FILTERS
performance based maintenance contract (5 years) from km 71/500 to 90/200, 100/200 to 112/500 and 119/400 to 125/150 of nh-167 (adoni-madhavaram section) (36.75km) in (rnb) nh aprdc division, kurnool in the state of andhra pradesh for 2026-27
View Insights
corrigendum : one time improvement of existing left over (bypassed) road stretches from km 354.531 to km 358.842 of kurnool - chittoor - ranipeta road of nh-40 (chittoor town limits) in state of andhra pradesh on epc mode under annual plan 2026-27
corrigendum : widening and stregthening of ambatalat bhavada bopi hanumatmad road ch. 0/00 to 17/600 ta.dharampur dist. valsad
corrigendum : risk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
improvement of existing bypassed section of nh 731a from km 52.200 to 54.370,57.314 to 57.746, 60.670 to 61.460,65.06 to 68.58, 83.530 to 87.110 and 89.130 to 92.140 (kaushambi to chitrakoot section) in total 13.502 km length under oti on epc mode
one time improvement (oti) of nh-29e from km. 81.420 to km. 98.935 (length 17.515 km.) under epc mode in the state of uttar pradesh.
construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode - construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
corrigendum : construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
permanent restoration of nh144a, section from existing chainage km 30.053 to km 229.730 (design chainage km 30.000 to km 198.180, length- 168.180 kms), (akhnoor poonch road) under project sampark, bro in the ut of jk on epc mode
corrigendum : c.r.i.f. -2025-26 widening and resurfacing of sutharpada aslona road road ch. 0/0 to 12/400 (mdr) dist. valsad
strengthing work from ch. 240-200 to ch. 245-400 of nh-120 dumraon bazar for the f.y 2026-27 in the state of bihar.
corrigendum : rehabilitation and upgradation of two lane road with paved shoulders on malegaon missing link section of nh461b from akola naka to junction with nh 161 at malegaon bypass (from km 0.00 to 3.00 total length 3.00 km) and 0.00 to 0.460 length of nh753c
corrigendum : strengthening from km 00.00 to km 06.00 of the yeola town to andersul section of nh752h in the state of maharashtra on epc mode.
crif 2025-26 - resurfacing of vyara kherwada road, km. 0/0 to 17/69 (mdr), ta. vyara, district. tapi (crif 2025-26)
strengthening at km 9/2 - 12/8, 16/0 - 18/0 and 27/0 - 30/2 of devipattinam - nainarkoil road (via) pottagavayal road including reconstruction of culvert at km 11/6 and construction of retaining wall at km 11/8.(m-93) - strengthening at km 9/2 - 12/8, 16/0 - 18/0 and 27/0 - 30/2 of devipattinam - nainarkoil road (via) pottagavayal road including reconstruction of culvert at km 11/6 and construction of retaining wall at km 11/8.(m-93)
corrigendum : short term improvement and routine maintenance work road pavement repairs work on section dhasa-gadhada-botad road (between km. 74/00 to 119/500) of nh-51 in the state of gujarat.
corrigendum : construction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra
crif 2025-26 - resurfacing of songadh waghnera road, km. 0/0 to 16/880 (mdr), ta. vyara, district. tapi (crif 2025-26)
corrigendum : strengthening of nh - 543k bapera-tumsar-mohadi-bhandara - strengthening of nh - 543k mp and mh border-bapera-tumsar-mohadi-bhandara in section km. 73.00 khairlanji to km. 82.00 khapa actual length 6.3 km in bhandara district in the state of maharashtra
rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
special repair from km 51.000 to km 56.000 of nh 522under nh division, hazaribagh for the year 2026-27
special repair from km 48.00 to km 51.00 and km 56.00 to km 62.650 of nh - 522 under nh division, hazaribagh for the year 2026-27.
work of short term road and structures maintenance works and activities on section 66/03 km to 122/20 km total 56.17 km kapadvanj bayad dhansura modasa.
