FILTERS
corrigendum : construction of gravel packed production tube well at water supply scheme arakhashi pora district anantnag.
View Insights
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.10 - sinking of 2 no. 200mm (all through) big dia. tube well, interconnection, construction of pump house and allied works of babupur pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.11 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall, providing common manifold and allied works of jamalpur pwss under habibpur block under malda division, phe dte, govt. of west bengal. (2nd
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.07 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall and allied works of hatnagar pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
mukandpura -drilling of 02 ... - mukandpura drilling of 02 no tubewell and installation of 02 no pumping machinery by dth rig method
basai- drilling of 02 nos.... - basai drilling of 02 nos tubewell and installation of 02 nos pumping machinery in village basai by dth rig method
operation and maintenance of 200mm tubewell deeping and flushing work at bisalpur and riico pumphouse uwss newai.
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.13 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall and allied works of parahar pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
kailram estimate for prov... - kailram estimate for providing and installing of 1 no. deep tubewell in place of failed tubewell no.1 in village kailram tehsil kalayat and district kaithal due to failed in chemical analysis
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.15 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall and allied works of saidpur pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
khaira and nimbhera -drilli... - khaira and nimbhera drilling of 02 no tubewell and installation of 02 no pumping machinery in village khaira and nimbhera by dth rig
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.08 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall and allied works of dahil pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
wbphed/ee/md/niet_13 (2nd call) of 2026-2027, sl. no. 07 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house, boundary wall and allied works of talpukur piped water supply scheme under habibpur block under malda division, phe dte, govt. of west bengal. (2nd call).
a. construction of 26 nos. 125mm dia x 40mmx61m mtr deep t/well with installation of im-ii hand pump and 1.85 mtr. dia pcc circular platform, drain as per unicef design & drawing under assured watar crisis area b. making soakpit 1.0 m diameter 2.0 meter deep with dry brick honey comb shaft with bricks of class designation 100 b for hand pump-26 nos. a. construction of 26 nos. 125mm dia x 40mmx61m mtr deep t/well with installation of im-ii hand pump and 1.85 mtr. dia pcc circular platform, drain as per unicef design & drawing under assured watar crisis area b. making soakpit 1.0 m diameter 2.0 meter deep with dry brick honey comb shaft with bricks of class designation 100 b for hand pump-26 nos.
village doni - balance work in piped water supply scheme under jal jeevan mission at village doni, block bhitarwar, district gwalior, based on tube well, including installation of electric submersible water motor pump, laying and jointing of rising main, feeder main and distribution network.
construction of pump chambe... - panjoopur, providing and installing 1 no. tubewell, laying of rising main, distribution system and functional household tap connection in 161 nos. mahatma gandhi gramin basti yojna plots and replacement of ac/pvc pipe line in harijan bast etc.
khori kalan- drilling of 0... - khori kalan drilling of 02 nos tubewell and installation of 02 nos pumping machinery in village khori kalan by dth rig
a- construction of 125mm dia x 45 mtr deep gravel packed t/well - 15 nos. b-construction of 125mm/115mm x 61 mtr deep drilled t/well- 10 nos. c-construction of plateform, drain and soakpit at each constructed hand pumps as per estimate a- construction of 125mm dia x 45 mtr deep gravel packed t/well-15 nos. b-construction of 125mm/115mm x 61 mtr deep drilled t/well- 10 nos. c-construction of plateform, drain and soakpit at each constructed hand pumps as per estimate.
corrigendum : augmentation of drinking water facilities to gujar basti check sangri khonmoh by way of bore well including pipe network pump station and other related works.
corrigendum : augmentation of water supply scheme chatterhama by way of construction of additional bore well.
budin -drilling of 02 no. t... - budin drilling of 02 no tubewell and installation of 02 no pumping machinery in village budin by dth rig
village eraya - balance work in piped water supply scheme under jal jeevan mission at village eraya, block bhitarwar, district gwalior, based on tube well, including installation of electric submersible water motor pump, laying and jointing of rising main, feeder main, and
sundh sedu -drilling of 02 ... - sundh sedu drilling of 02 no tubewell and installation of 02 no pumping machinery in village sundh sedu bas ki dhani by dth rig method
construction of a total of 24 new im-ii handpumps in areas facing drinking water shortages to address the issue of water scarcity expected during the year 2026-27 under the public health division, khagaria. (construction of 125mm x 40mm x 61m deep hand-operated tubewell with im-ii handpump, platform, and 1.0m diameter x 2.0m deep soak pit) under public health division, khagaria. construction of a total of 24 new im-ii handpumps in areas facing drinking water shortages to address the issue of water scarcity expected during the year 2026-27 under the public health division, khagaria. (construction of 125mm x 40mm x 61m deep hand-operated tubewell with im-ii handpump, platform, and 1.0m diameter x 2.0m deep soak pit) under public health division.
