FILTERS
supply of improved sej (assembly) : improved sej for lwr with 65 mm max. gap b.g. 60 kg wi th complete fittings excluding rubber pads. (drawing and item details as mentioned in set documents are applicable) drg: (rdso) rdso/t-6922, alt.05 spec: (rdso) irs/t-10-2025, (rdso) pr ovisional 2008 drg. no. rdso/t-6922 to 6934 set doc: set documents for rt-6922 [ warranty period: 30 months after the date of delivery ] ] - improved sej (assembly) : improved sej for lwr with 65 mm max. gap b.g. 60 kg with complete fittings excluding rubber pads. (drawing and item details as mentioned in set documents are applicable) drg: (rdso) rdso/t-6922, alt.05 spec: (rdso) irs/t-10-2025, (rdso) provisional 2008 drg. no. rdso/t-6922 to 6934 set doc: set documents for rt-6922
View Insights
supply of 1 in 12 tws turnout for 22.9t axle load for 10125 mm curved switch with 60e1a 1 thick web tongue rails for 1 in 12 turnout b.g. (1673 mm) for 60e1 rail with r260 grade on psc sleepers (drawings and item details as mentioned in set document are applicable) drg: (rdso) rdso/t-8780 alt.4 spec: (rdso) irs/t-10-2025 set doc: set_rt_8780_ alt_4 [ warranty perio d: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - 1 in 12 tws turnout for 22.9t axle load for 10125 mm curved switch with 60e1a1 thick web tongue rails for 1 in 12 turnout b.g.
supply of side sill of lhb coaches as per rcf drg. no. le11181, alt. d with primer application. mat erial and specification as per drawing. [ warranty period: 30 months after the date of delivery ] ] - side sill of lhb coaches as per rcf drg. no. le11181, alt. d with primer application. material and specification as per drawing.
supply of foot step complete for lhb coaches with automatic sliding body side door [ warranty period: 30 months after the date of delivery ] ] - foot step complete for lhb coaches with automatic sliding body side door
supply of web welded with top plate as per rcf drawing no. le11317 alt 'a' & le11319 alt 'a' with we lding as per rdso guidelines for irsm-41 material and with red oxide zinc chromate primer coating. make and material specification: as per drawing. [ warranty period: 30 months after the date of delivery ] ] - web welded with top plate as per rcf drawing no. le11317 alt 'a' & le11319 alt 'a' with welding as per rdso guidelines for irsm-41 material and with red oxide zinc chromate primer coating
supply of extra excise duty-spares for unit exchange consisting of 17 items of woodward governo r: (1).compensating valve"o" ring to woodward pt.no.1355053= 01 no. (2).bottom gasket to wooewar d pt.no.206364=01 no. (3)."oring" for sight glass to woodward pt.no.1355351=01 no. (4).low tube pl unger"o" ring to woodward pt.no.182298=01 no. (5).buffer spring to woodward pt.no.191791=02 nos. (6)."o" ring for elliptical to woodward pt no.1355117=01 no. (7).power case to column oil supply "o" ri ng to woodward pt.no.206148=01 no. (8).gasket,side pane to woodward pt.no.206584=02 nos. (9).sh ut