Find the latest draft gears tenders in southern railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of kit for sanding equipment mainfold assembly as per ftrtipl part no. 79000612 5 and d & m part no. rk-ab-759-w404 consists of 4 items as per annexure enclosed. [ warra nty period: 30 months after the date of delivery ] ] amm/elsd/rpm, sr - kit for sanding equipment mainfold assembly
View Insights
supply of kit for panto equipment manifold as per ftrtipl pt. no. 790006135 and d and m pt. no. rk. ab 759- w 414 consisting of 6 items as per annexure attached. [ warranty period: 30 months af ter the date of delivery ] ] amm/elsd/rpm, sr - kit for panto equipment manifold
supply of aluminium extruded equal angle moulding of size 25 x 25 x 1.6mm thick x 3660mm long,with radius at root 4mm specn. is :3908-2025 or lat est. designation 63400 to is :733-2025 or latest & temper designation t6 to is :5052-2025 or latest. [ warranty period: 30 months after the date of deliver y ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - aluminium extruded and flat items.
supply of procurement of side filling complete with coupling, coupling union, strainer and washer to drg no. t-6-3-651 alt. d/55 or latest,item 1,2,3 & 4. material for item 1 & 2 as per rcf str no. mdts-203 (rev.06) or latest & material for item 3,4 as mentioned in drg. [ warranty period: 30 months after th e date of delivery ] ] - side filling complete with coupling
supply of supply of e type lock with brass ward as per rdso drg. no: sa -3376/m and key as per rds o drg. no: s 3377/m to suit rdso spec. no. irs:s-30/64 or latest alteration and amendment if any as per d rawing attached. list of quantity required as per ward numbers are attached. [ warranty period: 30 mont hs after the date of delivery ] ] - e type lock with brass ward as per rdso drawing
supply of high capacity loco side buffer assy-bg (elastomer spring type) cap 1500 kgm minimu m to rdso drg. no. sk.dl-4561 alt-2 including the following part drawings, sk.dl-4562 alt-3, sk.dl-4 563 alt-1, skdl-4564 items - 1,2,3,4,5, & 6 alt-1, l/bd-655/m alt-6, skdl-4565 alt-1 to material specifi cation no. mp 0.41.00.03 (rev-03) august 2024 [ warranty period: 30 months after the date of deliv ery ] ] amm/lssd/ed, sr - high capacity loco side buffer assy-bg (elastomer spring type) cap 1500 kgm minimum
supply of rate contract for manufacture and supply of fittings for level crossing for wider psc sleeper with 6 0 kg (uic) running rails and 52 kg check rail for 25t axle load to rdso drg no t-8671 (alt-3), specification- serial no. irs: t- 23-2021, serial no. irs: t-16-2019, serial no. irs: t-42- 2020. (the details of each set including drawing no and quantity as furnished in the annexure - 1a). [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - rate contract for manufacture and supply of fittings for level crossing for wider psc sleeper with 60 kg rdso drg no t-8671 (alt-3).
supply of components for clamp type ground connection for point machine 220mm stroke. cons ists of :- 1. clamp point lock 60kg (tws) for b.g to drg.no. rdso/s3395a- alt-ptj-2: 1 set. 2. drive rod to drg.no. rdso.s.3460 alt- ptj-3: 1 no 3. drive rod lug lh and rh to drg.no rdso.s.3461 alt-ptj-8: 1 s et 4. switch extension bracket to drg.no rdso.s.3591,alt-ptj-5: 2 nos 5. bush to drg.no rdso.s.3463 :1 no 6. insulating plate (rh) to drg.no rdso.s.3592 : 1 no 7. insulating plate (lh) to drg.no rdso.s.3 593 : 1 no 8. insulating washer to drg.no s.8640 : 8 nos 9. bush to drg.no.s23199: 4 nos 10 bolt special head with castle nut to drg.no.sa 9158 alt ptj-2 : 4 nos painting shall be done on the items where electro plating is not specified. painting all over, except on working surface, with two pri ming coats, one of zinc chrome to is:104 followed by another of red oxide - zinc chrome to is:2074 & finish coat of signal red to is:2932. supply shall be made with embossing of "s&t/ptj" in lock bar assembly, lock arm, stock rail bracket, drive lug & drive rod. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - components for clamp type ground connection for point machine 220mm stroke
supply of long life loco side buffer assly (capacity:30 kj minimum) to rdso drg. no. sk .dl- 4748 alt-2, and rdso specn. no. (1) mp-0.41.00.03 (rev. 03), august 2024 or latest [ war ranty period: 30 months after the date of delivery ] ] amm/elsd/rpm, sr - long life loco side buffer assly
supply of set of "c" runer for l.h.b ac/nac/coaches as per drg no.(i)310113.0.05.000.102 alt- r, qty:01 no.(ii) drg no. -310113.0.05.000.103 alt -r qty-01 no. [ warranty period: 30 months after the dat e of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - set of "c" runer
supply of set of external sealing for body side entrance door consisting of 3 items -(1) r ubber gasket to rcf drg. no:la52101 alt-a- quantity/set-1 .(2) gasket pivot side to alstorm lhb gmbh drg. no:3.10113.0.22.120.109(sheet 1 and 2)-quantity/set-1. (3)top gasket to rcf drg. no. la 52104-alt-a- quantity/set -1 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - set of external sealing for body side entrance door consisting of 3 items
supply of test point for lhb coaches as per faiveley part no.040209000 confirming to rdso s pec no. specn: rdso/2011/cg-04 ( rev.04 ) [ warranty period: 36 months after the date of delivery ] ] - test point for lhb coaches as per faiveley
supply of wheel iron skids. specification for wheel skid for use of indian railway bg stock as per rdso drawing no tfc/spec/374/skid dated 26.09.2013 or latest. the manufacturer shall supply the certificate of test and examination carried out by govt. owned lab or nabl approved lab [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - wheel iron skids. specification for wheel skid for use of indian railway bg stock as per rdso drawing no tfc/spec/374/skid dated 26.09.2013 or latest.
supply of clip retainer slack adjuster to blw part no. 17452405 and to emd part no. 8401928. [ warranty period: 30 months after the date of delivery ] ] - clip retainer slack adjuster
supply of set of items comprise of two items. item1: side sill rh to drawing no icf drg no. a aa12094, qty .01 no, item2: side sill lh to drawing no icf drg no. aaa12095, qty :01 no. [ warran ty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - side sill
supply of pillar to rcf drg no. lw 14112, alt.c or latest [ warranty period: 30 months after the da te of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - pillar to rcf
supply of member complete as per drg no. 2.10113.0.03.100.010 ( under slung water tank suspensio n bracket ) [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - slung water tank suspension bracke
supply of traction centre for fiat bogie of lhb coaches fiat drg.no.1267507 ver-00r1( c53973 ref bred 8396) and specification no.s355j2g3f,en 10025/29 and mdts 150 rev.nil an d mdts 166 rev .2.or latest [ warranty period: 30 months after the date of delivery ] ] sse/lhb fiat bogie - traction centre for fiat bogie of lhb coaches fiat.
supply of curve roll to fiat drg. no. 12667532 ver.00 or icf drg. no. lwscwac-0-0-002 alt.b and to specn. no. specn. no. en 1.0570, 10025/29 5355 j2g3f, mdts 166 rev.1 or latest [ warranty period: 30 months after the date of delivery ] ] sse/lhb fiat bogie - curve roll to fiat.
supply of becket complete to drawing no .58111054 [ warranty period: 30 months after the da te of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - becket complete