Find the latest nuts tenders in madhyanchal vidyut vitran nigam limited for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of - three phase distribution box clamps , bracket clamps for 3 ph meter box , holding clamps for top channel, tpmo and fuse set etc with bolts and nuts , lt clamps with nuts and bolts of pcc pole with neutral , earth wire clamps with bolts and clamps , al pg clamps weasel to weasel , al pg clamps rabbit to rabbit , al pg clamps dog to dog , clamps for t- off with bolts and nuts , suspension clamp , dead-end clamp , eye-hook , j-hook , copper l-piece 50x225x10 mm , copper l-piece 62x225x12 mm , f-bracket for 11 kv line , f-bracket for 33 kv line , stay clamp , stay insulator , lt shackle insulator 100x115 mm , bolts and nuts for shackle insulator , al long leg barrel, off-size , danger board with clamps , number plate with clamps , aluminium binding wire 6 swg , jointing sleeves for acsr weasel , jointing sleeves for acsr rabbit , jointing sleeves for acsr dog , barbed wire gi , nuts, bolts and washers of all sizes - | quantity - 4649
View Insights
carriage of pcc/stp pole and line material from esc, lakhimpur to work site (aprox distance 0 to 55 km), carriage damage line material/scrap material site to store center lakhimpur (aprox distance 0 to 55 km)., carriage of other line material such as conductor x-arm, pin insulator, disc insulator, guarding angle etc., dragging of st/pcc pole to pit site, digging and erection (as per respo norms) of 11 kv 9/11/8.5 mtr long st/pcc pole with fixing of necessary items, such as v-type x-arm, f-bracket, 11 kv pin/disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per resspo specification., fixing and errection of double pole on 11 mtr. long st pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per resspo specification and direction of e/i., streightning of tilted stp poles 11 mtr. long by digging of pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., streightning of tilted pcc poles 8.5 mtr. long by digging of pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., grouting of pcc and st pole with civil material (cement: coarse sand:stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. above ground level (as per respo norms). only pole shall be supplied by the department., regrouting of damage stay (for stp pole), regrouting of damage stay (for pcc pole), resagging of loose conductor of 33 kv line including opening of binding & rebinding after sagging of conductor., resagging of loose conductor on 11 kv line including opening of binding & rebinding after sagging of conductor., streightning of tilled cross arm of 33 kv line including proper tighting of clamp and fitting of pin insulators., streightning of tilled cross arm of 11 kv line including proper tighting of clamp and fitting of pin insulators., cutting of tree branches near 33 kv line to avoid tripping., cutting of tree branches near 11 kv line to avoid tripping., repair/replacement of burned jumper on sectional poles., repair of damaged guarding of 33 kv line., repair of damaged guarding of 11 kv line. - | quantity - 858
carriage of pcc/stp pole and line material from esc, lakhimpur to work site (aprox distance 0 to 55 km), carriage damage line material/scrap material site to store center lakhimpur (aprox distance 0 to 55 km)., carriage of other line material such as conductor x-arm, pin insulator, disc insulator, guarding angle etc., dragging of st/pcc pole to pit site, digging and erection (as per respo norms) of 11 kv 9/11/8.5 mtr long st/pcc pole with fixing of necessary items, such as v-type x-arm, f-bracket, 11 kv pin/disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per resspo specification., fixing and errection of double pole on 11 mtr. long st pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per resspo specification and direction of e/i., streightning of tilted stp poles 11 mtr. long by digging of pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., streightning of tilted pcc poles 8.5 mtr. long by digging of pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., grouting of pcc and st pole with civil material (cement: coarse sand:stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. above ground level (as per respo norms). only pole shall be supplied by the department., regrouting of damage stay (for stp pole), regrouting of damage stay (for pcc pole), resagging of loose conductor of 33 kv line including opening of binding & rebinding after sagging of conductor., resagging of loose conductor on 11 kv line including opening of binding & rebinding after sagging of conductor., streightning of tilled cross arm of 33 kv line including proper tighting of clamp and fitting of pin insulators., streightning of tilled cross arm of 11 kv line including proper tighting of clamp and fitting of pin insulators., cutting of tree branches near 33 kv line to avoid tripping., cutting of tree branches near 11 kv line to avoid tripping., repair/replacement of burned jumper on sectional poles., repair of damaged guarding of 33 kv line., repair of damaged guarding of 11 kv line. quantity - 858
corrigendum : supply of - pcc st pole 8.5 9 11 mtr long , 11 kv polymeric pin insulator with gi pins , acsr rabit dog racoon weasel conductor , 11 kv stay set , earth rod , line material v type x arm f clamp etc , grouting and nuzzling of stay set complete including fixing of necessary items , dragging of st pcc pole to pit site digging of pit erection and grouting as per resspo specification , holding clamp with bolt and nuts for pcc pole , stay clamp , stay insulator - | quantity - 2545