FILTERS
c/o new civil hospital at dharampur in tehsil dharampur distt. mandi (100 bedded hospital) - c/o balance work i.e building portion, w.s, s.i and rain water harvesting
View Insights
1. construction of a minor bridge at km 05 of the hansari-baidora road (other district road) in jhansi district. 2. construction of a minor bridge at km 03 of the kharka link road (rural road) in jhansi district. 3. construction of a minor bridge (box culvert 2x3x3) to replace a damaged culvert at km 08 of the gursarai-kotra road (other district road) in jhansi district. (hindi document)
improvement to sh 81 to aagashi vatar nala wagholi nirmal vasai papadi umela naigoan juchandra bapane road sh 83 km 6/100 to 7/500 tal vasai dist palghar (construction of rcc gutter, stbt road).
construction of an rcc box culvert with a 5 x 6.00 m span (height 4.00 m) to replace the causeway bridge at km 118 of the sisaiya-dhaurahara-nighasan-palia-dhanauraghat-puranpur road (state highway no. 101) in lakhimpur kheri district. construction of a minor bridge with a 2 x 5 x 3 m span to replace the damaged bridge at km 77 of the sitapur-gola-aliganj-bijua road (state highway no. 135).
construction of approach road including culverts to 40 nos. gad quarters at gariyaband, dist. gariyaband (gariyaband dn.
construction of nari to kokadi road, length = 2.05 km i/c. culverts at dist. dhamtari(dhamtari dn.)
from km 18 of kampil bahawalpur gaurkheda odr to chaudera link road, box culvert, additional approach road - as per boq
construction of slab culvert on borisaray to ramjipura road km 1/2 strengthening of patajan sirlya road length 1.31 kmranhai to jamnya sarari road length 3.56 padlya khorada road length 2.00 k.m.
construction of 2x5.00 meter box cell culvert between dhoomgar road and tehra (second settlement) in distt. shahjahanpur. (fin year 2026-27)
const. rcc and brick drain septic tank approach rd to lok sewa bhawan const. of boundary wall toilet block security booth etc. and demolishing and dismantling of front part of block b incl. repairing and reconst. work at janata bhawan complex ghy-6
construction of fm relay station establishment at vizianagaram, andhra pradesh including, internal water supply, sanitary installations, drainage, internal electrical installations, ceiling / exhaust fans, fire fighting system with down comer and hose reel arrangement, manual fire alarm system, cctv and alighted equipments, lan networking system, ups system and horticulture works etc. subwork/packages: construction of fm relay station establishment at vizianagaram, andhra pradesh including internal water supply, sanitary installations, drainage, internal electrical installations, ceiling / exhaust fans, fire fighting system with down comer and hose reel arrangement, manual fire alarm system, cctv and alighted equipment, lan networking system, ups system and horticulture works etc.
05 no. work (i) const of rc... - 05 no. work (i) const of rcc side drain and laying of 80mm ipb on old nh-71 a in jassia from 16.700 to 17.300 (both side) (id-10281) (ii) constr. of retaining wall on ladhout to kiloi shiv mandir from 2.0 to 2.100 and 2.180 to 2.780 (id-1855) (iii) s
construction of 150 bedded hospital for esic at kalol, gandhinagar, gujarat. sh: planing, designing and construction of buildnigs including internal water supply, sanitary installation and drainage, development work like ug sumps terrace water tanks, water treatment plant, sewage treatment plant, effluent treatment plant, rain water harvesting, internal roads, pathways, parking facilities, filttered and unfilleted water supply lines, strom water drains, external sewage system, services tranches, landscaping horticulture works, internal electrical installations, fire alarm system, firefighting system, lifts, sub-stations, dg sets, ups, hvac system, solar water heating system, cctv, ot, lan, ip based epbax, system, mechanised car parking system etc and their integration, making fit for occupation, all complete on engineering, procurement and construction basis (epc). sh: providing and installing customized factory made furniture at esic kalol, gandhinagar (gujarat)
construction of evm warehouse kottayam-composite work - construction of rcc framed structure building including the sanitary installations and plumbing fittings/accessories, fire fighting, underground sump with pump house and electrification etc..
