FILTERS
construction of a 2x5m span rcc box culvert and approach road to replace a previously constructed, damaged culvert located at the 2nd kilometer of the simthala route of the hasanpur-rahra-gawan road in amroha district.
View Insights
construction of rcc culvert/hpc on kunfer nallah to sarthi road in km 1st and 2nd (under ndma) - boq
recovery and reconstruction of rgmsj road km. 0.000 to 61.000 - sh p.l wbm g iii, 30mm thick bituminous concrete, essential drain etc. in km. 0.000 to 2.000
construction work of 3x5x4 meter rcc box culvert to replace the damaged culvert at km 02 of the badpur-hussainabad road
1. construction of a minor bridge over the chhijarsi drain on the chhijarsi-partapur road in hapur district. 2. construction of a 3-cell box culvert (5m x 5m) and approach road over the chhoiya nala at km 2 of the girdharpur-tumrail-nan (other district road) route, branching off from the mb road in hapur district. (hindi document)
1) construction of a concrete road and gutter at tuljabhavaninagar within the jurisdiction of chopda municipal council. 2) construction of a concrete road and gutter at ramkuwarnagar within the jurisdiction of chopda municipal council, taluka chopda, district.
construction work of 1x6x3 m rcc box culvert and approach road to replace the existing hume pipe at km 13 of the pehar husainabad gaddadipur jhandenagar
corrigendum : re-construction work of 3x3 meter (4 cells) box culvert on anupshahar branch near harnot on hardoi seva patri road in aligarh district
corrigendum : construction work of 4x3x34 m rcc box culvert in lieu of damaged bridge from km 2 of chandauli dharauli marg to km 1 of paitua marg in janpad chandauli.
corrigendum : re-construction work of 3x3 meter (4 cells) box culvert on anupshahar branch on kalyanpur link road in aligarh district
corrigendum : re-construction work of rcc box culvert of 3x3m, 3 spans, in lieu of the damaged and narrow bridge at km-10 of gabhana kalua pohina jawan (odr) in aligarh district.
construction of a box culvert 3 x 3 x 3 meter span at the 1st kilometer of the maghi murghahwa connecting road in kushinagar district.
construction of a new rcc minor protective structure 3x5x3 span over the drain and a new approach road on the narayanchak link road in ayodhya amethi district
corrigendum : construction work of road and drain from kapuri thakur ward mohalla subedar ka purva to dabhasemar patli pul, passing through the houses of sudarshan kori, abhishek shukla, umashankar shukla, and extending to the house of rajendra prajapati.
corrigendum : re-construction work of 3x3m 3 span rcc box culvert in place of damaged and narrow bridge at km-4 from ctk to sumera dariyapur in aligarh district
corrigendum : construction of box culvert 3x3x3.00m span approach road and protection work of sh 5a to majhiyar road in km 2 in district mirzapur - bridge work
1. reconstruction of an rcc box culvert and approach road to replace the damaged, narrow, and skewed arch culvert situated at km 1 of the bhandainagla bhandai road in agra district. 2. construction of a 3x7m minor bridge (box culvert) and approach road over the utangan river at km 3 of the danda kulhada road (part of the catk road) in agra district. (hindi document)
corrigendum : construction work of 3x3x3 m rcc box culvert in place of damaged bridge at km 1 of negura masouni gorari bhatroul marg, from km 2 of chandauli chakia marg to negura tiyara, in janpad chandauli.
macadamization of hidyal tund link road km 1st km 2nd by way of providing laying wbm grade-ii 100mm thick, grade-iii 75mm thick, 50mm thick bituminous macadam, 25mm thick premix carpet constt.of pucca drain and constt.of hume pipe (under cities a - please refer boq
construction of rcc box culvert, approach road protection work on gram ramwapur shyam sohsa parsa link road on manwar river
macadamization of workshop to zellna link road by way of providing laying wbm grade-ii 100mm thick, grade-iii 75mm thick, 50mm thick bituminous macadam, 25mm thick premix carpet, pucca drain constt. of rcc pipe 600mm dia (under cities and town (cn - please refer boq
improvement/up-gradation of lane and drain of zuberabad lane no. 2,3,4 and 5 near bn college sunjwan jammu (under capex budget 2026-27).
construction of 2 cell box culvert of 3x3 meter at chhamusthan to ghirau tola sheetalpur link road km 2 in district gorakhpur in fy 2026-27 lot (5/6)
construction of an rcc minor bridge with a 3x4 meter span over the drain at the 2nd kilometer of the chhitu-hathigan-bargohana kala road in prayagraj district.
construction of 3x3 span rcc box culvert, approach road protection work, and diversion at harivanspur and ballipur damaged bridge.
construction of 12 m span rcc culvert at km 2 of patal ganga to ganai-molta motor road for construction of 10 km road from patal ganga to ganai-molta, including 2 bridges at km 5 (40m and 30m spans) and 2 bridges at km 8 (25m and 20m spans), under the state plan.