down rod to woodward pt.no.362391=01 no. (10)."o" ring for diaphragm cap to woodward pt.no.13 55419=02 nos. (11).diaphragm cap to woodward pt.no.12913=01 nos. (12).lcr cover "o" ring to woo dward pt.no.1355183=01 no. (13).leaf spring to woodward pt.no.19173802 nos. (14).oil seal to wood ward pt.no.1364201=01 no. (15)."o" ring for serve meter to woodward pt.no.1355065=02 nos. (16).r etainer plate(shaft lock) to woodward pt.no.3997035=01 no. (17).paper insulator to woodward pt.no.2 03363=05 nos. as per drg.no. 13. leaf spring, oem no- 191738.14. oil seal, oem [ warranty period: 30 months after the date of delivery ] ] page 1 of 14 run date/time: 16/09/2026 18:45:33 stores/n f rly tender document tender no: 10264534 closing date/time: 19/10/2026 14:30 ngc depot, nfr - extra excise duty-spares for unit exchan
supply of straight pg metal thread end fitting pg-11, fit to conduit size nw -12, with hexagonal metric lock nut made of nickel plated brass with suitable o-ring annexure - a, table- a2, s.no.2 as per spec. no. r dso/pe/spec/ac-0138-2009,( rev-1) [ warranty period: 30 months after the date of delivery ] ] sr.section engineer/air - straight pg metal thread end fitting pg & tube clamp galvanized steel with rubber & a set of metal threaded end fitting & straight pg metal thread end fitting pg & straight polyamide metal thread
supply of locking piece sub assy. for manual uncoupling device of cbc as per sanrok drg no. 1ed-1134 or escort drg. no. sk-716 or fasl drg no. fasl/ucd/lc/0910. rdso spec. no. rdso/ 2011/cg-03 (rev-04) [ warranty period: 30 months after the date of delivery ] ] - locking piece sub assy. for manual uncoupling device of cbc as per sanrok drg no. 1ed-1134 or escort drg. no. sk-716 or fasl drg no. fasl/ucd/lc/0910. rdso spec. no. rdso/2011/cg-03 (rev-04).
supply of nylon cord reinforced grsp for thick web sej (drawing and item details as mentio ned in set documents are applicable) drg: (rdso) rdso_t_10153_alt_nil, (rdso) rdso_t_10154 _alt_nil, (rdso) rdso_t_10155_alt_nil, (rdso) rdso_t_10156 rdso_t_10157_alt_nil spec: (rdso) t- 55-2025 revision-01 set doc: set_ncr grsp_ rt_8822 [ warranty period: 30 months after the date of delivery ] ] - nylon cord reinforced grsp for thick web sej (drawing and item details as mentioned in set documents are applicable) drw: (rdso) rdso_t_10153_alt_nil, (rdso) rdso_t_10154_alt_nil, (rdso) rdso_t_10155_alt_nil, (rdso) rdso_t_10156 rdso_t_10157_alt_nil spec: (rdso) t- 55-2025 revision-01 set doc: set_ncr grsp_ rt_8822
supply of complete wsp system from m/s. knorr-bremse india pvt. ltd. for lhb coaches (all items will be as per rdso/2011/cg-04 rev. 03. all items required for installation &commi ssioning of wsp set on coach). [ warranty period: 36 months after the date of delivery ] ] - complete wsp system from m/s. knorr-bremse india pvt. ltd. for lhb coaches (all items will be as per rdso/2011/cg-04 rev. 03. all items required for installation &commissioning of wsp set on coach).
