FILTERS
supply of horizontal wear liner with manufacturer initial and month and the year o f manufacture by metal laser engraving in 6 mm size and 0.1 mm depth minimum. to rdso drg.no. wd-97049 s/3 alt.11 or latest,item 03. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - horizontal wear liner
View Insights
supply of hvn-66 insulating liner ,cut liner at fish plated joint for use with wider psc sleeper (r t-8746) suitable for 60kg(uic)/ 60e1 & 52 kg rails (drawings and item details as mentioned in set do cument are applicable) drg: (rdso) rt- 10225 to rt-10227 spec: (rdso) irs specification t-44, 2025, third revision set doc: set documents for rt-10226-10227 [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - rate contract for manufacture and supply of high viscous nylon-66 (hvn-66) insulating cut liner at fish plated joint to rdso drawing no.t-10226-10227.
supply of rotary lock lift assembly for cbc aar h type, as per escorts drg.no.sk 1656 to rds o specn. no.rdso/2011/cg- 03 (rev.1) [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - rotary lock lift assembly for cbc
supply of set of 8 rubber metal bonded items for all air spring fiat bogies as per enclosed rcf/kapurthala stock nomenclature list. [ warranty period: 30 months after the date of delivery ] ] - set of 8 rubber metal bonded items for all air spring fiat bogies
supply of clip assembly for wheel set earthing equipment for lhb type coaches to rcf. drg. no. lw 71240 alt. 'a' or latest. [ warranty period: 30 mont hs after the date of delivery ] ] - clip assembly
supply of set of spares of ercu assembly of m/s. schunk make for vande bharat trainset as per annexure attached. [ warrant y period: 30 months after the date of delivery ] ] - set of spares of ercu assembly of m/s. schunk make
supply of bottom housing for boxns wagon to rdso drg no. wd-12008-s/1, alt. no.3, item no-1 an d specification of wd-62-misc-17 rev-1 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - bottom housing for boxns wagon
supply of top side bearer liner as per item no 11 of rdso drawing no. wd-20024-s/2 alt. 01 or latest an d as per specification no. is:3885 part-1, gr-4 amnd. 2:2024 or latest. note :the finished item shall be comple tely painted with red colour coding [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - top side bearer liner to item no 11 and other
supply of set of lavatory door arrangement complete (01 no. rh+ 01 no. lh) for non ac coaches as per icf drg. no. icf/std-5-6-011, alt. c(capital)/0 or latest. one set consists of col-3 (iii) in quantity -01 no. and col-4 (iv) in quan tity -01 no. note: item no. 2 [panel] should be as per rdso specn. no. c-k513 rev.1 of aug-2023 shade nacsp-05. [ war ranty period: 30 months after the date of delivery ] ] - set of lavatory door arrangement complete
supply of flap assembly for silde cover of electric point machine to drg.no. cwm 14325. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - flap assembly
supply of set of spares for cummins model no.nt855r esn. 25239540 for the tower wagon. tw305 consists of the 7 items following:- (1). gasket, acc dri ve support to cummins part no. 218027-01 no, (2). gasket, cam fol housing to cummins part no. 9266-06 nos, (3). gasket fuel pump to cummins part no. 30 69103-01 no, (4). gasket, cam fol housing to cummins part no.120819-06 nos, (5). gasket, cam fol housing to cummins part no.9266 a-06 nos, (6). kit, up per engine gasket to cummins part no. 4024946-01 no, (7). compressor, air to cummins part no. ar 7944-01 no. [ warranty period: 12 months after the da te of delivery ] ] - set of spares
supply of supply of hdmi 4*2 video mixer switcher with following specifications: (i) 4 x hdmi type-a f emale (black), (ii)video outputs: 2 x hdmi type-a female (black), (iii)max resolution: true 4k up to 4096 x 2160 @ 60hz (4:4:4), (iv)hdmi standard: hdmi 2.0 (3d, deep color, 4k) and hdcp 2.2 compliant, (v)max d ata rate: 18 gbps (6 gbps per lane), (vi)audio outputs: optical (toslink), coaxial (rca), and analog stereo (2 x rca) for audio extraction, (vii)control methods: front-panel push buttons, ir remote control, and bi-dir ectional rs-232 serial control port, (viii) special features: audio return channel (arc), auto switch (autom atically detects new sources) [ warranty period: 30 months after the date of delivery ] ] - supply of hdmi 4*2 video mixer switcher
supply of draw bar with castle nut for draw gear arrangement to rdso sk no.99007, alt-3 items 1 & 2, spec:c-9509 (rev.2) of feb.'07.amdt.1 of oct.2016. [ warranty period: 30 months after the d ate of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - draw bar with castle nut
supply of centering disc to fiat bogie to rcf drg. no. 1268599 ver.01r to specn. no. is: 5517-93 (ra 2019) amend.3 of july 2019, gr. 45c8(m), mdts 166 revision 2 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - centering disc for fiat bogies
supply of locking pin (threaded ) control arm to drg.no.1227320,index-06 and specification no eni.6582,en 10083 pt-1 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - locking pin (threaded ) control arm
