Find the latest subway tenders in south western railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
hubballi division: gadag hosapete (gdg-hpt) section: construction of limited height subway in lieu of lc no.44 at km 78/100-200 in between harlapur-somapur (rlp-soq) stations (maintenance period-04 years).
View Insights
[i] sbc-jtj section: proposed construction of rub at trespassing location at km 339/300-400 between hdih-kjm stations in aden/sbc sub-division- trd works[ii] sbc-jtj section: proposed construction of pedestrian subway at km.230/000-100 between pu-mar stations in aden/bwt sub-division [iii]recoupment of ballast at tss,sp/ssp and provision of cable trench covers in sbc-jtj section.[iv]bifurcation of elementary section at skpt station and modification of umbrella structures at ypr station. [v]provision of earthing and bonds at ssp/sp,fob and platform shelters in sbc-jtj section.[vi] kjm-augmentation of kjm shed for increasing homing capacity from 175 to 300 electric locomotives-detailed estimate. [vii]ohe modifications in connection with construction of new ac loco trip shed at ypr. [viii] ynk-bwt section: proposed an approach road on lh side in rub 85a at km 96/200-300 between cmy-svs stations [ix] ohe modifications in connection with construction of ac loco trip shed at smvb.
request for proposal for engineering, procurement & construction (epc) mode for construction of major bridges (34 nos) between hosapete (excl.) and ballari (excl.) stations, as part of ballari- hosapete 3rd & 4th line project.
rfp (request for proposal) for design and construction of major bridges (28 no's) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
spgr-ask section: proposed construction of rub in lieu of lc no. 72 at km 122/500-600 between bsn-rdi stations
closure of interlocked lc gates (traffic/engineering) at lc no.46 between tk-mlsa stations, lc no.58 at bet gbb-ntr stations no.59 nittur station yard,lc no.56 between gubbi-nittur stations lc no.86 between ttr-hvl stations, lc no.88 between tk-ask section, lc no.138 between nvf-ajp stations, lc no.35 between kiat-ndv stations, lc no.38 between kiat-tk stations, lc no.39 between kiat-tk stations and lc no.71 between mlu-cpl stations, in lieu of rob/rub work over sbc & mys division.
[i] ohe modifications in connection with replacing low ht shelter of pf 7&8, provision of shelter in open area between second entry building and platform entrance including granite flooring [ii] ohe modifications in connection with augmentation of ac loco trip shed at sbc. [iii] provision of ohe for pit line no.1 at sbc yard. [iv] conversion of tramway ohe to conventional at sbc yard [v] bid- ohe modifications in connection with provision of proposed rd-06(spur line of 686m) with shunting neck of 650m towards sbc end duly dismantling existing goods unloading platform adjacent to rd-5 [vi] ohe modification in connection with proposed extension of pf-1 and pf-2 for a length of 150 mtrs and 5 mtr width at kndv station in sbc-y section [vii] ohe modification of shifting y tss down line ptfe [viii] sbc division- ohe modifications in connection with construction of foot over bridge(fob) at km55/200 at chanapattna (cpt) yard near lc no.47 (gangway:32mx3m, staircase:2x20m) for pedestrian movement (4t crossing)
jru-kjg sec: replacement of steel girder up line bridge no.35 at ch: 303/500-600 span 3x12.20m steel girder+2x3.05m rcc slab (land arch closed) by cast-in-situ rcc box 3 nos. twin-cell rcc box (2 x 4.6m x 3.3m each)