FILTERS
operation and maintenance of 133 nos. integrated water supply scheme of canning - i & ii, bhangore-i block under canning sub-division under alipore division, p.h. engineering dte. (for 365 days)
View Insights
08/2026-2027/se/swc/2nd call/02 - operation and maintenance of 133 nos. integrated water supply scheme of canning - i and ii, bhangore-i block under canning sub-division under alipore division, p.h. engineering dte. (for 365 days)
balance work of retrofitting p.w.s.s. village bahmani and semariya block sidhi distt. sidhi under jal jeevan mission (jjm)
work of utility shifting of phed pipe lines for widening of road by pwd from loonkarasnar to sekhsar under jen hq mahajan sub div loonkarasnar
danoda kalan - estimate fo... - construction of 4th boosting station and laying of balance / parallel against damaged ac/pvc/ci pipeline
annual rate contract for providing, laying, jointing, testing and commissioning of pipeline and allied works at various schemes under the jurisdiction of division baran, district baran.
annual rate contract for providing, laying, jointing, testing and commissioning of pipeline and allied works at various schemes under the jurisdiction of division baran, district baran
annual rate contract for providing, laying, jointing, testing, and commissioning of pipeline and allied works under various schemes within the jurisdiction of division baran, district baran.
supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division tijara under division bhiwadi (ncr) (arc)
supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various urban water supply schemes (uwss) / rural water supply schemes (rwss) in sub division mundawar under division bhiwadi (ncr) (arc)
supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division khairthal under division bhiwadi (ncr) (arc)
annual rate contract of supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division tijara under division bhiwadi (ncr)
annual rate contract for supply, laying, jointing, testing, and commissioning of hdpe pipelines of various sizes for various urban water supply schemes (uwss) and rural water supply schemes (rwss) in sub-division mundawar under division bhiwadi (ncr)
annual rate contract of supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division khairthal under division bhiwadi (ncr)
operation and maintenance of 107 nos. integrated water supply scheme of basanti block under canning sub-division under alipore division, p.h. engineering dte. (for 365 days)
08/2026-2027/se/swc/2nd call/01 - operation and maintenance of 107 nos. integrated water supply scheme of basanti block under canning sub-division under alipore division, p.h. engineering dte. (for 365 days)
amru- dnit for improvement ... - laying of distribution pipe line and regularization of insanitary connection to the household, and construction of 1 no. under ground tank
utility shifting of pipe line for road widing work from jodhpur to kharabera purohitan mdr road no 101 from ch. 15/500 to 24/000 under pwd deposit work under sub dn luni
utility shifting of pipeline for road widening work from jodhpur to kharabera purohitan (mdr road no. 101) from chainage 15/500 to 24/000, under pwd deposit work, sub division luni, as per tender document.
operation and maintenance of of 41 nos. integrated water supply scheme of sagar block and 23 nos. integrated water supply scheme of namkhana block under kakdwip sub-division under alipore division, p.h. engineering dte. (for 12 month)
08/2026-2027/se/swc/2nd call/04 - operation and maintenance of of 41 nos. integrated water supply scheme of sagar block and 23 nos. integrated water supply scheme of namkhana block under kakdwip sub-division under alipore division, p.h. engineering dte. (for 12 month)
nilokheri town installatio... - strengthening of water supply scheme by installing 1 tube well and laying the distribution network.
corrigendum : tauru town installation fo... - providing and laying water supply pipeline 100 mm (di) k-7 and 150mm (di) k-9 pipe including drilling of tubewells, constrution of 3 no. u.g.t. and pumping machinery for tauru town, district nuh, haryana(under amrut 2.0)
traori town installation fo... - strengthening of water supply scheme by installing 2 tube wells and laying the distribution network
nissing town installation ... - strengthening of water supply scheme by installing 2 tube wlls and laying the distribution network
supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division kotkasim under division bhiwadi (ncr) (arc)
supply, laying, jointing, testing, and commissioning of hdpe pipelines of various sizes in various uwss/rwss within sub divisions bhiwadi i and ii under division bhiwadi (ncr) (arc).
