FILTERS
kmc/ltg/21/wd38/iv/zii/26-27 - repairing and replacement of lighting system at heramba das lane uttaran and other uttarans in wd-38 under br-iv, kmc.
View Insights
corrigendum : kmc/ltg/16/wd21/iv/zii/26-27 - repairing and replacement of lighting system at darpanarayan uttaran and other uttaran in ward 21 under br-iv,kmc.
corrigendum : kmc/ltg/18/wd22/iv/zii/26-27 - repairing replacement of uttaran lighting system in uttaran areas under wd-22, br-iv,kmc.
corrigendum : kmc/ltg/22/wd26/iv/zii/26-27 - repairing and replacement of lighting system at 6, dinanath mitra lane uttarans and other uttarans in wd -26 under br-iv, kmc
kmc/ltg/z-iii/viii/26-27/18 - repairing of lighting system at tollygunge uttaran and other uttaran areas in wd -88.
ltg/26/62/vi/z-ii/26-27 - repairing and replacement of uttaran lighting system at different uttaran areas in ward no 62
ltg/53/wd-15/br-ii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-15 under br-ii.
kmc/ltg/z-iii/viii/26-27/45 - supply and delivery of led light fitting for c. r. das park and mysore garden in wd no-88.
kmc/ltg/z-iii/ix/26-27/40 - supply and delivery of street lighting system at different roads and places in ward no-74 under br-ix.
kmc/ltg/z-iv/br-x/10/26-27 - repairing of street lighting arrangement at chetla road, sahapur colony, p block (new alipore) areas in ward no-81, br-x
ltg/54/wd-16/br-ii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-16 under br-ii.
ltg/65/wd-18/br-ii/z-i/26-27 - improvement of illumination by installing led light fittings and allied electrical works at nilmony mitra uttaran and otheer uttaran in ward no-18 under br-ii
ltg/94/wd-35/br-iii/z-i/26-27 - improvement of illumination by installing led light fittings and allied electrical works at different uttarans in ward no-35 under br-iii.
corrigendum : kmc/ltg/23/wd24/iv/zii/26-27 - repairing and replacement of lighting system at pathuriaghata uttarans and other uttarans in wd -24 under br-iv, kmc
ltg/55/wd-17/br-ii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-17 under br-ii.
kmc/ltg/z-iii/viii/2026-27/46 - supply and delivery of led lights fittings at keyatala road and surrounding areas in ward no.-86 under br.-viii.
kmc/ltgv/118/26-27/lr2 - repairing and renovation of existing street lighting system at sn roy rd,rajani mukherjee rd,3 no chatterjee colony and sorrounding areas in ward no-118,kmc.
ltg/66/wd-19/br-ii/z-i/26-27 - improvement of illumination by installing led light fittings and allied electrical works at nather bagan uttaran and otheer uttaran in ward no-19 under br-ii
ltg/81/wd-13/br-iii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-13 under br-iii.
ltg/85/wd-33/br-iii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-33 under br-iii.
corrigendum : ltg/67/wd-20/br-ii/z-i/26-27 - improvement of illumination by installing led light fittings and allied electrical works at nimu goswami uttaran and otheer uttaran in ward no-20 under br-ii
ltg/100/br-iii/z-i/26-27 - temporary lighting arrangement for chatt puja-2026 at different pond site ghats in ward no-31 and 33 under br-iii
ltg/82/wd-14/br-iii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-14 under br-iii.
ltg/83/wd-31/br-iii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-31 under br-iii.
kmc/ltg/z-iii/ix/26-27/49 - urgent restoration of street light poles at judges court road, alipore road, debendra lal khan road and surrounding areas damaged due to storm on 23/06/2026 in ward no-74 under br-ix.
ltg/84/wd-32/br-iii/z-i/26-27 - improvement of illumination by installation led light fittings and allied electrical works at diffrent uttaran in ward no-32 under br-iii.
supply, installation, and commissioning (sitc) of led floodlight fittings at the ganesh visarjan mahaghat in parsik nagar, under the kalwa ward committee.
