FILTERS
poraghati more to doctorkhana more road from 0.00 kmp to 11.035 kmp strengthening work carriageway 3.75 mtr. including 03 nos. culvert replacement, 310 mtr. protective work under nadia division, pwd in the district of nadia ridf-xxxii
View Insights
widening and strengthening work on the atrauli-palimukimpur road (other district road) in aligarh district from chainage 0.000 to 9.700 under the pandit deendayal upadhyaya yojana during the financial year 2026-27.
construction of roads under pradhan mantri gram sadak yojana for each of the following works including their maintenance for five years - l023-t-01 to purrur 2nd call
corrigendum : construction of drain and footpath at timarpur road under sub division-2 of division c and nd-roads during 2026-27.
wbpwd/se/wc-i/enit-12/26-27/1 - jamuria chakdola road from 0 km to 8_260 km strengthening work in the district of paschim bardhaman under asansol division pwd
construction of 70 m span actual 100 m at site motorable bridge including approach road from dhandani to thichka via owain
construction of high level bridge i/c approach road across narangi river in km. 2/6 on seoni to rajpur road.
widening and strengthening of the road from chandauli (nh-2) to dharauli, covering the stretch from chainage 3.850 km to 14.200 km.
widening and strengthening work of chandauli (nh-2) to dharauli road from ch 3.850 to 14-200 in chandauli district
construction of roads under pradhan mantri gram sadak yojana for each of the following works including their maintenance for five years - l027-l 027 to mekokla (2nd call)
e tender notice no. 11 for the financial year 2026-27, work item no. 01 - widening and strengthening of naitale to devgaon road, mdr.126, km. 12/800 to 27/400, taluka niphad, district nashik.
balance work for construction of road from l033- tuli to phagoli pkg no jk14-563, jk14-564-40 mtr span through type steel bridge and jk14-645
construction of sukli to sukliya road via panwadi, length 12.20 km. pac rs. 1431.12 lacs. second call on road and bridge sor effective from 11-04-2025. work period: 540 days, inclusive of rainy season.
road from nh connection (basantipur panchyat) to nh connection (near dharmpur via tv kulam) in the district of north and middle andaman at block mayabunder (5th call)
widening and strengthening of aurangabad pavsarabaghwala road (odr) in km 8 to 14 in district bulandshahr.
wbpw(roads)/sr. se/ nhc /nit-07 /2026-2027/02 - mahipal chourangee more- kantabari road (vr) from 0.00 kmp to 7.00 kmp, strengthening work and construction of passing bays (with spacing 200m c/c along the length of the road) under dakshin dinajpur highway division in the district of dakshin din
construction of bt roads connecting shivadiya and gharawan to dholiya ji temple distt. udaipur
corrigendum : improvement with land acquisition of tadali yerur pandharkawada dhanora bhoyegaon gadchandur jiwati road (sh-373) km 2/800 to 5/00 and 7/00 to 12/500 taluka. chandrapur dist. chandrapur
widening and strengthening ... - widening and strengthening of khukhrana to mor majra road via assan kalan khandra, and shera in panipat (road id-7627) in israna constituency in panipat district.
corrigendum : construction of drain and footpath at bhamashah road under sub division-2 of division c and nd-roads during 2026-27.
wbpw(roads)/sr. se/ nhc /nit-07 /2026-2027/03 - daulatpur-harirampur-dehaband (mdr) road from 16.00 kmp to 20.60 km, strenghtening work (carriageway 5.50mtr.) including 4 nos culverts replacement and 400m pcc drain under dakshin dinajpur highway division in the district of dakshin dinajpur.
improvement to sh-26 ramasgaon shevta mangrul road mdr-23 km 0/00 to 18/500 tq. ghansawangi dist. jalna (recall)
general sabarimala festival works 2026 27 improvements to chalakkayam pampa road km 0.000 to 4.500 providing bm and bc in mannarakkulanji pampa road ch53.500 to 58.000 under travancore devaswom board civil work general civil work
wbpwd/pw(r)/se/ehc/nit-04 of 2026-27 - nh-34 gadamarahat to mondouri road from 0.00 km to 9.00 km, strengthening work under barsat highway division no ii in the district of north 24 parganas
nh-34 gadamarahat to mondouri road from 0.00 km to 9.00 km, strengthening work under barsat highway division no ii in the district of north 24 parganas.