construction of slab drain on nimgul pathare malpur suray kharde bk. methi shindkheda varpade road sh-472 km.36/300, 36/800, 36/900, 37/700, 37/850 and 38/400 tal.shindkheda dist.dhule (part- bhadne village to railway station)
corrigendum : construction of krishna nagar drain from ecr (at transformer near more super market) to canal street at krishna nagar 1st cross extension in krishna nagar, puducherry.
construction of 50 bedded new residential hostel (female) building and furnishing work, including water supply, sanitary fittings, septic tank, rainwater harvesting, landscaping, and electrification work at diet college, achhoti, district durg, chhattisgarh (deposit work) (deposit work - without escalation and bonus)
construction of khairjudi to dhumabhatha road, length 2.60 k.m.(actual length 2.40 km) including culverts at block basna, district mahasamund( mahasamund dn.).
construction/ repair of lane, drain, iron grating, blacktopping and other allied works in all 13 wards at mc billawar. (under capex budget 2026-27) - please refers to boq
road construction including culvert and retaining wall construction works from undi talai via dangphala to bujhda adivasi shamshan ghat (tad fund)
construction work of a 3x6 meter span rcc box culvert on fajihatwa nala, between chawartal and trilokpur, in janpad siddharthnagar.
construction of a box culvert (4x6.00m span and 4.00m height) along with protective works, an approach road, and an additional approach road, extending from lbb (meernagar) via nagwa nala to chunauti village. construction of a minor bridge and associated protective works over the sharda canal at km 10 of the thana naharmurtazapavai link road. construction of a 1x6m span rcc box culvert to replace the damaged culvert at km 15 of the safipurmiyanganj road. construction of a 22m span (4x5.50m) rcc box culvert over the asivan branch of the sharda canal at km 3 of the surauli link road. construction of a 1x5.50m rcc box culvert at km 1 of the lbbsiddhnath basti link road. construction of a 5x4m rcc box culvert over the sharda canal on the bua roadmakhadumpurgopalpur route in unnao district.
construction of approach road and additional approach road with box culvert (4x6 mtrs span, 4 mtrs height) between meernagar to chunauti via nagawa nala.
construction of 2x16 m span well foundation minor culvert and approach road at kaptanganj-siswa-nichlaul-thuthibari-nautanwa road mdr in km 69, mahaw nala in place of old setu, lot no. 2 of 2.
construction of road, culvert, building, road safety work.
development of road from mudagal-kudatini (sh-29) killarahatti to gunda road border ch 0.00km to ch 1.70km and construction of box culvert at ch 0.40km in kushatgi taluk koppal dist
construction of a minor bridge at km 13 of the ranipurwa link road (taking off from km 20 of the nds road). (dhaurahara assembly constituency) construction of a minor bridge at km 1 of the kanchanpur link road (taking off from km 25 of the nds road). (dhaurahara assembly constituency) construction of a minor bridge (comprising three spans of 3.00m x 3.00m) to replace the damaged arch culvert located at km 1 of the panchampurwa link road. (dhaurahara assembly constituency) construction of a minor bridge at km 2 of the motebaba link road. (nighasan assembly constituency) construction of a minor bridge (a 7-cell box culvert with 4.00m x 4.00m spans) between the sharda canal bank and the matehi link road. (lakhimpur assembly constituency)
construction of box culvert.
construction of chhattisgarh institute of technology (cgit) building i/c water supply, sanitary fittings, septic tank, sump well, bore well, rain water harvesting & electrification work at durg, distt.- durg (c.g.)
construction of a 1x6 m span r.c.c. box culvert, approach road and additional approach road on tadiyawan road km-7 to mampur bhaisari road km-2 to bharav road in district hardoi.
construction of 5x5 meter reinforced cement concrete (rcc) box culvert at chatiya bhaisaha panagahali nala, including approach road and additional approach road.
construction of mahasamund - bhalesar-kanekera -mahadevghat road length 1.40 k.m. i/c. culverts at distt. mahasamund(mahasamund dn.).
construction of internal cement concrete road and drain at village bharaswada, taluka loha, district nanded (under rehabilitation)
b.t. renewal and cement concrete (cc) work, including drain construction, of jora internal road, length 5.57 km (actual length 2.40 km), at raipur. district: raipur (dn. no. 1, raipur).
