FILTERS
installation of rainwater harvesting system at the officers hostel in jhansi district
View Insights
installation of 2 rainwater harvesting systems within the pwd residential complex at the circuit house premises in jhansi district
construction of 4x3x3 m span rcc box culvert on auhadpur road to bainjana gurudwara link road in district hardoi in f.y. 2026-27
construction of mudramau to laluapur interconnectivity road and 3x5 m span, 5 m height rcc culvert in district hardoi in f.y. 2026-27
construction of 2x3 m span rcc box culvert on kurseli hardaspur road to pareli singulapur road and additional approach road in district hardoi during financial year 2026-27
construction of administrative building ground plus three floors including internal water supply, sanitary installations and development and bulk services which include overhead terrace tank underground sump, pump room over ug sump, external water supply, tube wells external sewage, septic tank, soak pit, internal roads including foot paths, open parking, storm water drains, rain water harvesting, signages, external service connections and electrical works hyderabad central university, gachibowli, hyderabad. sh : interior design for the building.
repair work on bridges and culverts on various categories of roads under the sub-division of assistant engineer (fourth)
repair work on bridges and culverts on various categories of roads under the sub-division of assistant engineer (second)
repair works on bridges and culverts on various categories of roads under the jurisdiction of the assistant engineer (first).
repair of bridges and culverts on roads of various categories under the jurisdiction of the assistant engineer (thid).
construction of a concrete drainage channel from km 17 of the bhogpur raisy sh-67 and interlocking tiles on niranjanpur shivpuri mr under state plan 2026-27 in village niranjanpur, laksar constituency.
restoration of rain damages to bhattakuffer to koti road km 0/000 to 5/005 - providing protection work to head wall of culvert at km.0/980 and paver blocks in km. 1/128 to 1/145) . (excluding gst
construction of a minor bridge of 5x6 mtr span (6x5x4 mtr box culvert) on the connecting road from munaffarpur to mullapur via passgawan in janpad lakhimpur kheri.
construction work of a 1x6x4 mtr span box culvert on the raousa to guthunabujurg link road at km 1 in janpad lakhimpur kheri.
construction work of 3x3x3mtr rcc box culvert in km 1 of kutuwapur to mohiddinpur link road in janpad lakhimpur kheri.
construction work of a box culvert with a span of 1x6x4 meters at km 1 of nagra to achraula pahada road in janpad lakhimpur kheri.
construction of 1x6-meter span reinforced cement concrete (rcc) culvert to replace the damaged culvert on pilibhit-assam road to daheli link road at kilometer 2.
construction of 1x6-meter span rcc culvert to replace the damaged culvert on pipriya link road at km.1
construction 2x3m span minor bridge replace the damaged culvert/causeway on salarpur link road at km. 2
construction of a 1x6-meter span rcc culvert to replace the damaged culvert on the hareya bazar to madnapur ghat connecting road (at km 1) in sitapur district
construction work of 1x6 mtr rcc culvert at km 1 of mohiddinpur link road from kutuwapur link road in janpad lakhimpur kheri.
construction of a 4x3x3 meter span rcc culvert to replace the damaged culvert at the 4th kilometer of the ganeshpur-kotra connecting road (via odajhar and pipri sahdeva) in sitapur district