Find the latest clamps tenders in north central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of sander pipe clamp for wag-7 loco as per drg. no. a3/04/cnb/1927/5023/sg/alt- 'a' as pe r drg.no. a3/04/cnb/1927/5023/sg/alt- 'a' as per specn. - [ warranty period: 30 months after the dat e of delivery ] ]
View Insights
supply of supply of contact wire parallel clamp complete assembly with fasteners as per rdso drg n o. eti/ohe/p/6170(rev-c) and id no. 6171 or latest & rdso specification no.ti/spc/ohe/fittings/0130(10/3 0) with a&c slip no.1 or latest. (detailed specification is attached in documents section) [ warranty perio d: 30 months after the date of delivery ] ]
supply of broken screw, broken nail, collinear clamp as per attached specification [ warranty period : 36 months after the date of delivery ] ] medical director/ald, ncr cmm/bi/ eastern
corrigendum : supply of set of earth returning cable securing clamp for wag-9 locos as per els/gmo drg. no. trs/ gmo/e3/g-9/038 ref no.1-5. a set consists of 05 items in 06 nos. as per annexure attached. [ warranty p eriod: 30 months after the date of delivery ] ]
supply of contact wire parallel clamp (pg clamp) complete with fasteners as per rdso drg no.eti/ohe /p/6170[rev-c] (1)contact wire parallel clamp part no.6171, material: tin bronze, spec:is306 eti/ohe/49,n o off-2,(2)bolt m10x35/30 with nut ,material:ss,spec:eti/ohe/18 , no off:1 (3)spring washer a-10, material phosphor bronze , spec:eti/ohe/18, no off:1 [ warranty period: 30 months after the date of delivery ] ]
supply of bolted type come along clamp for panther conductor 7 bolts heavy duty. body made of steel i n two parts. alloy aluminium liner is provided to grip conductor .hook & eye bolt made of carbon steel. one number sample to be submitted for - bolted type come along clamp
supply of m.s. clamp for pneumatic hose 6.3mm, dia 14mm (four hole) as per drawing no. pneu 024. [make : own make equivalent to plasser] [ warranty period: 30 months after the date of delivery ] ] - m.s. clamp for pneumatic
supply of parallel clamp (157- 65/107/150) (ri no. 1031-3) complete assembly as per rdso drawin g no. eti/ohe/p/1030-3 rev-a or latest and rdso spec. no. ti/spc/ohe/fittings/0130 with a&c clip no. 1 [ warranty period: 30 months after the date of delivery ] ] - parallel clamp (157- 65/107/150) (ri no. 1031-3) complete assembly
supply of set of blocking diodes illumination test (pos.123.1) as per clw spec.no. clw/es/3/0055, al t-h. one set consists of 4 items in 17 numbers as following :- [1] diode block 0.3a-1600v-dsa1-16a abb document no.hbtb545480r0003 = 01 no. [2] connector socket 14 poles 6a-240v ac, abb document no . hbt415175p0001 = 01 no. [3] contact socket gri-ms 581.0 sqmm, abb document no.hbt415176p000 1 = 14 no. [4] safety clamp as per abb document no.hbt415177p0001 = 01 no. [ warranty period: 3 0 months after the date of delivery ] ] - set of blocking diodes
supply of parallel clamp (150/ 160)(1051-3) with fitting spec: ti/spc/ohe/fittings/0130-10/13-rev-1 or latest, drw: eti ohe p 1050-3 r a or latest, str: core-str-16 rev-1, or latest,. (packaging: item should be packed in a sack) unloading of material at the - parallel clamp (150/ 160)