Discover latest ministry of tenders in 2026. Explore active bids, procurement notices, tender details, deadlines and new opportunities.
FILTERS
corrigendum : design, manufacture, supply, testing & commissioning of track relaying train (trt) along with training of indian railway personnel, operation & comprehensive maintenance during warranty period of 24 months and post-warranty operation & maintenance for 60 months.
View Insights
corrigendum : design, manufacture, supply, testing & commissioning of 27 nos. of high output tamping cum stabilizing machine (hot&s-3x) along with training of indian railway personnel and 3 years post warranty amc
corrigendum : upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
corrigendum : rehabilit shoulders from km 178.500 tation and up-gradation of nehru nagar to kothagudem section to two lane/four lane with pavedo km 230.580 of nh-930p in the state of telangana on epc basis
upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
corrigendum : rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
corrigendum : construction of uni-directional twin tunnels including approach roads across fotu la pass on nh-01 (leh-kargil highway) in the union territory of ladakh
corrigendum : construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
corrigendum : construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
corrigendum : upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
corrigendum : construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
corrigendum : widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
corrigendum : design, manufacture, supply, testing & commissioning of 24 nos. of of points & crossings changing machine (pccm) along with training of indian railway personnel and 3 years post warranty amc
corrigendum : upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
corrigendum : upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
corrigendum : upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
corrigendum : upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
corrigendum : widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
corrigendum : consultancy services for ae for supervision of construction of a sixlane external port connectivity road from the junction of nh65 and nh216 to machilipatnam port via machilipatnam bypass section of nh216 in the state of andhra pradesh
corrigendum : widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
maintenance dredging of approach channel, entrance channel, turning circles and docks of paradip port authority for the period of 03(three) years - maintenance dredging of approach channel, entrance channel, turning circles and docks of paradip port authority for the period of 03(three) years i.e for the years 2027-28 to 2029-30
corrigendum : construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
corrigendum : widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
corrigendum : upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
corrigendum : construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
corrigendum : mrvc/w/401 - provision of infrastructure development works (earthwork in embankment, bridge extension, retaining wall cum boundary wall, road works, etc.) in connection with development of land for proposed poh cum new emu maintenance depot at vangaon
corrigendum : construction of 6 no. of mangobandhar, kendua,tolesono,jhajha, narganjo and bhairoganj bypasses (total length 19.450 km) along with 2 no. of dlp free sections (total length 21.821 km) to 2l plus ps standard of nh-333a in the state of bihar.
corrigendum : rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
procurement of solid forged wheels (rough turned) for fiat ir bogies (lhb) to drawing no. mi006615 alt.-b with specification no. irs r-19/93 part-ii (rev.6) and rdso sketch-92114 alt.11
corrigendum : upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
corrigendum : rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
corrigendum : rehabilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharashtra on epc mode. length 32.47 km tpc
corrigendum : construction of maski bypass starts at existing km 144.220 and ends at existing km 151.760 and sindhanur bypass starts at existing km 168.370 and ends at existing km 180.800 on nh 150a in the state of karnataka
corrigendum : widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
corrigendum : construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
development of a solar power plant at takipura grass bir tehsil depalpur distt. indore, mp which shall be capable of producing 62 mw (approx) of solar energy, through a design, build, finance, operate, maintain and transfer (dbfomt) model (project).
corrigendum : widening re-construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
corrigendum : widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
development of a solar power plant at barodapanth grass bir tehsil depalpur distt. indore, mp which shall be capable of producing 55 mw (approx) of solar energy, through a design, build, finance, operate, maintain and transfer (dbfomt) - development of a solar power plant at barodapanth grass bir tehsil depalpur distt. indore, mp which shall be capable of producing 55 mw (approx) of solar energy, through a design, build, finance, operate, maintain and transfer (dbfomt)
corrigendum : treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
corrigendum : widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (koksara) to km 294.280 (nabarangpur) on nh-26 in kalahandi and nabarangpur districts in the state of odisha under the epc mode(07 ce nh of 2025-26)
corrigendum : treatment of 16 no of landslide location on nh-134 under epc mode in the state of uttarakhand under annual plan 2025-26
development of a solar power plant at chiklonda grass bir tehsil depalpur distt. indore, mp which shall be capable of producing 37 mw (approx) of solar energy, through a design, build, finance, operate, maintain and transfer (dbfomt) model (project)
corrigendum : construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
construction of 5 nos. of elephant underpasses (eup) in compliance to condition of forest department in forest clearance of ambikapur to ramanujganj section of nh-343 in the state of chhattisgarh under nh(o).
corrigendum : hiring of 01 (one) no. 70ton bollard pull astds tug for handing fully loaded cape vessel and spm operation for a period of 07 (seven) years at paradip port authority.
corrigendum : rehabilitation upgradation of four lane road with paved shoulders in hingoli town section of nh 461b from narsi phata to junction with nh 161 at sawarkheda with major bridge across kayadhu river and additional 2 lane rob at lc no.144(b) (from km. 94.
mrvc/w/mutp3a/kyn-bud/260 - balance work in connection with proposed 3rd and 4th lines between kalyan and badlapur stations of central railway
improvement/strengthening of the existing road from km 86.120 to km 94.540 heena-tekhla widening to 2-lane standard from km 94.540 to km 95.287, construction of a 100m pmt bridge at km 93.425and treatment of two landslide locations at netala and - widening to 2-lane standard from km 94.540 to km 95.287, construction of a 100m pmt bridge at km 93.425, and treatment of two landslide locations at netala and garampani on the gangotri-dharasu road nh-34 in the state of uttarakhand on epc mode