Find the latest ventilator tenders in northern railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
corrigendum : supply of high end micu ventilator.( as per attached specification ) [ warranty period: 5 months aft er the date of delivery ] ]
View Insights
supply of cab heater complete duly fitted with box and heating element as per clw d rg. no. clw/es/sk-2/h-1 & specification no. clw/es/h-1 alt-e or latest [ warranty period: 30 months after the date of delivery ] ] dsl/amv, nr
supply of heating element 1.5kw, 220v, 50 hz, j- shaped, conforming to is 4159, with hexagonal fl ange, bspt thread 1.5 inch (47mm), pipe od 10.85mm, effective pipe length 154mm with stud type termi nals. dimension as per "annexure a" material required for vande bharat rakes. [ warranty period: 30 mo nths after the date of delivery ] ] sr.section engineer/n.