Find the latest slings tenders in south central railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of polyester webbing sling, eye loop at both ends of capacity 03 tons x 03 mtrs. length as per is: bs 3481 part. ii(1983). note: 1) load test certificate for the polyester webbing slings are required to be obtained from valid govt . approved/ nabl accredited labs must be submitted along with the supply of the material, otherwise material is liable f or rejection. 2) one sample should be got approved before effecting bulk supply. [ warranty period: 30 months after t he date of delivery ] ]
View Insights
supply of hydraulic track jack 15 toncapacity (non infringing type) as per rdsospecification no. tm/s m/31 dt.08.05.1996 (secondrevision, july 2022). make: riddhi siddhienterprises or similar. [ warrant y period: 12 months after the date of delivery ] ] - hydraulic track jack 15 ton capacity
supply of supply the set of spares to suit 5 ton godrej fork lift truck model no: gx ? 500 d (sb). detaile d description with part numbers and quantity per set are enclosed as annexure a. (one set consist of 04 ite ms). [ warranty period: 30 months after the date of delivery ] ] - supply the set of spares
supply of electric power pack and hydraulic jack for traction rod bush assembly as per attached specifi cation [ warranty period: 30 months after the date of delivery ] ] - electric power pack and hydraulic jack
supply of set of items suitable for ace forklift to model no: af30d as detailed: 1) lower c olumn steering unit to ace part no. 180304020000,qty/set: 01 no,2) lower column to ace part no. 180304020100,qty/set: 1 no. 3)orbitrol unit, bzzi-e100 to ace part no. 180304010000,q ty/set: 1 no.4) shim of orbitrol to ace part no. c0e012110100,qty/set: 1 no. [ warranty period: 30 months after the date of delivery ] ] - set of items suitable for ace forklift
supply of design, supply, installation, commissioning and prove out of one set of welding fixtures an d manipulators (consist of 11 items) for manufacturing of air spring suspension lhb fiat bogie frames at rail bogie karkhana, yadgir. items should be supplied and suitable as per technical specification enclosed. [ warranty period: 24 months after the date of delivery ] ] rail bogie karkhana/yadgir, - design, supply, installation, commissioning and prove out of one set of welding