Find the latest pantograph tenders in eastern railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
reconditioning of wheel-burnt/scabbed rails/cupped welds by using rdso approved technology such as micro flow metal spray powder technique or robotic welding technology under the jurisdiction of sr. den (west)/ckp (2nd call).
View Insights
howrah division-signalling work in connection with-schedule a1-signalling cost for construction of lhs at gate no. 40 at km. no. 88/26-28 between station rslr- plae under jurisdiction of aen/bdc.schedule a2-telecommunication cost for construction of lhs at gate no. 40 at km. no. 88/26-28 between station rslr- plae under jurisdiction of aen/bdc.
through ballast renewal works of points and crossings between barabamboo to bondamunda a cabin under the jurisdiction of den/central/ckp (2nd call)
(a) s&t estimate in connection with provision of 1st fob at rishikund & sarobag station. (b) s&t estimate in connection with provisioning of existing stair case with 2 nos of lift at pf no- 1 and pf no-2 &3 at same fob at bgp stn (c) upgradation of tkle,dwle,bhle & brps station and other passenger amenities in bgp-dumk section under aen/bgp, (d) improvement of pf surface, water booth, station buildings including improvement of water supply and drainage facilities at gzm, jmq, ktj cmx, (e) improvement of pf surface, water booth station, buildings including water supply & drainage facilities at noapara mple, mplr, prdg, bhw, tph, (f) provision of cctv camera for officers railway colony of malda
s&t work in connection with construction of a loop line for 3rd line and one sick siding of length 70 m. at talaburu.
electrical work connection to (i) provision of interlocking of level crossing gates having more than 20000 tvu under jurisdiction of srdste-i/bsb with tru & power supply arrangement (total 4 no lc) 2. additional work of bcy station under abss 3. bsbs- provision of dormitory for dog kennel staff over new dog kennel building.4. construction of new 20 beded rpf barrack for ladies & sub ordinate rest house at banaras. 5. construction of new 20 bedded rpf barrack at varanasi of n.e. railway 6. at bsb- electrical work connection to provision of 26 bedded sub-ordinate rest house 7. construction of new hostel for multi-disciplinary divisional training institute at varanasi(mddti)(phase-i)
balance work of ballast dressing, cess cleaning and other miscellaneous work for upkeep and tidiness of railway track under aden/cbsa in the jurisdiction of sr. den(south)/ckp.
dankuni (dkae) traffic facility work under aen/dkae under the jurisdiction of sr.den/2/hwh. (p.way portion)
conversion of bg coaches into art/arme, qty-08 coaches
s&t work for the construction of ramps for (fobs) at ci, dwdi, dhe, gopg, mhc, yfp, dda, cc, & em stations of the varanasi division & s&t work for the construction of the new bangra halt (including station building, platform, other amenities) between raja patti - masrakh stations.
provision of one full length stabling line at nautanwa station and brakevan reversal siding at subhagpur station.
design, drawing, supply, erection, testing and commissioning of 25 kv ohe, psi and allied electrical works in connection with (i) at dh: provision of additional stabling line (csr length 275 mtr.) beside the platform no. 3; (ii) proposal for automatic signaling system between brp to dh section.
ttr-22 sets-at locations dhae- up -56a,55b,52b, 51a,dhae-dn- 56b, 54b, 53b, 51b, kwae-up- 50b, 52a, 54b,72b, 73a, 75a, kwae-dn-50a, 51b, 52b, 71b, 72a,75b, kwae-sl- 74a,73b. tbr work from bdc - kwae dn- 86.792 - 87.108 = 0.316 km, 87.476 - 87.575 = 0.099 km; up 0 - 0.92 = 0.92 km, 0.968 - 1 = 0.032 km, 34.77 - 34.82 = 0.05 km, 35.53 - 35.6 = 0.07 km, 50.34 - 51.146 = 0.806 km, 51.162 - 51.266 = 0.104 km, 51.369 - 51.580 = 0.211 km, 54.714 - 54.835 = 0.121 km, 57.9 - 58.145 = 0.245 km, 59.795 - 59.96 = 0.165 km, 62.535 - 62.625 = 0.09 km, 64.704 - 64.928 = 0.224 km, 64.96 - 65.7 = 0.740 km, 66.036 - 66.334 = 0.298 km, 66.397 - 69.44 = 3.043 km, 69.795 - 69.905 = 0.11 km, 70.43 - 70.83 = 0.4 km, 72.09 - 72.15 = 0.06 km, 72.29 - 72.34 = 0.05 km, 75.825 - 76.1 = 0.275 km, 78.881 - 79.25 = 0.369 km, 80.27 - 80.36 = 0.09 km, 81.76 - 82.08 = 0.32 km, 86.48 - 87.51 = 1.03 km under jurisdiction of sr.den/3/hwh
s&t work for construction of bridges and other associated works for drainage improvement of tata east yard.
refurbishment of nei make uic 130 bearing used in lhb coaches (as per scope of work) for 01 year through oem.
overhauling of transmission model t211r.3, make-voith of hs-spart by oem or authorised dealer of oem.
tender schedule for laying of rail track connectivity to the lhb ph-i & ii under jurisdiction of dy.ce / con-ii / kgp , s. e. railway.
stripping, cleaning, repairing, testing & refitting of different types of tanks (overhead, auxiliary & underslung tanks) in lhb coaches at carriage complex, kanchrapara for a period of 03 (three) years
electrical work in connection with provision of first foot over bridge with cover shed at 5 station of n.e.railaway ljn div, provision of essential items for goods shed like tarpaulin , major improvement work like extension of pf no. 02 & water supply pipeline & sanitation and provision of rcc oht, extension of 09 nos. passenger platform at 08 nos. at different stn. at ljn-div, upgradation of infrastructure facilities of new coaching depot at gkp, interlocking of 06 no. lc gates tvu greater than 20000 over ljn div, renovation of cms hall, waiting room for ladies and gents etc. at crew lobby mln.
s&t work in connection with (i)construction of new bridge in lieu of existing bridge no.36 between haludpukur-bahalda road and (ii)regirdering of 03 nos. bridges between aunlajori-badampahar and rajkharsawan-bondamunda.