FILTERS
construction work of 2x4m span box culvert to replace the damaged culvert located at the mati-kalli paschim road km.1 in lucknow district.
View Insights
construction of rcc culvert/hpc on kunfer nallah to sarthi road in km 1st and 2nd (under ndma) - boq
1. construction of a 4-cell box culvert (3x3m span), approach roads, and additional approach roads near anil gond's field on the nevada gopalpur to mau main road in mau district. 2. construction of a new 3-cell box culvert (3x3m span) at km 1.160 of the sikdikol link road in mau district. 3. construction of a minor bridge (3-cell, 2x2m span) at km 1 of the bela kasaila to tesupar link road in mau district. (hindi document)
construction work of 2x4m span box culvert on mahdoiya to gadiyankheda road in lucknow district.
corrigendum : urgent reconstruction of broken down boundary wall along with drain and entry gate of nursing training school attached to m.j.n. medical college and hospital_sl. 2 - urgent reconstruction of broken down boundary wall along with drain and entry gate of nursing training school attached to m.j.n. medical college and hospital under cooch behar division p.w.d. during the year 2026-27.
1. construction of a minor bridge over the chhijarsi drain on the chhijarsi-partapur road in hapur district. 2. construction of a 3-cell box culvert (5m x 5m) and approach road over the chhoiya nala at km 2 of the girdharpur-tumrail-nan (other district road) route, branching off from the mb road in hapur district. (hindi document)
construction work of 1x6x3 m rcc box culvert and approach road to replace the existing hume pipe at km 13 of the pehar husainabad gaddadipur jhandenagar
restoration of damage on nurpur sanjhi nallah lahru tunnuhatti road km 15/390 to 25/00 (under pdna - c/o r/wall, b/wall in pcc and wire crate and side drain, p/l m/t at rd 15/390 to 16/600).
corrigendum : re-construction work of 3x3 meter (4 cells) box culvert on anupshahar branch near harnot on hardoi seva patri road in aligarh district
corrigendum : construction work of 4x3x34 m rcc box culvert in lieu of damaged bridge from km 2 of chandauli dharauli marg to km 1 of paitua marg in janpad chandauli.
corrigendum : re-construction work of 3x3 meter (4 cells) box culvert on anupshahar branch on kalyanpur link road in aligarh district
corrigendum : re-construction work of rcc box culvert of 3x3m, 3 spans, in lieu of the damaged and narrow bridge at km-10 of gabhana kalua pohina jawan (odr) in aligarh district.
construction of a box culvert 3 x 3 x 3 meter span at the 1st kilometer of the maghi murghahwa connecting road in kushinagar district.
construction of a new rcc minor protective structure 3x5x3 span over the drain and a new approach road on the narayanchak link road in ayodhya amethi district
construction of a new rcc minor protective structure (3x5x3 span) over the drain and a new approach road on the narayanchak link road in amethi district
corrigendum : re-construction work of 3x3m 3 span rcc box culvert in place of damaged and narrow bridge at km-4 from ctk to sumera dariyapur in aligarh district
construction of a minor bridge (box culvert 2x3x3) to replace a damaged culvert at km 8 of the gursarai-kotra road (odr) in jhansi district.
construction of 456 boys hostel vertical extension of girls hostel for 2 floors common amenities center type iii quarters 22 nos type iv 48 nos 300 seater semi permanent dinning block indoor sports complex building and development works ad bulk services like moorum gravel filling internal roads footpaths pathways paved areas cross drainage works strom water drains external water supply line ug sump steert lighiting precast compound wall for girls hostel open and covered car parking for nit puducherry at karaikal including development of proposed open sports infrastrcture facility sh construction of firefighiting ug sump and pump room for indoor sports complex plumbing works ar block 7 residential unit plumbing work for the cricket ground balance work subwork/packages: construction of fire fighiting ug sump and pump room for indoor sports complex plumbing works at block 7 residential unit plumbing work for the cricket ground balance work
1. reconstruction of an rcc box culvert and approach road to replace the damaged, narrow, and skewed arch culvert situated at km 1 of the bhandainagla bhandai road in agra district. 2. construction of a 3x7m minor bridge (box culvert) and approach road over the utangan river at km 3 of the danda kulhada road (part of the catk road) in agra district. (hindi document)
construction of a 2-cell 4x4 box culvert over the seasonal drain located on the khevrajpur link road (via ruhera) from sph km 14 (sikandra). (hindi document)
corrigendum : construction work of 3x3x3 m rcc box culvert in place of damaged bridge at km 1 of negura masouni gorari bhatroul marg, from km 2 of chandauli chakia marg to negura tiyara, in janpad chandauli.
