FILTERS
widening & strengthening of nh-30 charra-miradatar-kurud road length 5.00 km,(2 lane) i/c culverts at distt. dhamtari.(dhamtari dn. ).
View Insights
wbpwd/pw(r)/se/shc/nit no 05 of 2026-2027(sl no-01) - surjopur dhamua road from 0.00 km to 6.80,km,strengthening work under south 24 parganas highway division in the district of south 24 parganas
wbpw(roads)/se/ nhc /nit-03 /2026-2027/01 - bindol bishnupur road, from 0.00 kmp to 9.70 km strengthening work under uttar dinajpur highway division in the district of uttar dinajpur.
widening and strengthening work on district border surpura liliya khakarki indawar mokala lamba jatan basni seja toonkiya gotan upto odr 32 in km. 0/0 to 13/0, 23/0 to 28/0 and 37/0 to 54/0. (ba 2026-27).
corrigendum : wbpw(r)d/nit- 02 of se/whc-i/2026-2027 - link rd from arbelia on kalna-baidyapur rd to dhapaspara via chagram h.c.(vr) from 0 to 4.60km and pandua-kulti rd(vr) from 0 to 2.60km-w and s work including construction of 10nos cd structures,805mtr protective work under burdwan south hwy div-ridf
strengthening and upgradation work of ramanujganj-wadrafnagar road length k.m. 6 to 21 and 28 to 54/6 = 43.60 k.m., distt.- balrampur-ramanujganj (c.g.) (work code w31661)
nl khan link road from 1.300 km. to 6.200 km., widening (from carriageway 5.50 m. to 10.00 m.) and strengthening work including reconstruction of culverts and drainage work under midnapur division, pwd - nl khan link road from 1.300 km. to 6.200 km., widening (from carriageway 5.50 m. to 10.00 m.) and strengthening work including reconstruction of culverts and drainage work under midnapur division, pwd in the district of paschim medinipur .
corrigendum : landslide treatment work from km. 7.020 to km. 7.160 (1 location) on narendranagar ranipokhri motor road (sh-77) in district tehri garhwal under epc mode.
corrigendum : budpur pairachali road, from 0.00kmp to 7.00kmp.... - budpur pairachali road, from 0.00kmp to 7.00kmp, widening (from 3.10 to 5.5 m) and strengthening work including re-construction of 7 nos of cd structure, 970 m protective work and 1360.0 m drainage work under purulia highway division, ridf xxxii
corrigendum : integrated transit corridor development and street network/ connectivity plan for the corridor/ influence zone along with detailed design of all intersections and mid-sections based on traffic and feasibility studies for the corridor / network. - consultancy services for conducting feasibility studies for the proposed construction of elevated and at-grade road infrastructure along the banks of najafgarh drain from dhansa border to wazirabad.
corrigendum : tengua-basulichawk road from 0.00 kmp to 4.800 km for the work of widening and strengthening (carriageway 3.75 to 5.5 m) with re-construction of culvert, protective works under tamluk division, p.w.dte. - tengua-basulichawk road from 0.00 kmp to 4.800 km for the work of widening and strengthening (carriageway 3.75 to 5.5 m) with re-construction of culvert, protective works under tamluk division, p.w.dte. in the district of purba medinipur.
corrigendum : wbpwd/pw(r)/se/ehc/nit-04 of 2026-27 - strengthening of aminpur boalghata road from chainage 0.00 km to 6.50 km, under barasat highway division l in the district of north 24-parganas.
old jessore road from doltala to ganganagar from 0.00 kmp to 1.80 kmp excluding 252 m nowai bridge portion widening and strengthening work under barasat highway division i in the district of north 24 parganas.
wbpwd/pw(r)/se/ehc/nit-03 of 2026-27 - old jessore road from doltala to ganganagar from 0.00 kmp to 1.80 kmp excluding 252 m nowai bridge portion widening and strengthening work under barasat highway division i in the district of north 24 parganas.
corrigendum : mahishadal geonkhali road, from 0.000 kmp to 8.500 km strengthening work .... - mahishadal geonkhali road, from 0.000 kmp to 8.500 km strengthening work (5.50 m carriageway) under tamluk highway division, p.w.(roads) dte. in the district of purba medinipur during the year 2026-2027, under ridf xxxii
widening and strengthening work on the pahasu-danpur road (other district road) from chainage 0.000 to 13.700.
wbpwd/pw(r)/se/ehc/nit-04 of 2026-27 - badkulla-aranghata road from 0.00 kmp to 12.50 kmp strengthening work with paver block for a length of 6500 m including construction of 03 nos cd structures, 1635 m protective works under nadia highway division ii in the district of nadia under ridf
remaining work of strengthening and widening from khirni-harsota mdr-233 to kankaria district border sawai madhopur via mamdoli, jhanoon, pilukheda, kankaria, district sawai madhopur, road bamanwas.
corrigendum : gopalchak-talla road from 6.800 km to 16.500 km - strengthening (with dbm, bc) work in the district of purba medinipur - gopalchak-talla road from 6.800 km to 16.500 km - strengthening (with dbm, bc) work in the district of purba medinipur under tamluk division, p.w.dte. during the year 2026-2027.
widening and strengthening work on the road from chainage 6.500 to 18.500 of the route connecting gandhinagar (at km 28 of the chakiya-iliya road) to the chhittampur-ramgarh border (via latifshah khas and chhittampur-dhodhanpur).