annual rate contract of supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division bhiwadi-ist, bhiwadi-iind under division bhiwadi
annual rate contract of supply, laying, jointing, testing and commissioning of various sizes hdpe pipelines in various uwss/rwss in sub division kotkasim under division bhiwadi (ncr)
corrigendum : work of providing, laying, and jointing of di and hdpe pipeline shifting at ajay marg, sector 07, pratap nagar, under the jurisdiction of city sub-division xii, s. pratap nagar, under city division-iv (s), jaipur (deposit work).
annual rate contract for construction and commissioning of 200 mm dia. including 2 years defect liability period under circle pratapgarh
rate contract of providing, laying, jointing and testing hdpe di pipe line including defect liability period of one year at circle pratapgarh in urban rural area, district pratapgarh.
annual rate contract for supply of labour for operation and maintenance of various water supply schemes and hp repairing at phed sub division salumber under the jurisdiction of phed rural division salumber, circle salumber, district salumber.
annual rate contract for supply of labour for operation and maintenance of various water supply schemes and hp repairing at phed sub dn sarada under jurisdiction of phed rural dn. salumber circle salumber distt. salumber
replacement of old pipeline form master tikira chowk to police barrack for water supply to bargarh town
replacement of old ac/ pvc ... - installation of 2 nos. additional tubewells and laying of di water supply pipelines
construction of overhead service reservoir (ohsr) with open well and provision, laying, and jointing of pipeline with full-house taps (fhtcs) under dmft 17th gc with a 1-year defect liability period at village kakariya, kakariya bhilwara, gram panchayat umarwas, block kumbhalgarh, district rajsamand.
construction of open well ohsr and providing l j of pipeline with fhtcs work under dmft 17th gc with 1 year defect liability period at village kakariya, kakariya bhilwara, g.p. umraowas, block kumbhalgarh, district rajsamand.
laying of 100mm di k7 pipeline in the uncovered areas of word no 1 2 6 7 8 - laying of 100mm di k7 pipeline in the uncovered areas of word no 1 2 6 7 8 within junagarh nac
construction of open well glsr and providing lj of pipeline with fhtcs work under dmft 17th gc with 1 year defeat liability period at hab ambaver kaniya bhatda jhalo ka bhilwara thala patiya gp banokada block kumbhalgarh district rajsad
construction of open well glsr and providing l j of pipeline with fhtcs work under dmft 17th gc with 1 year defect liability period at hab ambaver kaniya bhatda jhalo ka bhilwara thala patiya gp banokada block kumbhalgarh district rajsamand
jalalpura kalan group: construction of 3 canal based w/w (jalalpura kalan, intal kalan, intal khurd), augmentation of 2 exist. ww covering 3 villages (sangatpura, jajwan and danda kheri) by providing raw water through common pumping station and laying the di pipe lines in villages distt. jind: supply, installation, testing and commissioning of solar photovoltaic grid connected roof top plant with essential accessories at various location of proposed water works and all other works contingent thereto.
wbphed/ee/maad/niet _13 of 2026-2027.sl. no. 02 - providing fhtc, laying of the balance portion of upvc pipeline and parallel pipeline, supplying of sluice valves and di specials including 3 months trial run for nabinagar piped w/s scheme at kaliachak-i block under maad (2nd call).
laying of pipeline with crossing railway track by hdd method at rairakhol
construction of open well glsr and providing l j of pipeline with fhtcs work under dmft 17th gc with 1 year defeat liability period at hab- lakhela khari bhil basti hataji ka guda village hataji ka guda gp manawaton ka guda block kumbhalgarh
construction of open well glsr and providing lj of pipeline with fhtcs work under dmft 17th gc with 1 year defect liability period at hab- lakhela khari bhil basti village hataji ka guda gp manawaton ka guda block kumbhalgarh district rajsamand
corrigendum : repairing and replacement of damaged pipeline , river crossing and road crossing at various portion for uncovered area of paschim khairbari pwss under alipurduar division, phe dte.
construction and commissioning of 200mm diameter tube well and pipeline in village ramgarh, gram panchayat ramgarh, tehsil kishanganj, district baran.