FILTERS
a/r and m/o on chhalanda link rod km. 0/00 to 4/800 - construction of r/wall between rd. 0/405 to 0/413
View Insights
a/r and m/o on koti junga road km 0/000 to 12/405 - construction of r/wall between rd 2/010 to 2/017
re-construction of front boundary wall and fixing concertina coil above entire boundary wall in icar-ciwa campus, bhubaneswar. sh- preparation and submission structural design and drawings.
construction work of damaged boundary wall and boundary wall increasing of charkhari nirikshan bhawan. (hindi document)
construction of boundarywall at inspection house ramsanehighat
construction of the boundary wall at the circuit house in jhansi
r/r damages on longni to sajao piplu road km 0/0 to 5/0 - p.l cc pavement at rd 0/030 to 0/065, 0/100 to 0/130, 0/150 to 0/200, 0/230 to 0/275, 0/540 to 0/610, 0/700 to 0/750, 1/600 to 1/650 71/915 to 1/930 c/o r/wall at rd 0/600 to 0/615,0/700 to 0/715.50 2/295 to 2/310, b/wall at rd 2/088 to 2/101
construction of damaged retaining wall of nh 107 between kakdagad to gaurikund in district rudraprayag under sr 2026-27, 2. placing gabions at different locations of nh 107 (kund, narayankoti, tarsali near kestreal helipad badasu, sersi) to make the sinking/sliding prone area rideable under sr/er 2026-27. (hindi image)
construction of trainee officers accommodation (phase-i) and boundary wall, main gate, santry post , guard room & watch tower and 01 no. type-vi quarter including development works (phase-ii) at ssb academy, bhopal (sh: repair of kone lift make lift installed at old hostel building) subwork/packages: repair of kone make lift installed at old hostel building
restoration of rain damages to bhattakuffer to koti road km 0/000 to 5/005 - providing protection work to head wall of culvert at km.0/980 and paver blocks in km. 1/128 to 1/145) . (excluding gst
a/r and m/o on purani koti to ghorna road in km. 0/000 to 3/000 - construction of r/wall between rd 2/760 to 2/786) .(excluding gst
/r and m/o on purani koti to ghorna road in km. 0/000 to 3/000 - construction of r/wall between rd 2/792 to 2/818) .(excluding gst
a/r and m/o on sadhora to mohanpur road km 0/000 to 6/525 - construction of r/wall between rd 1/603 to 1/609.50
a/r and m/o on sadhora to mohanpur road km 0/000 to 6/525 - construction of b/wall between rd 1/105 to 1/121
a/r and m/o on shoghi mehli junga sadhupul road km. 12/375 to 48/925 - c/o r/wall at r/d 40/195 to 40/216 ) (excluding gst)