construction of a 3x4x4 meter box culvert and approach road on the govindpur-nihalpur connecting road in ghazipur district. construction of a minor bridge to replace the damaged skewed culvert at km 11 (jhotari) on the alawalpur-baresar-tirahipur road (other district road) in ghazipur district.
construction of a 3x4x4 meter box culvert and approach road on the connecting route between gobindpur and nihalpur in district ghazipur
construction of box culvert, approach road, and additional approach road at the drain in the middle of gram sabha porai, district jaunpur.
corrigendum : construction work of 3x3m 3 cell box culvert in place of damaged slab culvert at km-2 of nh-91 nagariya to chaumuhan kandauli road in aligarh district
reconstruction of a 3x3m span rcc box culvert to replace the damaged, narrow arch culvert at the 1st kilometer of the darkan nagariya road (via sabhapur road).
reconstruction of a 3x3 meter span rcc box culvert in lieu of the damaged narrow arch culvert at kilometer 1 of darkan nagariya road starting from sabhapur road in aligarh district.
1. construction of a minor bridge over the kudarvan drain, located at the 3rd km of the rampur road (off the mathura-bharatpur road) in mathura district. 2. construction of a new minor bridge (3x7.10 m span) over the ral drain, located at the 6th km of the arhera-bajna-wati road (off nh-19) in mathura district. 3. construction of a minor bridge over the kosi distributary, located at the 6th km (chainage 5.500) of the chhata-barsana road in mathura district. 4. construction of a new minor bridge (3x7.10 m span) over the mathura escape on the ganeshra-bajna-fenchari route in mathura district. (hindi document)
construction of a 3cell rcc box culvert with 3x3m spans over the drain to replace the damaged culvert on the saraymanga ambedkar village link road in sultanpur district
construction of box culvert, approach road, and additional approach road at the drain near gram sabha lapri prasad s purva, district jaunpur.
construction of a 3-cell rcc box culvert with 3x3m spans over the drain to replace the damaged culvert on the mishrapur connecting road in sultanpur district
1. construction of a 3-cell rcc box culvert (3x3 m span) over a local drain at km 1 of the bhadaiya railway feeder connecting road in sultanpur district. 2. construction of a 3-cell rcc box culvert (3x3 m span) over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district. 3. construction of a 3-cell rcc box culvert (3x3 m span) over a drain to replace a damaged culvert on the mishrapur connecting road in sultanpur district. 4. construction of a 3-cell rcc box culvert (3x3 m span) over a drain to replace a damaged culvert on the saraymanga ambedkar gram connecting road in sultanpur district. 5. construction of a 3-cell rcc box culvert (3x3 m span) over a drain at chainage km 14.30 of the chanda-dhopap-shahgarh major district road (mdr) to replace a previously constructed damaged bridge.
construction of a 3-cell rcc box culvert with 3x3m spans over the local drain at the 1st kilometer of the bhadaiya railway feeder connecting road in sultanpur district.
construction of an rcc box culvert with three cells 3m x 3m span over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district
1. construction of an rcc box culvert (3m x 3m x 3m span) and approach road at the 9th km of the amdahanarkatigahila baba route in chandauli district. 2. construction of a culvert (3m x 5m x 4m span) on the road leading from the 9th km of the majhgai-tiwaripur route to the shankar ji temple in the old settlement of jaymohni, chandauli district. 3. construction of a minor bridge over the chandraprabha river opposite indrapurva village within the kharid gram sabha area of chandauli district. (hindi document)
corrigendum : construction of rcc box culvert of 3m x 3m span and approach road at km 9 of gahila baba marg, via narkati, from amdaha in janpad chandauli.
construction of an rcc box culvert (minor bridge) over the nakha nala between turkoli and dhuswa in gonda district; and construction of a 5x3m rcc box culvert over the narwa nala in khadauwa gram panchayat, gonda district, replacing a previously built, narrow, and damaged arch culvert.
construction of rcc box culvert, approach road and protection work on gram tukauli and dhusawa
1) construction of a concrete road from padma trading company to ganapati temple to rajendra shinde house within the jurisdiction of chopda municipal council. 2) construction of a concrete road and drainage within gat. no. 1615 near mscb at omnagar.
corrigendum : construction of brick masonary side drain from rd 11.20 to 11.90 both sides (1400 mtr) on faizabad seehma kanina road km 0 to 28.84 (mdr-127) road in mohindergarh distt (road id 2596)(ateli constituency) (w.p. 2026-27) (g-1) (rs. 51.09 lakh)
construction of 2x4x4 meter span culvert and approach road at biharojpur on uttar gaon biharojpur drain in gram sabha sultanpur.
construction of a 3-meter span double-cell rcc box culvert on the bachcha baba ashram to dhamna kachhar route - construction of rcc box culvert
construction of an rcc box culvert on the bicycle highway route leading from the agra side towards the etawah lion safari - construction work of rcc box culvert
construction of a new 2x3x3 meter span rcc box culvert to replace the narrow and damaged bridge located at the 2nd kilometer of the khadsepur connecting road.
construction of rcc culvert /hpc in km 2nd , r/wall, b/wall and pucca drain on halla to hurrandhar road under ndma - boq