1. construction of a minor bridge near the nathu baba shrine on the road from gram panchayat maholi to gulalpur manjha in ayodhya district. 2. construction of a bridge over the sharda sahayak canal on the route connecting kanta chauraha to devarakot, kareru, dakshinpara, and sarangapur in ayodhya district. 3. construction of a minor bridge (box culvert with 3x8x4m span) and approach roads over the sharda sahayak canal near virshahpur (at the 3rd km mark) on the bandanpur-amsin road in ayodhya district. 4. construction of an rcc culvert (1x6.00m span) over the pausara distributary near manapara on the gosaiganj-dilasiganj road in ayodhya district. 5. construction of an rcc bridge (1x5x3.50m span) along with approach roads and an additional approach road over the abanpur canal distributary (near dabhasemar canal) in karpuri thakur ward, masodha development block, ayodhya district (opposite subhash chandra shukla's field). (hindi document)
construction of 2 cell box culvert of 3x3 meter at chhamusthan to ghirau tola sheetalpur link road km 2 in district gorakhpur in fy 2026-27 lot (5/6)
corrigendum : construction of an rcc minor bridge with a 3x4 meter span over the drain at the 2nd kilometer of the chhitu-hathigan-bargohana kala road in prayagraj district.
construction of 3x3 span rcc box culvert, approach road protection work, and diversion at harivanspur and ballipur damaged bridge.
construction of 12 m span rcc culvert at km 2 of patal ganga to ganai-molta motor road for construction of 10 km road from patal ganga to ganai-molta, including 2 bridges at km 5 (40m and 30m spans) and 2 bridges at km 8 (25m and 20m spans), under the state plan.
corrigendum : construction of box culvert, approach road, and additional approach road at the drain in the middle of gram sabha porai, district jaunpur.
corrigendum : construction work of 3x3m 3 cell box culvert in place of damaged slab culvert at km-2 of nh-91 nagariya to chaumuhan kandauli road in aligarh district
reconstruction of a 3x3m span rcc box culvert to replace the damaged, narrow arch culvert at the 1st kilometer of the darkan nagariya road (via sabhapur road).
reconstruction of a 3x3 meter span rcc box culvert in lieu of the damaged narrow arch culvert at kilometer 1 of darkan nagariya road starting from sabhapur road in aligarh district.
1. construction of a minor bridge over the kudarvan drain, located at the 3rd km of the rampur road (off the mathura-bharatpur road) in mathura district. 2. construction of a new minor bridge (3x7.10 m span) over the ral drain, located at the 6th km of the arhera-bajna-wati road (off nh-19) in mathura district. 3. construction of a minor bridge over the kosi distributary, located at the 6th km (chainage 5.500) of the chhata-barsana road in mathura district. 4. construction of a new minor bridge (3x7.10 m span) over the mathura escape on the ganeshra-bajna-fenchari route in mathura district. (hindi document)
1. construction of a 2-cell box culvert (3m x 3m span) on the ibrahim minor, located at km 11 of the tiwari-pur ram padarth shukla to saraychandi road (other district road). 2. construction of a 2-cell box culvert (3m x 3m span) on the ibrahimpur minor, located at km 4 of the bagai road (other district road) passing through patulki, kanehati, dailapur, girdharpur, jhajhari, and babuganj. 3. construction of a 2-cell box culvert (3m x 3m span) on the tardih minor along the bagai road (other district road) passing through patulki, kanehati, dailapur, girdharpur, jhajhari, and babuganj. 4. construction of an rcc minor bridge (2-cell, 3m x 3m span) on the paigambarpur connecting road.
