FILTERS
construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate complex, electrical substations, underground water sump with pump room, sewage treatment plant and all associated civil, electrical, mechanical, horticulture and development works and services, complete on engineering, procurement and construction (epc) mode-i. subwork/packages: package
View Insights
corrigendum : contruction of industrial buildings and other infrastruture at bhabha atomic research centre, dodda ullarthi challekere taluk, chitradurga district karnataka. sh construction of various precast rcc buildings and peb buildings including other ancillary buildings such as canteen, gas bank , project house , entry portal in zone-i(gate complex with security gate), entry portal in zone -ii (gate complex with security gate), guard houses,fire pump house, pump room for rain water harvesting sewage treatment plant , site development works, specialised works, local body approvals, and other miscellnious works including internal water supply, sanitory installations drainnage and comprehensive electrical and mechanical services comprasing substation equipment, dg sets, internal electrical installaitons and fans lt panels cabling lighting protection system, fire alarm and public addresss system.........and other specialised e&m services (package-ii)
wbpwd/pw(r)/sepd/piu-i/nit-20 of 2026-2027_sl_1 - bishnupur - kotulpur rd from18.00kmp-36.00 km.widening(from carriageway7.00mto10.00 m)-strengthening work including construction of 20 nos. of cd structures, 890 m protective work- 1970 m drainage work under bishnupur div, pwd, district bankura.
corrigendum : remodelling of main burari drainage network including construction of new precasted drain.
wbpwd/pw(r)/sepd/piu-i/nit-17 of 2026-2027_sl_1 - gangajalghati - saltora road from ch. 0.00 km to ch. 22.00 km., widening and strengthening work including construction of 15 nos. cross drainage structure and allied work under bankura highway division in the district of bankura.
wbpwd/pw(r)/sepd/piu-i/nit-24 of 2026-2027_sl_1 - keshiary to nayagram rd 0.00to11.57km (sh -9)for strengthening and widening (from carriageway width 5.5to10.0m -2 lanewith pavedshoulder) reconst. of 16 nos cd structures, 265mprotective work - 765mdrainwork under jhargram div,pwd, dist of jhargram.
corrigendum : construction of 2500 seater lecture hall g plus 3 complex along with utility cum ess block pump room ug sump including water supply and sanitary installations electrical installations vrv vrf system fire fighting and fire alarm system lift ups system lan system cctv ibms other civil and e and m development works etc for iit mandi kamand hp in epc mode i subwork/packages: construction of 2500 seater lecture hall g plus 3 complex along with utility cum ess block pump room ug sump including water supply and sanitary installations electrical installations vrv vrf system fire fighting and fire alarm system lift ups system lan system cctv ibms other civil and e and m development works etc for iit mandi kamand hp in epc mode i
wbpwd/pw(r)/sepd/piu-i/nit-19 of 2026-2027_sl_1 - bansa-ii rd(sh-4)from 0.00 kmp to14.08km, widening (carriageway from 5.50m to 7.00 m)and strengthening works including const.of 08nos. of cd structures, 3230m protective work and 235m drainage work under bankura division, pwdte in the dist of bankura
remodeling of existing drain and repair of footpath at rama road, road no. 36 satguru ram sing marg (from patel road to sd public school) , madhav setu marg, suman lata badhola marg and vishwakarma marg as per drainage master plan under pwd wr-25
corrigendum : construction of bus stand, workshop ,and e-bus depot nadaun, tehsil nadaun district hamirpur, h.p - part-i-civil work of bus stand , workshop, and e-bus depot i/c bus charging bay and covered parking i.e. building portion i/c ws, si , site development, boundary wall, rain water harvesting tank, septic tank, c/o pavement work, c/o approach road,
construction of national institute of open schooling (nios) at sector-40,atal nagar,village uparwara,naya raipur (c.g.) (1 no office block b plus g plus 2),1 no guest house g plus 1 & 1 no type v quarter g plus 1 icluding water supply,sanitary installation, drainage development and electrical installations.
