FILTERS
providing consultancy services including survey, detailed investigations, study, soil testing, structural design, estimation, preparation of detailed project report getting it vetted from diqc nit iit for 16 no of missing bridges piu doda
View Insights
engagement of consultant for providing consultancy services including survey, detailed investigations, study, soil testing, structural design, estimation, preparation of detailed project report and getting it vetted for division kishtwar and marwah
wbpwdroadseebnhdniq18/26-27-2 - consultancy services for detailed health check up with suggestive recommendations and preparation of estimate for repair and rehabilitation work of kumud setu over river kunoor located at 10th km of kashemnagar-natunhat-srikhanda road (mdr)..........
wbpwdroadseebnhdniq18/26-27-1 - consultancy services for detailed health check up with suggestive recommendations and preparation of estimate for repair and rehabilitation work of lochan das setu over river ajoy located at 123rd km of ramjibanpur-palita-palitpur-natunhat rd(sh-7)..
wbpwrd/ee/bhd/niq-03/26-27/01 - preparation of detailed project report for khatra ranibandh road, from 0.000 kmp to 7.400 km sh-4 widening an strengthening excluding kechendaghat bridge portation and strengthening from 7.400 km to 15.300 km mdr in the district of bankura
corrigendum : wbpwrd/ee/bhd/niq-03/26-27/02 - preparation of detailed project report for bishnupur sonamukhi rangamati road from ch 8.00 km to ch 28.00 km, widening and strengthening work under bankura highway division in the district of bankura.
feasibility study and preparation of detailed project report for one time improvement (oti) work for left out bypassed section at raniganj town portion from ch 275.20 km to ch. 280.700 km (punjabi more) of nh-14(erstwhile nh-60) under nh division -ii
construction and design of new bachatgat stall on cidco side parking of konakan bhavan administrative building at cbd belapur navi mumbai
engagement of consultant for providing consultancy services including preparation of dpr for construction of 04 nos of bridges
selection of an architect for the preparation of plans, designs, and estimates for the construction of a new circuit house within the rest house complex in durg district. (hindi document)
consultancy services for detailed health check up with suggestive recommendations and preparation of estimate for repair and rehabilitation work of lochan das setu over river ajoy located at 123rd km of ramjibanpur-palita-palitpur-natunhat road (sh-7) under burdwan north highway division, p.w. (roads) directorate in the district of purba bardhaman during the year 2026-27. (2nd call) and 1 (one) no. other work 2) consultancy services for detailed health check up with suggestive recommendations and preparation of estimate for repair and rehabilitation work of kumud setu over river kunoor located at 10th km of kashemnagar-natunhatsrikhanda road (mdr) under burdwan north highway division, p.w. (roads) directorate in the district of purba bardhaman during the year 2026-2
structural evaluation, widening and strengthening of flexible road pavements using falling weight deflectometer (fwd), technique for preparation of detailed project report of kashemnagar-natunhat-srikhanda road (mdr) from 0.00 km to 28.50 km, widening and strengthening work except paver zone ch. from 10.140 kmp to 10.910 kmp (770m) under bhatar highway sub-division no.-i of burdwan north highway division in the dist of purba bardhaman during the year 2026-27. 2) structural evaluation, widening and strengthening of flexible road pavements using falling weight deflectometer (fwd), technique for preparation of detailed project report of ramjibanpur-ketugram-katwa (rkk) road (sh-6) from 76.00 km to 102.00 km, widening and strengthening work under ramjibanpur highway sub-division of burdwan north highway division in the dist of purba bardhaman during the year 2026-27.
wb/pwr/ee/bhdii/niq14/26-27/2 - traffic survey, details soil investigation, topographical survey, pavement condition survey (fwd) preparation of detailed project report (dpr) for strengthening of kirnahar ramghati road from 0.00 to 4.50 km, under birbhum highway division no-ii, i
wb/pwr/ee/bhdii/niq14/26-27/1 - traffic survey, details soil investigation, topographical survey, pavement condition survey(fwd) preparation of detailed project report (dpr) for strengthening of rajnagar-khoirasole road from 0.00 to 19.80 km, under birbhum highway division no-ii,
conversion of sp shed to rgular staff quarters (1 no type-v, 2 nos type-iii and 11 nos type-ii quarters) at jnv hassan, karnataka. sh : preparation of structral analysis, design and detailing.
construction of training hall and hostel (g plus 2) building for coconut development board at dsp farm, mandya, karnataka sh : preparation of structural analysis, design and detailing.
preparation of drawings and detailed project report dpr for fire protection system at diamond harbour government medical college and hospital diamond harbour south 24 parganas during the year 2026 27
traffic survey, details soil investigation, topographical survey, pavement condition survey (fwd) preparation of detailed project report (dpr) for strengthening of kirnahar ramghati road from 0.00 to 4.50 km, under birbhum highway division no-ii, in the district of birbhum in the year 2026-2027.
traffic survey, details soil investigation, topographical survey, pavement condition survey(fwd) preparation of detailed project report (dpr) for strengthening of rajnagar-khoirasole road from 0.00 to 19.80 km, under birbhum highway division no-ii, in the district of birbhum in the year 2026-2027.
invites bids for 6 bridge upgradation and design works (phase 1) under the state sector bridge program (adb funded): 1. upgradation of a bridge from single lane to two lane on silkyara bangawn chapda sarot motor road at km 76, chainage 75.400 in chinyalisaur block, uttarkashi district (as per rfq and tor); 2. upgradation work of a 15-meter rcc bridge from one lane to two lane at km 26 of badethi-banchaura-bardigaad state highway (sh-16) at chinyalisaur, district uttarkashi (as per rfq and tor); 3. upgradation of a bridge from single lane to two lane on silkyara bangawn chapda sarot motor road at km 67, chainage 66.600 in chinyalisaur block, uttarkashi district (as per rfq and tor); 4. upgradation of a bridge from single lane to two lane on silkyara bangawn chapda sarot motor road at km 65, chainage 64.650 in chinyalisaur block, uttarkashi district (as per rfq and tor); 5. upgradation of a bridge from single lane to two lane on silkyara bangawn chapda sarot motor road at km 65, chainage 64.100 in chinyalisaur block (as per rfq and tor); and 6. upgradation of a bridge from single lane to two lane on silkyara bangawn chapda sarot motor road at km 47, chainage 46.750 in chinyalisaur block, uttarkashi district (as per rfq and tor). (hindi document)