FILTERS
construction of 4 type-3 and 4 type-4 residential units at the lrp colony campus, construction of 12 transit hostel units at the lrp colony campus, construction of the boundary wall, sewer line, and drain for the lrp colony.
View Insights
c/o new civil hospital at dharampur in tehsil dharampur distt. mandi (100 bedded hospital) - c/o balance work i.e building portion, w.s, s.i and rain water harvesting
1. construction of a minor bridge at km 05 of the hansari-baidora road (other district road) in jhansi district. 2. construction of a minor bridge at km 03 of the kharka link road (rural road) in jhansi district. 3. construction of a minor bridge (box culvert 2x3x3) to replace a damaged culvert at km 08 of the gursarai-kotra road (other district road) in jhansi district. (hindi document)
construction of an rcc box culvert with a 5 x 6.00 m span (height 4.00 m) to replace the causeway bridge at km 118 of the sisaiya-dhaurahara-nighasan-palia-dhanauraghat-puranpur road (state highway no. 101) in lakhimpur kheri district. construction of a minor bridge with a 2 x 5 x 3 m span to replace the damaged bridge at km 77 of the sitapur-gola-aliganj-bijua road (state highway no. 135).
construction of approach road including culverts to 40 nos. gad quarters at gariyaband, dist. gariyaband (gariyaband dn.
construction of nari to kokadi road, length = 2.05 km i/c. culverts at dist. dhamtari(dhamtari dn.)
corrigendum : from km 18 of kampil bahawalpur gaurkheda odr to chaudera link road, box culvert, additional approach road - as per boq
construction of footpath and covering of rcc drain at hanuman mandir and shiv mandir road under sub-division-ii (section-ii) of division east road, pwd, delhi during 2026-27
corrigendum : construction of slab culvert on borisaray to ramjipura road km 1/2 strengthening of patajan sirlya road length 1.31 kmranhai to jamnya sarari road length 3.56 padlya khorada road length 2.00 k.m.
const. rcc and brick drain septic tank approach rd to lok sewa bhawan const. of boundary wall toilet block security booth etc. and demolishing and dismantling of front part of block b incl. repairing and reconst. work at janata bhawan complex ghy-6
construction of a box culvert (6x5x3.00 m span) over a local drain at km 1 of the puraina link road in lakhimpur-kheri district, including approach roads and protective works; and construction of a box culvert (5x5x3.00 m span) at km 2, including approach roads, protective works, and an additional approach road.
construction of a new 3x9x5x5 meter span rcc box culvert adjacent to the narrow bridge over the sharda sahayak canal at km 8 of the aihar-gauhanna-misa road (connecting via the amaniganj route to nh-28).
05 no. work (i) const of rc... - 05 no. work (i) const of rcc side drain and laying of 80mm ipb on old nh-71 a in jassia from 16.700 to 17.300 (both side) (id-10281) (ii) constr. of retaining wall on ladhout to kiloi shiv mandir from 2.0 to 2.100 and 2.180 to 2.780 (id-1855) (iii) s
corrigendum : construction of krishna nagar drain from ecr (at transformer near more super market) to canal street at krishna nagar 1st cross extension in krishna nagar, puducherry.
construction of 50 bedded new residential hostel (female) building and furnishing work, including water supply, sanitary fittings, septic tank, rainwater harvesting, landscaping, and electrification work at diet college, achhoti, district durg, chhattisgarh (deposit work) (deposit work - without escalation and bonus)
construction of khairjudi to dhumabhatha road, length 2.60 k.m.(actual length 2.40 km) including culverts at block basna, district mahasamund( mahasamund dn.).
construction/ repair of lane, drain, iron grating, blacktopping and other allied works in all 13 wards at mc billawar. (under capex budget 2026-27) - please refers to boq
road construction including culvert and retaining wall construction works from undi talai via dangphala to bujhda adivasi shamshan ghat (tad fund)
corrigendum : construction work of a 3x6 meter span rcc box culvert on fajihatwa nala, between chawartal and trilokpur, in janpad siddharthnagar.
corrigendum : construction of approach road and additional approach road with box culvert (4x6 mtrs span, 4 mtrs height) between meernagar to chunauti via nagawa nala.
construction of 7 cell 4.00x4.00 m span minor bridge box culvert from shardanahar patri to matehi link road at vidhan sabha dhaurahra
corrigendum : construction of 2x16 m span well foundation minor culvert and approach road at kaptanganj-siswa-nichlaul-thuthibari-nautanwa road mdr in km 69, mahaw nala in place of old setu, lot no. 2 of 2.
development of road from mudagal-kudatini (sh-29) killarahatti to gunda road border ch 0.00km to ch 1.70km and construction of box culvert at ch 0.40km in kushatgi taluk koppal dist
improvement of single lane to intermediate lane gopipur to chamukha road km 6/00 to 9.00 (sh c/o formation cutting 7/10 mtr wide retaining wall extension of hume pipe culvert providing and laying metalling and tarring u shape drain cement
construction of a minor bridge at km 13 of the ranipurwa link road (taking off from km 20 of the nds road). (dhaurahara assembly constituency) construction of a minor bridge at km 1 of the kanchanpur link road (taking off from km 25 of the nds road). (dhaurahara assembly constituency) construction of a minor bridge (comprising three spans of 3.00m x 3.00m) to replace the damaged arch culvert located at km 1 of the panchampurwa link road. (dhaurahara assembly constituency) construction of a minor bridge at km 2 of the motebaba link road. (nighasan assembly constituency) construction of a minor bridge (a 7-cell box culvert with 4.00m x 4.00m spans) between the sharda canal bank and the matehi link road. (lakhimpur assembly constituency)
construction of box culvert.