poraghati more to doctorkhana more road from 0.00 kmp to 11.035 kmp . - poraghati more to doctorkhana more road from 0.00 kmp to 11.035 kmp strengthening work carriageway 3.75 mtr. including 03 nos. culvert replacement, 310 mtr. protective work under nadia division, pwd in the district of nadia ridf-xxxii
poraghati more to doctorkhana more road from 0.00 kmp to 11.035 kmp strengthening work carriageway 3.75 mtr. including 03 nos. culvert replacement, 310 mtr. protective work under nadia division, pwd in the district of nadia ridf-xxxii
widening and strengthening work on the atrauli-palimukimpur road (other district road) in aligarh district from chainage 0.000 to 9.700 under the pandit deendayal upadhyaya yojana during the financial year 2026-27.
construction of roads under pradhan mantri gram sadak yojana for each of the following works including their maintenance for five years - l023-t-01 to purrur 2nd call
corrigendum : construction of drain and footpath at timarpur road under sub division-2 of division c and nd-roads during 2026-27.
corrigendum : wbpw(r)d/nit- 02 of se/whc-i/2026-2027/2 - pandabeswar-shamla rd(fr-21) from 0kmp to 4.80km, widening(from carriageway 3.75m to 5.50m) and strengthening work including construction of 10nos. of cd structures, 200m protective work and 3900m drainage work under asansol highway division - ridf.
corrigendum : wbpw(roads)/sr. se/ nhc /nit-06 /2026-2027/01 - kaliachak golapganj road, from 0.00 kmp to 9.00 kmp, strengthening work, from 9.00 kmp to 9.50 kmp, widening and strengthening work including construction of 2 nos. cd structures, protective work and other allied works under malda highway division in
corrigendum : wbpwd/se/sc/niet-02/2026-2027 - auliapur uttarbhag road, from 0.000 kmp to 10.000 kmp for the work of strengthening existing carriageway from 5.5m with reconstruction of culverts, protective works, drainage work in the district of south 24 parganas, under south 24 parganas divn
corrigendum : gopiballavpur to nayagram road (sh-9) from 35.00km to 41.600km for the work of strengthening ....... - gopiballavpur to nayagram road (sh-9) from 35.00km to 41.600km for the work of strengthening (carriageway 7.0 m) including reconstruction of 2 nos. cd structures and protective work under jhargram highway division, p.w.(roads) dte.
corrigendum : wbpwd/se/wc-i/enit-12/26-27/1 - jamuria chakdola road from 0 km to 8_260 km strengthening work in the district of paschim bardhaman under asansol division pwd
construction of 70 m span actual 100 m at site motorable bridge including approach road from dhandani to thichka via owain
widening and strengthening work on the shamshabad-ataipur-tedykon-narsinghpur road (other district road), including 5-year maintenance.
construction of roads under pradhan mantri gram sadak yojana for each of the following works including their maintenance for five years - l027-l 027 to mekokla (2nd call)
construction of hamirpur barkachhar to banjari adbahal road, length 12.50 km.
construction of sukli to sukliya road via panwadi, length 12.20 km. pac rs. 1431.12 lacs. second call on road and bridge sor effective from 11-04-2025. work period: 540 days, inclusive of rainy season.
widening and strengthening of aurangabad pavsarabaghwala road (odr) in km 8 to 14 in district bulandshahr.
corrigendum : wbpw(roads)/sr. se/ nhc /nit-07 /2026-2027/02 - mahipal chourangee more- kantabari road (vr) from 0.00 kmp to 7.00 kmp, strengthening work and construction of passing bays (with spacing 200m c/c along the length of the road) under dakshin dinajpur highway division in the district of dakshin din
construction of bt roads connecting shivadiya and gharawan to dholiya ji temple distt. udaipur
corrigendum : improvement with land acquisition of tadali yerur pandharkawada dhanora bhoyegaon gadchandur jiwati road (sh-373) km 2/800 to 5/00 and 7/00 to 12/500 taluka. chandrapur dist. chandrapur
widening and strengthening ... - widening and strengthening of khukhrana to mor majra road via assan kalan khandra, and shera in panipat (road id-7627) in israna constituency in panipat district.
corrigendum : wbpw(r)d/nit- 02 of se/whc-i/2026-2027/5 - rajgram mohorapur rd from 0.00km to 1.50km, strengthening work (5.50m - intermediate lane) and from 1.50km to 6.50km w and s work (single lane to intermediate lane) under birbhum highway division no i in the district of birbhum under ridf-xxxii.
ghati cutting and construction of nagal to tali road, tehsil hindaun
corrigendum : construction of drain and footpath at bhamashah road under sub division-2 of division c and nd-roads during 2026-27.
corrigendum : wbpw(roads)/sr. se/ nhc /nit-07 /2026-2027/03 - daulatpur-harirampur-dehaband (mdr) road from 16.00 kmp to 20.60 km, strenghtening work (carriageway 5.50mtr.) including 4 nos culverts replacement and 400m pcc drain under dakshin dinajpur highway division in the district of dakshin dinajpur.
improvement to sh-26 ramasgaon shevta mangrul road mdr-23 km 0/00 to 18/500 tq. ghansawangi dist. jalna (recall)
general sabarimala festival works 2026 27 improvements to chalakkayam pampa road km 0.000 to 4.500 providing bm and bc in mannarakkulanji pampa road ch53.500 to 58.000 under travancore devaswom board civil work general civil work
wbpwd/pw(r)/se/ehc/nit-04 of 2026-27 - nh-34 gadamarahat to mondouri road from 0.00 km to 9.00 km, strengthening work under barsat highway division no ii in the district of north 24 parganas
nh-34 gadamarahat to mondouri road from 0.00 km to 9.00 km, strengthening work under barsat highway division no ii in the district of north 24 parganas.
widening and strengthening of road from durga mata mandir to akola via babrana, sanwata, gadriyawas distt. chittorgarh
widening and strengthening of road from durga mata mandir to akola via babrana sanwata gadriyawas, district chittorgarh