Find the latest sensor tenders in south central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of temperature sensor with accessories for oil circuit transformer as per clw specification no.clw/es/3/0033,alt-h. consisting of 5 items as per attached annexure. [ warranty period: 30 mon ths after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] diesel stores depot/mly, - temperature sensor with accessories for oil circuit transformer as per clw specification no.clw/es/3/0033,alt-h. consisting of 5 items as per attached annexure.
View Insights
supply of supply and installation of measuring & recording instrument (mri): ai (artificial int elligence) based mri as per the rdso specification number ti/spc/ohe/mri/0143. [ warranty period: 24 months after the date of delivery ] ]
supply of speed sensor g16 for knorr bremse make wsp system of lhb coaches to m/s knorr bremse part no. stn31450/205a18u with adpater to kbi part no. c188609 & c189772, qty 01 no. each conforming to rdso specification no. rdso/2011/cg-04 rev-04. [ warranty period: 36 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of pressure sensor with accessories for oil circuit transformer as per clw specification no.cl w/es/ 3/0035, alt-h consisting of 4 items as per attached annexure. [ warranty period: 30 months afte r the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted : max 8 lacs ] ] diesel stores depot/mly, scr - pressure sensor with accessories for oil circuit transformer as per clw specification no.clw/es/ 3/0035, alt-h consisting of 4 items as per attached annexure.
supply of supply of led based stencil type & multi lamp route indicator. (the item wise and quantity details are att ached in annexure-i) [ warranty period: 12 months after the date of delivery ] ] - supply of led based stencil type & multi lamp route indicator. (the item wise and quantity details are attached in annexure-i)