FILTERS
construction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
View Insights
corrigendum : balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh - balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
corrigendum : strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba
development of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road (sprr) in ahmedabad, gujarat
rectification of 05 nos. morth-identified black spots on nh-130, including 02 nos. on bilaspur to pathrapali section from km 0.000 to km 53.300 and 03 nos. on simga to bilaspur section from km 48.580 to km 91.026
corrigendum : const. of grade separators at rabarika chowkdi kutiyana bypass near vill. mal choliyana n vup near kutiyana vill along with standalone service road 2.20 km on porbanadar jetpur sec of nh27 in gujarat
construction of a two-lane secondary service road along uer-ii within the available row in the state of delhi on epc mode.
corrigendum : rectification of curves in the existing emergency landing facility including construction of perimeter roads on both sides of the elf and atc plinth (50m 50m) on chilakaluripeta nellore sec from km 1274.000 to km 1277.600 of nh 16 in ap on epc
permanent rectification of 4 nos. of blackspots in trichy - dindigul section of nh-83 in the state of tamil nadu under epc mode - permanent rectification of 4 nos. of blackspots in trichy - dindigul section of nh-83 in the state of tamil nadu under epc mode
corrigendum : 4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
repair and rehabilitation work of berhampore bypass from km 191.700 to km 202.500 on berhampore - farakka section of nh-12 at the risk and cost of the bot concessionaire
corrigendum : widening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
construction of 6 lane lvup & svup in village sahuwala (km. 271+890 & 272+093); lvup & svup in village odhan (km. 285+513 & 285+765); lvup in village chormar khera (km. 292+030); and lvup in village sawant khera (km. 306+317) with slip/service roads on both sides on hisar to dabwali section of nh-9 (old nh-10) in the state of haryana on epc mode.
construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
corrigendum : strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis
corrigendum : strengthening and overlay at various stretches of 4 lane bamanbore to garamore section (km 182.600 to km 254.537) of nh-27 in the state of gujarat under tot project at the risk and cost of existing concessionaire
widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
corrigendum : construction of perimeter roads on both sides of emergency landing facilities (elf) including atc plinth (50m x 50m) on chilakaluripeta nellore section of nh16 from km. 1210.000 to km. 1214.600 in andhra pradesh on epc mode
corrigendum : develop.of 6l uer2 nh 344 m nh1 km0.700 to dwarka sec24 road km38.111 in delhi n 4l rs nh344 n nh344 m delhi at km26.135 of nh344 m uerii till bhd byp of nh10 near bhd in hr pkgi 2 3 nh344m n 5 nh344n 2 call works at rnc of epc contractor.
corrigendum : strengthening of pavement including improvement of road safety costruction of retaining wall breast wall and thrie beams crash barriers etc in km 156507 to 208705 on nh 05 in the state of himachal pradesh on epc mode
corrigendum : overlay with sma from village bhamaiya ch.780.920 to village baletia 803.420 (design ch. 328.500 to ch. 351.000) section of dve (nh-148n) in the state of gujarat (package-29) at risk and cost of contractor on single percentage item rate basis
corrigendum : strengthening and overlay at various stretches of 4 lane garamore to samakhiyali section (km 254.537 to km 306.000) of nh-27 in the state of gujarat under tot project at the risk and cost of existing concessionaire
corrigendum : overlay with sma from baletia of panchmahal ch. 803.420 to village pratap nagar of vadodara 824.920 (design ch. 351.000 to ch. 372.500) section of dve (nh-148n) in the state of gujarat (package-30) at risk and cost of contractor on single percentage
overlay with sma from jn. with sh-63 nr vill pratap nagar km 824.920 to jn with ne1 nr dodaka vill of vadodara km 844.382 (des. ch 372.500 to ch 391.962) sectn of dve nh-148n in gujarat pkg31 at risk and cost of contractor on single percent item rate
corrigendum : short term repair and routine maintenance of 4 lane sindoor river to start of bareli bypass km 130.00 to 193.450 nh12 four lane with ps pkg3 in the state of mp on item rate mode
corrigendum : construction of balance work of wsa at ch 381.850 on both sides lhs and rhs of 8 lane carriageway of dve nh 148n from junction with sh 37a to junction with nh 76 ch 359.170 to ch 388.420 package 13 on risk and cost of contractor on item rate basis
