2 amendments - last. amendment s lip no - 2 of august.2016. [ warranty period: 30 months after the date of delivery ] ] - silent block for anchor link
supply of knuckle for aar h type cbc coupler as per m/s frontier, drawing no fasl/tlc/k/0506 a nd conforming to rdso specification no rdso/2011/cg-03 (rev -3) of april 2019 with amendment sli p no. 1 of july 2024 [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - knuckle of cbc for lhb coaches
supply of step assembly for wag-9hc loco as per clws drg. no.- 1209-06-242-008 (alt.-3) [ warrant y period: 30 months after the date of delivery ] ] - procurement of step assembly
supply of air spring bellow assly. complete with 4-hole base plate for air suspension system of em u coaches (180 kn) . drawing no: -------------- matl.& specn : rdso specn. no. rdso/cg/s/23002, rev. 0 1 / july 2025. [ warranty period: 72 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] workshop carriage stores/kgp, - air spring bellow assly. complete with 4-hole base plate for air suspension system of emu coaches (180 kn) .
supply of supply, installation and commissioning of pressurized flushing system in each toilets all lhb coaches as per specification mmdts - 19027 rev.3 ( 1 set quantity refers to pressurized flushing system f or 1 toilet) [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - supply, installation and commissioning of pressurized flushing system for all lhb coaches