corrigendum : special repairs at parshuram ghat from km 202.00 to 205.00 and km 149.510 to 150.00 of nh-66 in the state of maharashtra during 2026-27
corrigendum : special repairs at konzar ghat km 16.000 to km 25.609 of mahad to raigad fort section of nh-166f in the state of maharashtra during 2026-27
corrigendum : special repairs at nadgaon hill side portion from km 128.900 to 129.500 and km 121.00 to 121.400 of nh-66 in the state of maharashtra during 2026-27
corrigendum : special repairs from km 0.000 to 55.100 of mangaon-dighi port section of nh-753f at in the state of maharashtra during 2026-27
short term maintenance contract (stmc) estimate from km 35.000 to 38.000, 45.000 to 50.000, 60.000 to 65.000 km. and km. 70.000 to 102.900 km. of nh-326(a) in the state of odisha under annual plan 2026-27.
corrigendum : short term maintenance of mp/up border-chitrangi section of nh-135c from km 0.00 to km 54.00 (total length 54.00 km) in the state of madhya pradesh
corrigendum : short term maintenance of nh-351g km. 0/00 to 62/200 nageshree-khambha-chalala road in the state of gujarat.
corrigendum : special repairs at km.48/047 ( mnb kalamb and ex..bridge ), km 49/770 (kalamb bridge), km.57/870 (sugave bridge) and km.65/498 (vanjarwadi bridge) of patgaon-khopoli nh-548a in the state of maharashtra during 2026-27
corrigendum : road safety measures by providing service roads between km.161.600 to 205.400 kashedi to parshuram of nh-66 in the state of maharashtra during 2026-27
corrigendum : road safety measures at km 60/160 to km 60/960 ,km 60/960 to km 61/160, km 61/160 to km 62/190 ,km 68/000 to km 69/200,km 72/200 to km 75/000, length-6030 m of patgaon-khopoli nh-548a in the state of maharashtra during 2026-27
corrigendum : road safety measures from km 84.000 to km 110.750 indapur to wadpale of nh-66 in the state of maharashtra during 2026-27
special repairs at km.75/984 (shriram bridge), km 77/400 (karjat rob),mnb at km. 3/656 ,km.4/057 and km.5/292 and culverts of patgaon-khopoli- wakan nh-548a in the state of maharashtra during 2026-27
crif 2025-26 - strengthening of bajipura kahar balda kalamkui road k.m. 0/000 to 11/000 (mdr) dist. tapi(crif 2025-26)
crif 2025-26 - resurfacing of raniamba rupwada sandhkuva road, km. 0/0 to 11/700 (mdr), ta. songadh, district. tapi (crif 2025-26)
short term maintenance of hyderabad srisailam road at stretches from km 128.600 to km 142.000 km 146.000 to km 148.000 km 149.000 to km 156.000 km 166.000 to km 167.000 km 171.000 to km 173.000 km 174.000 to km 184.000 km 185.500 to km 185.700
one time improvement work from km. 46.420 to km. 50.580 of basrehar market and bharthana chauraha to over bridge on nh-92 beber-etawah road in the state of uttar pradesh.
corrigendum : short term maintenance mandla nainpur from km 0 to km 25 and km 75/6 to 95 km (total length-45.6km) of nh-543 in the state of madhya pradesh
corrigendum : short term improvement and routine maintenance of km. 78/700 to 116/600 (for amreli-babra section) of nh-351g in the state of gujarat.
periodic renewals of armoor-jagtial-mancherial section of nh-63 from km 28/000 to 31/000 km 37/000 to 38/000 km 41/000 to 42/000 km 45/000 to 47/000 and 51/300 to 55/400
work of short term road and structures maintenance works and activities on ferkuva chhotaudepur bodeli road nh 56 km 356/905 to 377/305,km 388/000 to 405/305 and km 405/305 to 407/105 in the state of gujarat.
corrigendum : stmc work from km 4 th (ramnagar) to km 28 th ( bahedi bazar ) of nh 527e under nh division samastipur for the year 2026-27 in the state of bihar.
special repair of nh 503a punjab border bankhandi una lathaiani salouni bhota at various locations from km 000 to 70000 sh construction of retaining wall breast wall wing wall rcc box culverts rcc cantilever walls covered u shape drain and patch work
work of short term road and maint works and on sec 1) 2) 3) 4) aslali-matar section 5) boriavi-lambhvel- anand city section 6) anand-jitodiya-napa section under nh64 total length 39.45 km of nh-64 in the sog
corrigendum : risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
short term maintenance of jalandhar hoshiarpur road from km 11.400 to km 29.200 section of nh 03 in the state of punjab