erection of street light poles near exotica at yeoor under vartaknagar ward committee.(marathi document)
supply installation testing commissioning of highmast at netaji subhashchandra bose chawk under vartaknagar ward committee- making m-20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 t/sq.m, providing & erecting foundation bolts m25 x 750 manufactured from mild steel (set of 4 bolts with 2 nuts and 2 washers per bolt) for 9m and 10m high octagonal pole having bottom of 130 mm a/f, top 70 mm a/f, providing pipe type earthing with 40mm. dia. g.l. pipe or 20 mmdia. g.l. rod complete with all materials, sitc of led flood light luminary 200 watt. , supplying & erecting mains with 3x2.5 sq.mm f.r stranded/solid copper pvc insulated wire laid in provided conduit/ trunking/inside pole/bus bars, supplying, erecting & terminating fr xlpe insulated, galvanised steel formed wire armoured (strip) cable, 1100 v 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs on wall/ trusses/pole or laid in provided trench/ pipe, supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (dwc) of hdpe for enclosing cable, providing m20 concrete for resurfacing the road, supplying, erecting & marking spmcb 0.5a to 5a, c-series with rated short - circuit breaking capacity (icn) 10ka in provided distribution board as per specification no. sw-mcb, providing pu paint to octagonal poles, supplying and erecting iron work, sheet metal work consisting of ms sheets, various sections of iron, plates, chequered plates, rods, bars, ms pipes, etc. for panel board or any other purpose with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears.
kmc/ltg/z-iv/165/26-27/pd - repairing of high mast and other electrical accesories at pirpukur in ward no- 113-br-xi
ltg/101/br-iii/z-i/26-27 - temporary lighting arrangement for chatt puja-2026 at different pond site ghats in ward no-13 and 14 under br-iii
ltg/82/wd-17/br-ii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no -17 under br ii
ltg/102/br-iii/z-i/26-27 - temporary lighting arrangement for chhath puja-2026 at different pond site ghats in wd no-34 and 35 under br-iii.
ltg/73/wd-13/br-iii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no 13 under br iii
ltg/80/wd-15/br-ii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no -15 under br ii
ltg/77/wd-33/br-iii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no 33 under br iii
ltg/74/wd-14/br-iii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no 14 under br iii
ltg/76/wd-32/br-iii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no 32 under br iii
to provide new street lighting through tangedco at maligai kudiyiruppu, kamaraj nagar, om sri sai vidukal base 7, ward no. 100.
ltg/75/wd-31/br-iii/z-i/26-27 - repairing with electrical safety arrangements of street lighting system for different uttaran in ward no 31 under br iii
ltg/76/wd-19/br-ii/z-i/26-27 - repairing and replaement of street lighting arrangements at sasi sur uttaran and other uttaran in ward no-19 under br-ii
ltg/86/wd-35/br-iii/z-i/26-27 - reparing with elecrical safey arrangements of stret lighting system for different uttarans in ward no-35 under br iii, kmc
providing of temporary lighting at providing of temporary lighting at dargah hzt. shah mohammed hasan sahab qibla (ra), in view of urs-e-shareef for four days at aghapura, mallepally in mehdipatnam circle-33 of golconda zone, ghmc
corrigendum : annual rate fixing for temporary lighting arrangements including halogen, led, and other decorative lights (annual rate fixing 2026-2027 2027-28)
corrigendum : supply of - led garden light (v2) (q2) , led luminaire for road and street lights conforming to is 10322 (part 5section 3) (v3) (under bis scheme - ii) (q2) , led luminaire for floodlight conforming to is 10322 (part 5section 5) (v3) (under bis scheme - ii) (q2) - | quantity - 186
purchase of 18 watt and 36 watt led street lights and related items in maliya miyana municipality. dist.morbi- second attempt
supply and fixing of 40w led lamp fittings in 6-meter gi pipe with other electrical accessories at alam street area in ward no. 50.
supply and fixing of 40w led lamp fittings in 6 metre gi pipe with other electrical accessories at kajapettai slum area in ward no 50
indore municipal corporation invites online tender for the supply, installation, and commissioning of lightning protection works at various gardens under zone 08, ward 37.
agency empanelment for temporary lighting arrangements on various occasions and festivals in dewas