widening and strengthening of road from durga mata mandir to akola via babrana, sanwata, gadriyawas distt. chittorgarh
widening of 2-lane to 4-lane ( km 0.00 to 6.70) road form pinjore mallah junction upto parwanoo barrier in distt. panchkula ( road id 10400) - widening of 2-lane to 4-lane ( km 0.00 to 6.70) road form pinjore mallah ju
construction of tarasewaniya, guradia, khejda dev, manikhedi kot, bhopal length-9.00 k.m. pac rs. 1260.07 lacs first call on road and bridge sor wef 11-04-2025 work period 365 days i/c rainy season
construction of cement concrete road, internal drainage line, beautification work, compound wall, community hall in various places of tisgaon sajapur, vadgaon kolhati, abdimandi, daultabad, sharnapur, ikarodi and other villages in tq. chhatrapati sam
corrigendum : widening and strengthening work of somna-khair-tanti gram road to rayat mod via khyamai (odr) from chainage 0.000 km to 3.350 km, under the logistics plan.
strengthening work of naulas, lakholi, dargawan, tilak marg, length 18.00 km. pac rs. 1202.27 lacs on road and bridge sor w.e.f. 11-04-2025. first call. work period 365 days, including rainy season.
wbpwd/pw(r)/se/shc/nit no 04 of 2026-2027(sl no-01) - nimania kaikhali road from 0.00 kmp to 12.53 kmp surfacing work under diamond harbour highway division in the district of south 24 parganas. project id pd262753241s000. .
under dharmarh scheme, widening and strengthening to four lanes of the fazilnagar baghauch ghat road in kushinagar district, from km 0.000 to km 1.40.
widening & strengthening of shyam nagar-deori road (village road no.16), length 6.25 km. including culverts at district gariyaband (gariyaband dn.).
widening and strengthening work (to a width of 5.50 meters) on the kurai ghat connecting road from gt road (major district road). widening and strengthening work (to a width of 5.50 meters) from gt road km 176 (kesharwani dhaba) to the sayyad sarawan-mohiuddinpur-sh-95 gugwa ka bagh route (major district road). widening and strengthening work (major district road) from kaju to badanpur ghat via gt road, covering chainage 7.800 to 13.100.
1. widening and strengthening work on the chhapravat-kota-sanota road (other district road) in bulandshahr district, from chainage 0.000 km to 5.100 km. 2. widening and strengthening work on the dibai-karnavas road (other district road) in bulandshahr district, from km 5 to km 8. 3. widening and strengthening work on the anupshahr-karnavas-rajghat-narora-ramghat-kalyan singh road (other district road) in bulandshahr district, from km 16(650) to km 20(850) (length: 4.00 km). (hindi document)
construction of kandanar to muriyamipara andalpara road length km 1/2 to 9/6 = 8.5 k.m block-darbha, district- bastar.
corrigendum : design and construction of road over bridge(rob) at majiath, ward no. 07, shimla including both sides approach roads - attached as sbd
corrigendum : remaining work of widening and strengthening of pratapgarh luhariya nakor barawarda dholapani dhawata chhotisadri road (mdr 260) km 0/0 to 12/400 and 19/200 to 27/0 (risk and cost)
remaining work of widening and strengthening of pratapgarh luhariya nakor barawarda dholapani dhawata chhotisadri road (mdr 260) km 0/0 to 12/400 and 19/200 to 27/0 (risk and cost)
remaining work pratapgarh luhariya nakor baravarda dholapani dhavta chhoti sadri mdr widening and strengthening km 0/0 to 12/400 and 12/200 to 27/0 (risk and cost)
widening and strengthening of bb nagar to simbhaoli (nh-9) tak via hingwara, ladpur, and bharna in district.
construction of kumer to dhabla hussianpur via hadlaykhurd road, length- 10.45 km including electric pole shifting work division shajapur (iii call)
widening and strengthening work on the lakhna connecting road (from km 6 of the sonwara bypass road) via manikpur mohan and dadora (chainage 0.000 to 5.700). (hindi document)
c/o balance work of tikkari to keterwari/dodra kawar portion from larot to chanshal pass km.11/0 to 30/0 sh:-c/o r/wall b/wall pcc parapets v-shape drain m/t x drainage work ordinary km stone & 200mm stone etc) and five year maintenance km.11/o to 30/o
balance work for construction and maintenance of road from neoch to shibras package- jk14-211, stage- iandii combine, phase- ix, block mahore, district reasi, length-15.000 kms
widening and strengthening work of bulandshahr link road from chainage 0.000 to 3.680.
construction of road from swarna jayanti park to gulmohar road (length 1.60km.) pac rs. 983.63 lacs first call on road and bridge sor wef 11-04-2025 work period 365 days i/c rainy season
chakulia (pathati more) - majhlishpur road (vr) from 0.00 kmp to 13.40 kmp, - strengthening work under uttar dinajpur division, p.w.d. in the district of uttar dinajpur under ridf-xxxi.( 3rd call)