construction of a 3cell rcc box culvert with 3x3m spans over the drain to replace the damaged culvert on the saraymanga ambedkar village link road in sultanpur district
corrigendum : construction of box culvert, approach road, and additional approach road at the drain near gram sabha lapri prasad s purva, district jaunpur.
construction of a 3-cell rcc box culvert with 3x3m spans over the drain to replace the damaged culvert on the mishrapur connecting road in sultanpur district
1. construction of a 3-cell rcc box culvert (3x3 m span) over a local drain at km 1 of the bhadaiya railway feeder connecting road in sultanpur district. 2. construction of a 3-cell rcc box culvert (3x3 m span) over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district. 3. construction of a 3-cell rcc box culvert (3x3 m span) over a drain to replace a damaged culvert on the mishrapur connecting road in sultanpur district. 4. construction of a 3-cell rcc box culvert (3x3 m span) over a drain to replace a damaged culvert on the saraymanga ambedkar gram connecting road in sultanpur district. 5. construction of a 3-cell rcc box culvert (3x3 m span) over a drain at chainage km 14.30 of the chanda-dhopap-shahgarh major district road (mdr) to replace a previously constructed damaged bridge.
construction of a 3-cell rcc box culvert with 3x3m spans over the local drain at the 1st kilometer of the bhadaiya railway feeder connecting road in sultanpur district.
construction of an rcc box culvert with three cells 3m x 3m span over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district
corrigendum : construction of rcc box culvert of 3m x 3m span and approach road at km 9 of gahila baba marg, via narkati, from amdaha in janpad chandauli.
construction of a new 3x3x3 meter span rcc box culvert to replace the narrow and damaged bridge located at the 2nd kilometer of the mohanwa connecting road in district.
corrigendum : construction work of box culvert of 2 x 4 x 4 meter span on the road from tadvariya somogar mehdupar road to siktaur mafi road km 1 in sant kabir nagar district.
deposit museum and zoo department sump and over head water tank near zoo hospital-maintenance of sumps and overhead water tank civil work
construction of a type (two sections) school building (g 2), 4 nos. type-ii qtrs. (g 1), 4 nos. type-iii qtrs. (g 1), 01 no. type-v qtr., canteen, electrical substation, pump room, underground sump, boundary walls along with gates and guard room including internal water supply, sanitary installation, drainage, internal road, pathways, internal electrical installation, networking, substation equipment and power distribution and fire fighting system etc complete for kendriya vidyalaya at gumla (jharkhand). (sh: providing of fire fighting services) subwork/packages: providing of fire fighting services
construction of a type (two sections) school building (g 2), 4 nos. type-ii qtrs. (g 1), 4 nos. type-iii qtrs, (g 1), 01 no. type-v qtr., canteen, electrical substation, pump room, underground sump, boundary walls along with gates and guard room including internal water supply, sanitary installation, drainage, internal road, pathways, internal electrical installation, networking, substation equipment and power distribution and fire fighting system etc. complete for kendriya vidyalaya at koderma (jharkhand) (sh: providing of fire fighting services) subwork/packages: providing of fire fighting services
corrigendum : construction of brick masonary side drain from rd 11.20 to 11.90 both sides (1400 mtr) on faizabad seehma kanina road km 0 to 28.84 (mdr-127) road in mohindergarh distt (road id 2596)(ateli constituency) (w.p. 2026-27) (g-1) (rs. 51.09 lakh)
corrigendum : construction of 2x4x4 meter span culvert and approach road at biharojpur on uttar gaon biharojpur drain in gram sabha sultanpur.
construction of a 3-meter span double-cell rcc box culvert on the bachcha baba ashram to dhamna kachhar route - construction of rcc box culvert
construction of an rcc box culvert on the bicycle highway route leading from the agra side towards the etawah lion safari - construction work of rcc box culvert
construction of a new 2x3x3 meter span rcc box culvert to replace the narrow and damaged bridge located at the 2nd kilometer of the khadsepur connecting road.
construction of rcc culvert /hpc in km 2nd , r/wall, b/wall and pucca drain on halla to hurrandhar road under ndma - boq