FILTERS


construction of nari to kokadi road, length = 2.05 km i/c. culverts at dist. dhamtari(dhamtari dn.)
construction work of road rj-12-08/ml/np/ ba295.00 /2026-27
construction of high level bridge i/c approaches across surhi river on mohgaon - budhwara road.
strengthening of sanghvi approach road (total length 3.70 km)
widening and strengthening work on the singahi-naurangabad road.
strengthening of bamnora tigdda to ramchayri road length - 5.80 km pac - 345.83 lakhs (ii call)
l043-t-01 to moayimti 2nd call
road work- package no rj-01/kekri/ba 2026-27/point no 296.92/30 crore/07
construction of road - package no rj-01/kekri/ ba 2026-27 /point no 296.92/30 crore /07
construction of atal pragati path under package no. rj-20-01/atal path/nwg/2026-27
construction of atal pragati path under pkg no. rj-20-01/atal path/nwg/2026-27 - as per nit
construction of the juhana connecting road from the etawah-gwalior road - road work construction
construction of a road along the canal in kota district, from keshopura to sanmanpura kakad.