execution of balance punchlist item and maintenance works at risk n cost of 6 laning of bhubaneswar jagatpur chandikhole of nh 16 in the state of odisha
corrigendum : major maintenance through strengthening and overlay of the existing highway from km.38.000 (guduvancherry) to km.51.300 (mahindra city) on tambaram to tindivanam section of nh 32 (old nh 45) in the state of tamil nadu on item rate (percentage) basis
construction of 6-lane underpass (1x30mx5.5m) at km.411.583 (near adigas or aadhya hotel at end of ramayampet bypass) under long-term rectification of morth identified blackspot tg-02-095,tg-04-22,tg-06-55 on nagpur-hyderabad section of nh-44, in t
corrigendum : short term repair and routine maintenance of 4 lane gohar ganj to bhopal including link road from obedullaganj to nh69 km 255.300 to 301.800 nh12 four lane with ps package5 in the state of mp on item rate mode
corrigendum : short term repair and routine maintenance of 4 lane bareli to gohar ganj km 193.450 to 255.300 nh12 four lane with ps package4 in the state of mp on item rate mode
rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire
corrigendum : short term maintenance for existing nh-312 of janipur-omarpur-krishnagar -bongaon- bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
corrigendum : construction of lvup on nh927 as long term rectification of morth identified blackspot in bahraich bypass to rupaidha nh927 in the state of uttar pradesh on epc mode
corrigendum : operation and maintenance for 10 years of the 10.315 km puruliya bypass section of nh-32 including balance work and dismantling and re-construction of defective or damaged section in the state of west bengal
corrigendum : construction of 4lane national highway at the damaged location near tharad nb from km 70.828 to km 71.500 and sb from km 70.815 to km 71.485 during the recent catastrophic event in the udhampur ramban section of nh44 on epc mode in the ut of jk.
long term rectification of the morth identified 03 nos of blackspots at ashrafpur jiyanpu and at lathgath on nh 128c in the state of uttar pradesh on epc mode
construction of 6-lane vup (1x20mx4.5m) at km.202.860 (panchalingala) under long-term rectification of morth identified blackspot (ap-02-085 / ap-04-183) along with slip road for sunikesula underpass (rhs) with mnb across kc canal on hyd-blr section.
rectification work on 8l access controlled expressway section of delhi- vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis (pkg 14)
corrigendum : capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
strengthening under the one-time improvement of the bypassed section of chilakaluripet town on nh-16 from km 358.000 to km 371.250 in the state of andhra pradesh on itemrate (percentage) basis.
corrigendum : construction of i mnb on service road at rui chhattishi and service road at rui chhattishi ch 23 280 to ch 24 150 bhs and walunj ch 10 300 to ch 11 400 rhs ii service road between ch 54 000 to ch 55 200 rhs on four laned section of ahilyanagar mirajg
rectification work on 8l access controlled expressway section of delhi- vadodara green field alignment (nh 148n)on epc mode under bharatmala pariyojana in rajasthan in the state of rajasthan on risk and cost of contractor on item rate basis (pkg 13)
corrigendum : operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups and parks) on delhi-agra section on nh-2 from km. 16.100 to km. 20.500 in delhi and haryana on item rate (percentage) basis.
corrigendum : overlay, routine maintenance and incident management work of two lane tarapur-sojitra- piplav-sunav-bandhni chowk section of nh-751dd in the state of gujarat
construction of truck lay-byes at 06 location between the already provisioned wsas on the 6l access controlled greenfield amritsar jamnagar economic corridor (nh 754a) in the state of rajasthan.(2nd call)
corrigendum : one time improvement of 3 nos of bypasses of mehgama hansdiha section of nh 133 i.e pathargama bypass length 3.360 km godda bypass length 14.620 km and poriyahat bypass length 4.505 km total length 22.485 km in the state of jharkhand
construction of 2l service road in the balance length of 3.23 km on either side of sira bypass from km 117.625 to km 119.900 lhs and km 120.650 to km 121.600 rhs in the stretch of tumkur chitradurga section from km 75.000 to km 189.000 of nh48 old nh
strengthening and overlay work on 2 or 4 lps section of gandhav sanchor gujarat border section of nh 68 in the state of rajasthan on item rate (percentage) basis
corrigendum : construction of light vehicular underpass lvup at pidhwal mod - construction of light vehicular underpass lvup at pidhwal mod as a long term road safety measure on epc mode for the package of 4 laning of varanasi-gorakhpur section of nh-29 package iii in the state of uttar pradesh