Find the latest window tenders in south western railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of supply, fitment and replacement of aluminium window bars and windows support from windo ws in lws and nac cc coaches as per rcf cai cai/rcf/mech/lhb/104" dated 20/11/2025. scope of work a nd special conditions enclosed as annexure - a. (note :- 01 no = 01 window set). [ warranty period: 30 months after the date of delivery ] ] sse/c&w/bgm, swr
View Insights
supply of emergengy wider window for lhb scn coaches (size 1460 x 700 with sliding shut ters), as per drawing mi008130 alt b, with adhesives [ warranty period: 30 months after the date o f delivery ] ] sse/carriage furnishing - emergengy wider window for lhb scn
supply of guard chair (cushioned fixed seat with arms) to rdso drg. no. sk-75527, alt.-4, item no.-25( ref drg. no. wd-04059-s-01) mat. & spec. as per drg. [ warranty period: 30 months after the date of deli very ] ]
corrigendum : supply of louvre complete for lavatory window for ac and non ac lhb coaches to rcf drg. no. mi 007166 alt.nil [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of brushes, wire (steel) welders, 4 rows-40 mm to is:4517/86 (reviewed in 2023) sl. no. i ii table 1. three samples to be submitted along with the offer. [ warranty period: 30 months after t he date of delivery ] ] dsd-sbc, swr
supply of set of outer door assembly (lh & rh) to drg. no. icf/std-5-1-002, alt-v/nil. consisting o f 02 items. i) col-i (rh door)=02 nos. ii) col=ii (lh door)=01 no. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
supply of - chair for general purpose (q2) - | quantity - 2
supply of single piece frp louvre shutter (2 feet wide window) to drg no. rdso sk 97020, alt-8, s pecification no. rdso/2007/cg-02, (rev.1) feb'08 with amendment no.3 of feb-2019. note: colour of s hutter frame shall be apricot yellow to ral shade card no. 0708040. [ warranty period: 30 months a fter the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - single piece frp louvre shutter (2 feet wide window).
supply of set of outer door assembly (lh & rh) to drg. no. icf/std-5-1-002, alt-v/nil. consisting of 02 items. i) col-i (rh door)=02 nos. ii) col=ii (lh door)=01 no. [ warranty period: 30 months after t he date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - set of outer door assembly (lh & rh).
supply of locking bolt for flap door arrangement of boxn. boxnhs wagons including (a) 6 mm dia x 41 mm long rod (b) washer od 30 mm dia x 5 mm thick to suit locking bolt dia to drg. no. wd-90007/s-1, alt-2 2 , item no.15, specification is:2062 fe. 410 cu wa [ warranty period: 30 months after the date of deliver y ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: m ax 8 lacs ] ] - locking bolt for flap door
supply of g.i. dustbin as per icd kkf drg. no. adi/mg/2021-22/61/db/1. [ warranty period: 30 mont hs after the date of delivery ] ] sse/carriage furnishing - g.i. dustbin