construction of six nos type three family quarter police state vigilance and anti corruption north range at dharamshala distt. kangra h.p - sh - construction of type 3 family quarter building portion including water supply and sanitary installation, rain water harvesting system and site development
construction of the mudramau to laluapur interconnectivity road and a minor bridge (comprising an rcc culvert with a 3 x 5m span and 5m height) in hardoi district during the financial year 2026-27. construction of an rcc box culvert (4 x 3 x 3m span) on the connecting road from auhadpur road to baijana gurudwara in hardoi district during the financial year 2026-27. construction of a box culvert (2 x 3m span) and an additional approach road on the route connecting kurseli-hardaspur road to pareli-singulapur road in hardoi district during the financial year 2026-27.
construction of a box culvert (with 5m x 6m x 6m spans), a diversion, and approach roads to replace the narrow culvert situated at the 2 km mark of the anapur-moharab-khanshah ka purwa-shringverpur-shri ram chaura-mendara-sitakund-bhaira ghat route.
construction of 5x5x5 mtr rcc box culvert approach road and additional approach road on surahi nala between renwaliya to baninagr in district siddharthnagar
construction of 3x5 mtr. span reinforced cement concrete (rcc) box culvert in the middle of baliya link road at km-02, connecting baliya and shivthan approach road, along with protection works, district sitapur.
remaining work package no. rj-09-03 /np/srf/2018-19 from village alkodiya to gram panchayat gumanpura (road and culvert work)
improvement by dbm/bc, construction of drain and slab covering in dalanwala area on model colony to laxmi road and internal roads in rajpur road constituency under state sector.
link road from gref junction to mall road at killar km 0/0 to 2/500 (sh providing and laying interlocking paver block between km 0/860 to 2/410, u-shape drain at rd 1/050 to 1/180 and c/o hume pipe culvert at rd 1/200 and 1/295) under pdna 2025)
1. construction of a small bridge on the nawada to cremation ground (shamshan ghat) road in saharanpur district. 2. construction of a 1x5.5x5.0m box culvert and approach road to replace the damaged, narrow rcc culvert at km 15/1 on the satsara-bahlolpur-khanpur-titro (other district road) in saharanpur district. 3. construction of a 1x5.5x5.0m box culvert and approach road to replace the damaged, narrow rcc culvert at km 7/1 on the satsara-bahlolpur-khanpur-titro (other district road) in saharanpur district. (hindi document)
construction of 5x4 meter span rcc box culvert and additional approach on berua road to kuriyana via gotwamau at beta nala
construction of a 3x6 m span box culvert (1.60 km) approach road and additional approach road from beruijor to ajanbaba (shiv temple) over the sai river in dist-hardoi
construction of 2 cell 6x3.00 meter box culvert, protection works, approach road and additional approach road between gandhar and hismah villages in block dadraul in distt. shahjahanpur. (fin year 2026-27)
construction of a box culvert with a 655 meter span to replace the damaged culvert at km 4 of the hata-pagra-ramnagar-sohsa-tekuatar road in kushinagar district. construction of an rcc box culvert with a 354 meter span to replace the damaged culvert over doranchi nala on the pakdi link road in kushinagar district. construction of a box culvert with a 354.5 meter span to replace the previously constructed damaged minor bridge over kauasar nala at km 1 of the mehdiganj-naugawan road in kushinagar district. construction of an rcc box culvert with a 354 meter span to replace the damaged culvert over doranchi nala on the pakdi bazar tola link road in kushinagar district. construction of a box culvert with a 345.50 meter span to replace the previously constructed damaged minor bridge over betiya nala (on the hasanganj-matiyar tola link road) at km 2 of the kaptanganj-pakhariyar road in kushinagar district. construction of a box culvert with a 353 meter span to replace the previously constructed damaged minor bridge over somal tal at km 3 of the route from mandey rai-mich road via bhathhi buzurg tola ghurchhapra to bhathhi buzurg in kushinagar district.
construction of 3 x 6 meter rcc box culvert at the site of sakre bridge located on buddha nala at km-9 of telara laxmiganj (odr) in janpad siddharthnagar.
construction of a 6m x 5m x 5m span box culvert in replacement of the damaged culvert at kilometer 4 of the hata pagra ramnagar sohsa tekuatar road in kushinagar district.
from bhudiya bheda to hamirpur somvanshi, box type culvert over nala, approach road, extra approach road - as per boq