construction of chakwe to parsada road, length 2.00 k.m. including culverts at distt. raipur.(dn. no.2, raipur)..
maintenance of nh 05 kalka shimla wangtoo road from km.131/000 to 145/100, km.0/0 to 13/0 shimla bye pass - sh periodic renewal, providing and laying of hot applied theromoplastic, c/o v shape, u shape drain and providing and fixing cat eye on various rds
construction of tilaidadar to daldali road, length 1.90 k.m. i/c. culverts at block basna,dist. mahasamund( mahasamund dn.).
construction of 5x5 meter reinforced cement concrete (rcc) box culvert at chatiya bhaisaha panagahali nala, including approach road and additional approach road.
construction of tulsi bahear road, length 1.525 k.m. including culverts at district raipur (vidhansabha dn., raipur).
construction of mahasamund - bhalesar-kanekera -mahadevghat road length 1.40 k.m. i/c. culverts at distt. mahasamund(mahasamund dn.).
construction of a 4-cell (5x5m) rcc culvert over faren nala (turra drain) on the road connecting bismilha to chakrampur in gorakhpur district under state plan for financial year 2026-27, lot (3/6).
construction of interlocking concrete paver pavement with extra road from 187th km of nh-62 at gasapara bazar to lower gasspara connecting border road (l=1.610 km) under ridf-xxxi. nature of works: 1. subgrade and shoulder drain 2. gsb 3. wbm 4. paver block 5. loading, unloading and haulage
construction of 6x5x4 m span rcc box culvert to replace the damaged causeway situated on the jadera nala at km 5 of the manikpur markundi dudaila road mdr
construction of six nos type three family quarter police state vigilance and anti corruption north range at dharamshala distt. kangra h.p - sh - construction of type 3 family quarter building portion including water supply and sanitary installation, rain water harvesting system and site development
construction of a box culvert (with 5m x 6m x 6m spans), a diversion, and approach roads to replace the narrow culvert situated at the 2 km mark of the anapur-moharab-khanshah ka purwa-shringverpur-shri ram chaura-mendara-sitakund-bhaira ghat route.
corrigendum : construction of 5x5x5 mtr rcc box culvert approach road and additional approach road on surahi nala between renwaliya to baninagr in district siddharthnagar
construction of 3x5 mtr. span reinforced cement concrete (rcc) box culvert in the middle of baliya link road at km-02, connecting baliya and shivthan approach road, along with protection works, district sitapur.
remaining work package no. rj-09-03/np/srf/2018-19 from village alkodia to gram panchayat gumanpura (road and culvert work)
construction of kuchi to bohardih road, length 2.00 k.m. including culverts at district balodabazar (balodabazar dn.).
improvement by dbm/bc, construction of drain and slab covering in dalanwala area on model colony to laxmi road and internal roads in rajpur road constituency under state sector.
1. construction of a small bridge on the nawada to cremation ground (shamshan ghat) road in saharanpur district. 2. construction of a 1x5.5x5.0m box culvert and approach road to replace the damaged, narrow rcc culvert at km 15/1 on the satsara-bahlolpur-khanpur-titro (other district road) in saharanpur district. 3. construction of a 1x5.5x5.0m box culvert and approach road to replace the damaged, narrow rcc culvert at km 7/1 on the satsara-bahlolpur-khanpur-titro (other district road) in saharanpur district. (hindi document)
construction of new side dr... - construction of new side drain in both side of samalkha to jaurashi (road id-8280) in samalkha constituency in panipat district (work programme 2026-27).
corrigendum : construction of 2 cell 6x3.00 meter box culvert, protection works, approach road and additional approach road between gandhar and hismah villages in block dadraul in distt. shahjahanpur. (fin year 2026-27)
construction of a box culvert with a 655 meter span to replace the damaged culvert at km 4 of the hata-pagra-ramnagar-sohsa-tekuatar road in kushinagar district. construction of an rcc box culvert with a 354 meter span to replace the damaged culvert over doranchi nala on the pakdi link road in kushinagar district. construction of a box culvert with a 354.5 meter span to replace the previously constructed damaged minor bridge over kauasar nala at km 1 of the mehdiganj-naugawan road in kushinagar district. construction of an rcc box culvert with a 354 meter span to replace the damaged culvert over doranchi nala on the pakdi bazar tola link road in kushinagar district. construction of a box culvert with a 345.50 meter span to replace the previously constructed damaged minor bridge over betiya nala (on the hasanganj-matiyar tola link road) at km 2 of the kaptanganj-pakhariyar road in kushinagar district. construction of a box culvert with a 353 meter span to replace the previously constructed damaged minor bridge over somal tal at km 3 of the route from mandey rai-mich road via bhathhi buzurg tola ghurchhapra to bhathhi buzurg in kushinagar district.
corrigendum : construction of 3 x 6 meter rcc box culvert at the site of sakre bridge located on buddha nala at km-9 of telara laxmiganj (odr) in janpad siddharthnagar.
construction of a 6m x 5m x 5m span box culvert in replacement of the damaged culvert at kilometer 4 of the hata pagra ramnagar sohsa tekuatar road in kushinagar district.
corrigendum : from bhudiya bheda to hamirpur somvanshi, box type culvert over nala, approach road, extra approach road - as per boq
corrigendum : construction of cc road and drain work in fareednagar chandan suggamau jarhara road to pragyapuri colony via primary school in lucknow city