Find the latest path tenders in public works department for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
construction of cement concrete road, internal drainage line, beautification work, compound wall, community hall in various places of tisgaon sajapur, vadgaon kolhati, abdimandi, daultabad, sharnapur, ikarodi and other villages in tq. chhatrapati sam
View Insights
corrigendum : widening and strengthening work of somna-khair-tanti gram road to rayat mod via khyamai (odr) from chainage 0.000 km to 3.350 km, under the logistics plan.
strengthening work of naulas, lakholi, dargawan, tilak marg, length 18.00 km. pac rs. 1202.27 lacs on road and bridge sor w.e.f. 11-04-2025. first call. work period 365 days, including rainy season.
wbpwd/pw(r)/se/shc/nit no 04 of 2026-2027(sl no-01) - nimania kaikhali road from 0.00 kmp to 12.53 kmp surfacing work under diamond harbour highway division in the district of south 24 parganas. project id pd262753241s000. .
under dharmarh scheme, widening and strengthening to four lanes of the fazilnagar baghauch ghat road in kushinagar district, from km 0.000 to km 1.40.
widening & strengthening of shyam nagar-deori road (village road no.16), length 6.25 km. including culverts at district gariyaband (gariyaband dn.).
construction of kandanar to muriyamipara andalpara road length km 1/2 to 9/6 = 8.5 k.m block-darbha, district- bastar.
corrigendum : design and construction of road over bridge(rob) at majiath, ward no. 07, shimla including both sides approach roads - attached as sbd
corrigendum : remaining work of widening and strengthening of pratapgarh luhariya nakor barawarda dholapani dhawata chhotisadri road (mdr 260) km 0/0 to 12/400 and 19/200 to 27/0 (risk and cost)
remaining work of widening and strengthening of pratapgarh luhariya nakor barawarda dholapani dhawata chhotisadri road (mdr 260) km 0/0 to 12/400 and 19/200 to 27/0 (risk and cost)
remaining work pratapgarh luhariya nakor baravarda dholapani dhavta chhoti sadri mdr widening and strengthening km 0/0 to 12/400 and 12/200 to 27/0 (risk and cost)
corrigendum : construction of district library in the campus of old sdm court complex at nuh in nuh district (including e.i. internal, road and parking and fire fighting works)
widening and strengthening of bb nagar to simbhaoli (nh-9) tak via hingwara, ladpur, and bharna in district.
construction of kumer to dhabla hussianpur via hadlaykhurd road, length- 10.45 km including electric pole shifting work division shajapur (iii call)
widening and strengthening work on the lakhna connecting road (from km 6 of the sonwara bypass road) via manikpur mohan and dadora (chainage 0.000 to 5.700). (hindi document)
c/o balance work of tikkari to keterwari/dodra kawar portion from larot to chanshal pass km.11/0 to 30/0 sh:-c/o r/wall b/wall pcc parapets v-shape drain m/t x drainage work ordinary km stone & 200mm stone etc) and five year maintenance km.11/o to 30/o
balance work for construction and maintenance of road from neoch to shibras package- jk14-211, stage- iandii combine, phase- ix, block mahore, district reasi, length-15.000 kms
construction of road from swarna jayanti park to gulmohar road (length 1.60km.) pac rs. 983.63 lacs first call on road and bridge sor wef 11-04-2025 work period 365 days i/c rainy season
chakulia (pathati more) - majhlishpur road (vr) from 0.00 kmp to 13.40 kmp, - strengthening work under uttar dinajpur division, p.w.d. in the district of uttar dinajpur under ridf-xxxi.( 3rd call)