supply of controller kit for dynamic brake of gm locos consisting 06(six) items (a) spring clevis, kepco pt. no.100037= 2 nos(b)bearing 7/16 dia , kepco pt.no.100011= 2 nos (c) spring reverser lo ck kepco pt.no.100026 = 4 nos (d)spring plunger , kepco pt. no.100072 = 2 nos (e) socket bulb, ke pco pt.no.1000r38=2 nos (f) bulb dynamic brake controller -28 v, kepco pt no.1000r37=2 nos [ w arranty period: 30 months after the date of delivery ] ] ngc depot, nfr - controller kit for dynamic brake
supply of set of hanger lever pins for brake rigging of wap7 loco to rdso drg. no. skvl-585, sh -2, alt-2 & ref - 27, 28, 31, 33, 34, 35, 38 (qty 08 nos. each). ref - 30, 32, 36 (qty 16 nos. each) mate rial as per irs r-65/78 or latest revision (10 items 104 nos.). note: item under ref-30 should have m1 0 untapped hole. [ warranty period: 30 months after the date of delivery ] ] mldt dpeot, nfr - set of hanger lever pins for brake rigging of wap7 loco
supply of set of material for metallic pipe fitment in 3 phase electric locomotive as p er annexure attached. [ warranty period: 30 months after the date of delivery ] ] - set of material for metallic pipe fitment in 3 phase electric locomotive as per annexure attached
supply, installation, and commissioning of an air-spring organizer system at bogie repair sh op (lhb) along with all accessories as per annexure-i [ warranty period: 12 months after the date of deliv ery ] ] - supply, installation, and commissioning of an air-spring organizer system at bogie repair shop (lhb) along with all accessories as per annexure-i
supply of supply of 21/23 khz tx coils assembly suitable for cel make hassdac as per rdso specific ation rdso/spn/177/2012 (ver.3). [ warranty period: 30 months after the date of delivery ] ] - supply of 21/23 khz rx coils assembly suitable for cel make hassdac as per rdso specification rdso/spn/177/2012 (ver.3) as per schedule of requirements (specificaiton attached)
supply of door spring for lavatory door in lhb coaches. rcf drg no:- lw56424, item 19, alt-f or la test mat. spec.:- as per drawing with latest revision and amendment. [ warranty period: 30 months after the date of delivery ] ] - door spring for lavatory door in lhb coaches. rcf drg no:- lw56424, item 19, alt-f or latest mat. spec.:- as per drawing with latest revision and amendment.
supply of bogie bolster assly for air spring lhb coaches as per drg. no. lw04001, alt-g and mdts 204001, rev.01 [ warranty period: 60 months after the date of delivery ] ] - bogie bolster assly for air spring lhb coaches as per drg. no. lw04001, alt-g and mdts 204001, rev.01
supply of articulated spherolastic rubber bearing (silent block) as per escort drawing no: sk-1532 f or escort make aar-h tight lock coupler for lhb coaches and confirming to rdso specification no.-rds o/2011/cg-03 (rev.01) make :-escorts kubota limited-faridabad (pac item). make-gmt/tvs [ warra nty period: 36 months after the date of delivery ] ] - articulated spherolastic rubber bearing (silent block) as per escort drawing no: sk-1532 for escort make aar-h tight lock coupler for lhb coaches and confirming to rdso specification no.-rdso/2011/cg-03 (rev.01)
supply of secondary spring (inner) for ac-chair car (lwfczac & lwsczac), hot buffet (lwcbac ), ac 2nd class sleeper/eog (lwaccw), ac 1st class sleeper/eog (lwfac), ac three tier sleeper/eo g (lwaccn) drg. no. 1269513 ver-02r1 mat spec.:- rdso/2017/cg-01(rev-03) [ warranty period: 72 months after the date of delivery ] ] - secondary spring (inner) for ac-chair car (lwfczac & lwsczac), hot buffet (lwcbac), ac 2nd class sleeper/eog (lwaccw), ac 1st class sleeper/eog (lwfac), ac three tier sleeper/eog (lwaccn) drg. no. 1269513 ver-02r1 mat spec.:- rdso/2017/cg-01(rev-03)
supply of secondary spring ( outer ) for ac-chair car (lwfczac & lwsczac), hot buffet (lwcb ac), ac 2nd class sleeper/eog (lwaccw), ac 1st class sleeper/eog (lwfac) drg. no.:- 1269514 ver. 2r1 or latest mat. spec.: - rdso/2017/cg-01 (rev-03) [ warranty period: 72 months after the date of delivery ] ] - secondary spring ( outer ) for ac-chair car (lwfczac & lwsczac), hot buffet (lwcbac), ac 2nd class sleeper/eog (lwaccw), ac 1st class sleeper/eog (lwfac) drg. no.:- 1269514 ver. 2r1 or latest , mat. spec.: - rdso/2017/cg-01 (rev-03)
supply of bogie frame assembly for lhb coaches. drg. no. rcf's drg. no. lw03007 alt. [ warra nty period: 84 months after the date of delivery ] ] - bogie frame assembly for lhb coaches. drg. no. rcf's drg. no. lw03007 alt.