wbpwd/pw(r)/sepd/piu-i/nit-15 of 2026-2027_sl_1 - bikrampur jamboni rd (vr) from 0.00 to 12.20 km, widening and strengthening including replacement of 12 nos. cross drainage structures, 190 mtr. boulder sausage and 315 mtr. pcc drain under bishnupur div, p.w.d., dist of bankura under ridf-xxxii
wbpwd/pw(r)/sepd/piu-i/nit-21 of 2026-2027_sl_1 - managersbunglowtorabastabustyrd0.00kmpto6.05km),0.00kmto2.60kmwidening3.00mto3.75mstrengtheningworksand2.60to6.05km-newconstcarriageway3.75 mworks,constof17cdstructures,5km of protective,3100nos.of parapet wall6050mdrainunder kalimpong div,ridfxxxii
construction of english medium college at old central jail premises, agartala, tripura, during the year 2026-27 sh balance portion building portion including internal water supply, sanitary installation, sewage and drainage works. 2nd call
remodelling of existing storm water drains with precast drain as per new master drainage plan at najafgarh kakrola road (sai baba mandir to mungeshpur outfall both side) road id-1232 under sd-2, swr-2, new delhi..
general idukki lac kattappana ring road and connected roads improvements providing bm and bc providing bm bc kattappana ring road general civil work - estimate includes provisions for 150mm gsb 150mm wmm, 50mm bm rand 30mm bc. necassary drain and utility duct under footpath, traffic safety items, directions boards , crash barriers, road studs, thermo plastic compound paints,street lights etc.
wbpwd/pw(r)/se/ehc/nit-04 of 2026-27 - badkulla-aranghata road from 0.00 kmp to 12.50 kmp strengthening work with paver block for a length of 6500 m including construction of 03 nos cd structures, 1635 m protective works under nadia highway division ii in the district of nadia under ridf
corrigendum : construction of drain and footpath at timarpur road under sub division-2 of division c and nd-roads during 2026-27.
corrigendum : remodelling and desilting of existing drain on rhs side of jagatpur /sangam vihar road.
corrigendum : construction of drain and footpath at bhamashah road under sub division-2 of division c and nd-roads during 2026-27.
construction of cement concrete road, internal drainage line, beautification work, compound wall, community hall in various places of tisgaon sajapur, vadgaon kolhati, abdimandi, daultabad, sharnapur, ikarodi and other villages in tq. chhatrapati sam
storm water drainage and restoration work on the varanasi-adalpura-chunar-kachhwa road (sh-74) in varanasi district, covering the section from chainage 0.000 to 4.500.
corrigendum : c/o level-iii, trauma centre building at kotkhai, distt. shimla, h.p. c/o civil work, ws and si rain harvesting tank, septic tank i/e soak pit, site development and electrical installation etc.
proposed bodoland secretariat green field development work by earth filling and drainage system for the fy 2026-27. tn_37_01
c/o balance work of tikkari to keterwari/dodra kawar portion from larot to chanshal pass km.11/0 to 30/0 sh:-c/o r/wall b/wall pcc parapets v-shape drain m/t x drainage work ordinary km stone & 200mm stone etc) and five year maintenance km.11/o to 30/o
construction work of 2 no. f type, 15 no. g type, 20 no. h type, and 15 no. i type residential quarters for officers and employees of the civil court, gariyaband, with approach road, drainage works, cow catcher, overhead tank, boundary wall, and electrification, located in district gariyaband (gariyaband division).
wbpwd/se/sc/niet-04/2026-2027 - natagachi to chiner more road from ch. 0.00 kmp to ch. 4.75 kmp strengthening and widening in stretches work including construction of 6 nos. cd structures, 1200m protective work, 200m drainage work under south 24 parganas division, pwd
construction of school building at a d nagar english medium high school, agartala, west tripura under ridf-xxx during the year 2025-26 - building portion including internal water supply, sanitary installation, sewage and drainage works.
corrigendum : strengthening, widening including footpath and upgradation of cd work of golyana to lohargal dham road - as per nit
work of imp./stg./wdg. of 07 nos. roads approved under work programme 2026-27 in kalka constituency. 1. link road khera to jattan majri( road id 8610), 2. link road marranwala (road id 2922), 3.link road ramnagar to sotewala (8611), 4.link road ratpu - wdg with 150 mm gsb and stg with 225 mm wbm 150mm gsb, 225 mm wbm, 80 mm ipb, retaining wall, toe wall, side drain etc. widening and stg of rad, construction of drain stg of road stg ,drain etc wbm,ipb,etc strengthening of link road pin
construction of railway under bridge below railway line on burji no. 190-7-8 from sehar to chappara in bhiwani district. (reinvite-2) - cost of approaches to under bridge, cost of height guage, harvesting well, cost of rcc drain with grating, cost of rcc drain without grating, cost of raod furniture, cost of electrification, cost road/service road
2 no. various odr roads (1) duloth ahir to dhani sohla road (road id 2760) (2) hard shouldering and construction of side drain of road from kanina-mohindergarh road to masani (road id 8429) under work programme 2026-27 under head-5054 in mahendergarh
drainage scheme mc sopore.