construction of 125mm x 40mm x 61 m deep tube well im-ii hand pump with 1.0m dia. x 2.0m deep circular soakpit for providing water in khagaria district under p.h division,khagaria for the year of 2026-2027.(group-2)
construction of 125mm x 40mm x 61 m deep tube well im-ii hand pump with 1.0m dia. x 2.0m deep circular soakpit for providing water in khagaria district under p.h division,khagaria for the year of 2026-2027.(group-1)
construction of 125mm x 40mm x 61 m deep tube well im-ii hand pump with 1.0m dia. x 2.0m deep circular soakpit for providing water in khagaria district under p.h division,khagaria for the year of 2026-2027.(group-3)
construction of 125mm x 40mm x 61 m deep tube well im-ii hand pump with 1.0m dia. x 2.0m deep circular soakpit for providing water in khagaria district under p.h division,khagaria for the year of 2026-2027.(group-4)
construction of 125mm x 40mm x 61 m deep tube well im-ii hand pump with 1.0m dia. x 2.0m deep circular soakpit for providing water in khagaria district under p.h division,khagaria for the year of 2026-2027.(group-5)
wbphed/ee/md/niet_13 (2nd call) of 2026-2027, sl. no. 09 - sinking of additional tube well to avoid crossing state boundary along with allied works like interconnection, construction of pump house of swarupganj piped water supply scheme under chanchal-i block under malda division, phe dte, govt. of west ben
kheri simbal wali estimat... - kheri simbal wali estimate for providing and installing of 1 no. deep tubewell in place of failed tubewell no.1 in village kheri simbal wali tehsil rajound district kaithal
construction of bore well near house of ali mohd. dar and others at bogund qaimoh block qaimoh, in district kulgam.
pachgaon nai ki dhani - dr... - pachgaon nai ki dhani drilling of 02 nos tubewell and installation of 02 nos pumping machinery by dth rig
nit 47.1 work of replacement of fluoride affected pipe line and construction of 1 no tubewell in rwss kanderiyon ki dhani block jobner in sub division jhotwara, district jaipur with material and 2 years defect liability period
work of replacement of fluoride affected pipe line and construction of 1 no tubewell in rwss kanderiyon ki dhani block jobner in sub division jhotwara, district jaipur with material and 2 years defect liability period
kherki mir singh sarpanch k... - kherki mir singh sarpanch ki dhani drilling of 02 no tubewell and installation of 02 nos pumping machinery by dth rig
kherki munshi ki dhani - d... - kherki munshi ki dhani drilling of 02 nos tubewell and installation of 02 no pumping machinery by dth rig
lohinga kalan - drilling o... - lohinga kalan drilling of 02 nos tubewell and installation of 02 nos pumping machinery in village lohinga kalan by dth rig
wbphed/ee/md/niet_13 (2nd call) of 2026-2027, sl. no. 10 - sinking of additional tube well to avoid crossing state boundary along with allied works like interconnection, construction of pump house of wari piped water supply scheme under harishchandrapur-i block under malda division, phe dte, govt. of west b
installation of 1 deep tub... - installation of 1 deep tube well at existing w/w mokhra khas
tajewala village (khairi bans) - providing and installing 1 no. tubewell in village tajewala (khairi bans), block partap nagar, distt. yamuna nagar (under shivalik development agency 2025-26). drilling of tubewell, providing and fixing pumping machi - tajewala village (khairi bans) - providing and installing 1 no. tubewell in village tajewala (khairi bans), block partap nagar, distt. yamuna nagar (under shivalik development agency 2025-26).
ariyanwala village providing and installing 1 no. tubewell at village ariyanwala, block partap nagar, constituency jagadhri, distt. yamuna naga (under shivalik development agency 2025-26). drilling of tubewell, providing and fixing pumping machi - ariyanwala village - providing and installing 1 no. tubewell at village ariyanwala, block partap nagar, constituency jagadhri, distt. yamuna nagar. (under shivalik development agency 2025-26).
construction of pump chambe... - dhorang gram panchayat, providing and installing 1 no. pvc t/well, laying of rising main and distribution system and functional household tap connection (fhtc) in dhani ajit nagar and laying of d.i pipe line in 82 nos. mahatma gandhi gramin basti yoj
corrigendum : deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method at dharamsal in district rajouri under ut capex 2026-27
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.16 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house and allied works of parail pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)
passina khurd mggby- providing distribution system and pvc tubewel - passina khurd mggby- providing distribution system and pvc tubewell
wbphed/ee/md/niet_13 (2nd call) of 2026-2027, sl. no. 11 - sinking of big dia. tube well, inter connection beteween tw existing pipe line, construction of pump house of betahal piped water supply scheme at harishchandrapur-ii block of malda district under malda division, phe dte, govt. of west bengal. (2nd
construction of tubewell and tank with power connection for water supply in khedra basti and gajela.
wbphed/ee/md/niet_20 (2nd call) of 2026-2027, sl.no.12 - sinking of 200mm (all through) big dia. tube well, interconnection, construction of pump house and allied works of emamnagar pwss under gazole block under malda division, phe dte, govt. of west bengal. (2nd call)