supply of set of control arm for lhb bogies consisting of (1) control arm lower right to fiat drg no. 1267717 ver 00r2, or latest. qty/set=01 no. (2) control arm upper to fiat drg no. 1277122 ver- 01r3, or latest. qty/set=01 no. [ warranty period: 30 months after the date of delivery ] ] - set of control arm for lhb bogies consisting of (1) control arm lower right to fiat drg no. 1267717 ver 00r2, or latest. qty/set=01 no. (2) control arm upper to fiat drg no. 1277122 ver-01r3, or latest. qty/set=01 no.
supply of protective tube complete for axle box guide arrangement to drawing/specific ation icfs drg no-t-0-1-610,alt no-x/13,item no- 1 and 3 in assembled condition. [ warranty per iod: 30 months after the date of delivery ] ] - protective tube complete for axle box guide arrangement to drawing/specification icfs drg no-t-0-1-610,alt no-x/13,item no- 1 and 3 in assembled condition.
supply of modified restrictor on cbc for slr and other generator van as per rdso drg. no. cg 10063 [ warranty period: 30 months after the date of delivery ] ] sse/cw/bg/kir, nfr - modified restrictor on cbc for slr and other generator van as per rdso drg. no. cg 10063
supply of electrical signal exchange system for three phase locomotive (each system co nsists of (i) two sets of led lights, (ii) operating panel/switches for loco pilot and assistan t loco pilot separately and (iii) harnessed cable for connection) to drg./spec. no.clw/ms/3/0 670, alt-2 or latest. make/brand -similar to ensav [ warranty period: 30 months after the date of deli very ] ] - electrical signal exchange system for three phase locomotive (each system consists of (i) two sets of led lights, (ii) operating panel/switches for loco pilot and assistant loco pilot separately and (iii) harnessed cable for connection) to drg./spec. no.clw/ms/3/0670, alt- 2 or latest. make/brand -similar to ensav
supply of supply of set of rubber profile for main door item as per drawing attached. ] - supply of set of rubber profile for main door item as per drawing attached.
supply installation of ss cover for modification eppfs/pfs and associated work for shifting of eppfs/pfs from under slung to on board as per rdso letter no-mc/cb/lf/anaerobic, dated-07.10.2024 in l hb non ac coaches.(as per drawing rdso/cg/drg/24054) [ warranty period: 30 months after the date of delivery ] ] - supply installation of ss cover for modification eppfs/pfs and associated work for shifting of eppfs/pfs from under slung to on board as per rdso letter no- mc/cb/lf/anaerobic, dated-07.10.2024 in lhb non ac coaches.(as per drawing rdso/cg/drg/24054)
supply of modem card for field unit of multi section digital axle counter systems (msdac) a s per rdso specn. no. rdso /spn/ 176/2013 or latest. cel make. [ warranty period: 30 months after the date of delivery ] ] - supply of modem card for field unit of multi section digital axle counter systems (msdac) as per rdso specn. no. rdso /spn/ 176/2013 or latest. cel make as per schedule of requirements
supply of glued insulated rail joints for bg uic 60/60e1 g3(l) drg: (rdso) rdso-t-2572 alt-5 spec: (rdso) manual for girj-2024 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - glued insulated rail joints for bg uic 60/60e1 g3(l) drg: (rdso) rdso-t- 2572 alt-5 spec: (rdso) manual for girj-2024 (drawing & specification to be adopted as per latest alteration if any till the date of closing of tender)
supply of 15 mm nipple 4" length , parallel thread for lhb coaches. mat. spec.:- is 1239-2 (201 1) [ warranty period: 30 months after the date of delivery ] ] - 15 mm nipple 4" length