corrigendum : special repair by providing... - km 0.00 to 1.30 providing widening with 150mm gsb and stg with 100mm thick dlc plus 280mm thick pqc in 7.00 m cw. and providing ccb over 150mm thick gsb in 4.59 m (along both side of cw) plus provision for side drain (both side)
lanes/drains. beautification and protection works in different wards of khour town (capex budget 2026-27) (new works)
construction of new government college building including water supply, sanitary fittings, septic tank, rain water harvesting, approach road & electrification works at bhimbhouri, block berla, district bemetara (chhattisgarh).
corrigendum : drain construction work on state highway-123 from kilometre 5 to 9 and kilometre 14 to 15, sirsa koraon dramandgnaj marg.
improvement and upgradation of lambidhar to tikri road km 0/000 to 5/280 sh:- c/o earth work, protection work, cross drainage work, road side v-shaped drain, metalling and tarring, road safety work and dumping structure in k
lanes and drains of beerwah ulb.
construction of 4 type-3 and 4 type-4 residential units at the lrp colony campus, construction of 12 transit hostel units at the lrp colony campus, construction of the boundary wall, sewer line, and drain for the lrp colony.
c/o new civil hospital at dharampur in tehsil dharampur distt. mandi (100 bedded hospital) - c/o balance work i.e building portion, w.s, s.i and rain water harvesting
improvement to sh 81 to aagashi vatar nala wagholi nirmal vasai papadi umela naigoan juchandra bapane road sh 83 km 6/100 to 7/500 tal vasai dist palghar (construction of rcc gutter, stbt road).
const. rcc and brick drain septic tank approach rd to lok sewa bhawan const. of boundary wall toilet block security booth etc. and demolishing and dismantling of front part of block b incl. repairing and reconst. work at janata bhawan complex ghy-6
construction of fm relay station establishment at vizianagaram, andhra pradesh including, internal water supply, sanitary installations, drainage, internal electrical installations, ceiling / exhaust fans, fire fighting system with down comer and hose reel arrangement, manual fire alarm system, cctv and alighted equipments, lan networking system, ups system and horticulture works etc. subwork/packages: construction of fm relay station establishment at vizianagaram, andhra pradesh including internal water supply, sanitary installations, drainage, internal electrical installations, ceiling / exhaust fans, fire fighting system with down comer and hose reel arrangement, manual fire alarm system, cctv and alighted equipment, lan networking system, ups system and horticulture works etc.
05 no. work (i) const of rc... - 05 no. work (i) const of rcc side drain and laying of 80mm ipb on old nh-71 a in jassia from 16.700 to 17.300 (both side) (id-10281) (ii) constr. of retaining wall on ladhout to kiloi shiv mandir from 2.0 to 2.100 and 2.180 to 2.780 (id-1855) (iii) s
construction of 150 bedded hospital for esic at kalol, gandhinagar, gujarat. sh: planing, designing and construction of buildnigs including internal water supply, sanitary installation and drainage, development work like ug sumps terrace water tanks, water treatment plant, sewage treatment plant, effluent treatment plant, rain water harvesting, internal roads, pathways, parking facilities, filttered and unfilleted water supply lines, strom water drains, external sewage system, services tranches, landscaping horticulture works, internal electrical installations, fire alarm system, firefighting system, lifts, sub-stations, dg sets, ups, hvac system, solar water heating system, cctv, ot, lan, ip based epbax, system, mechanised car parking system etc and their integration, making fit for occupation, all complete on engineering, procurement and construction basis (epc). sh: providing and installing customized factory made furniture at esic kalol, gandhinagar (gujarat)
construction of evm warehouse kottayam-composite work - construction of rcc framed structure building including the sanitary installations and plumbing fittings/accessories, fire fighting, underground sump with pump house and electrification etc..
construction of slab drain on nimgul pathare malpur suray kharde bk. methi shindkheda varpade road sh-472 km.36/300, 36/800, 36/900, 37/700, 37/850 and 38/400 tal.shindkheda dist.dhule (part- bhadne village to railway station)
corrigendum : construction of krishna nagar drain from ecr (at transformer near more super market) to canal street at krishna nagar 1st cross extension in krishna nagar, puducherry.
construction of 50 bedded new residential hostel (female) building and furnishing work, including water supply, sanitary fittings, septic tank, rainwater harvesting, landscaping, and electrification work at diet college, achhoti, district durg, chhattisgarh (deposit work) (deposit work - without escalation and bonus)