supply of a set of ss fittings for double ferrule brake piping arrangement of lhb bogies consisti ng of 1. female connector 3/4 inch od x 1/2 inch bsp(f) to drg.no. icf/std-3-5-107, item-2, alt "f" qt y-4 nos. 2. female run tee connector (with conical seating) 3/4 inch od x 1/2 inch bsp x m26 x 1.5 to drg. no. icf/std -3-5-118, item-1, alt- nil qty-1 no. 3. female run tee connector 3/4 inch od x 1/2 inch bsp(f) to drg. no. icf/std -3-5-119 item-1, alt"d", qty-1 no to spec no. icf/ md/spec-166, issue status-01, rev-04,amd. no. 2 of nov.22 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - a set of ss fittings for double ferrule brake piping arrangement
supply of hvn-66 insulating liner ,cut liner at glued joint for use with psc sleeper(rt-2496) suit able for 60kg.(uic)/ 60e1 & 52 kg rails (drawings and item details as mentioned in set document are applicable) drg: (rdso) rt- 10235 to rt-10237 spec: (rdso) irs specification t-44, 2025, third revision set doc: set documents for rt-10236-10237 [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - rate contract for manufacture and supply of high viscous nylon-66 (hvn-66) insulating cut liner at glued joint to rdso drawing no.t-10236-10237
supply of stainless steel water tank assembly (2x685ltrs) with complete accessories & connecti on to be supplied loose as per rcf drg.no. cc-63136, alt. f and to rcf spec. mdts - 093 ,rev.8 [ wa rranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] csd/per, sr - stainless steel water tank assembly (2x685ltrs)
supply of module assy for m676cups-03 with m/s medha part no sp675201124. [ warranty period: 30 months after the date of delivery ] ] - module assy
supply of unmodified gear case (top & bottom) complete set as per southern railway car shed, avadi's drawing no.m/trs/bg/emu/326 sheet no 1 of 2 consisting of 33 items for top half and sheet no.2 of 2 consisting of 22 items for bottom half gear case for bg ac emu. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] amm/tsd/avd, sr - unmodified gear case (top & bottom) complete set
supply of shaft grounding ring for 3 phase traction motor type tme-48-45-6 of aegis part no. sgr- 6.9-0a6 or similar to medha part no. sptsa003788p0002 (note: dealer should enclose latest authorise d dealer ship certificate from oem along with the offer) [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - shaft grounding ring for 3 phase traction motor type tme-48-45-6
supply of set of ms worm drive clips consisting 02 items, as follows: 1) 110mm dia size - 01 no/s et. 2) 60mm dia size - 01 no/set. confirming to is: 4762 (or) latest. [ warranty period: 30 months a fter the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] - set of ms worm drive clips
supply of wheel iron skids. specification for wheel skid for use of indian railway bg stock as per rdso drawing no tfc/spec/374/skid dated 26.09.2013 or latest. after the red oxide primer coating, the iron whe el skids are to be coated with fluorescent tp lemon yellow paint for enhanced visibility. the manufacturer s hall supply the certificate of test and examination carried out by govt. owned lab or nabl approved lab. [ warranty period: 30 months after the date of delivery ] ] - wheel iron skids
supply of supply a set of forged & machined link motion components consist of 41 items for x class locomotive as per attached annexure & scope of wor k. note: 1. one integral test piece should be provided for each component, it should be parted in presence of railway authority for material testing before ma chining. 2. magnaflux testing should be carried out for all components at government authorized lab and test certificate should be submitted along with the m aterial supply. 3. all threads should be in bsw. 4. painting should not be done on the items for inspection. 5. for equivalent material specification refer g oc/x/spec-x-032, issue-02. 6.dimensional inspection report should be submitted along with the material supply. [ warranty period: 30 months after the da te of delivery ] ] - forged & machined link motion components consist of 41 items ( 52266376& 52266377 clubbed )
supply of files flat bastard 300mm tapered to is.1931/2000(ra-2021),amd.no 1 of jan 201 2(table-1) [ warranty period: 30 months after the date of delivery ] ] dy.cmm/msd/goc, sr - item 1) files flat bastard 300mm tapered to is.1931/2000(ra-2021), amd.no 1 of jan 2012(table-1) item 2) files half round bastard 300 mm (12 inch) to is.1931/2000(ra 2021)amd. no 1 of jan 2012(table iii)
supply of kit for sanding equipment mainfold assembly as per ftrtipl part no. 79000612 5 and d & m part no. rk-ab-759-w404 consists of 4 items as per annexure enclosed. [ warra nty period: 30 months after the date of delivery ] ] amm/elsd/rpm, sr - kit for sanding equipment mainfold assembly
supply of kit for panto equipment manifold as per ftrtipl pt. no. 790006135 and d and m pt. no. rk. ab 759- w 414 consisting of 6 items as per annexure attached. [ warranty period: 30 months af ter the date of delivery ] ] amm/elsd/rpm, sr - kit for panto equipment manifold
supply of aluminium extruded equal angle moulding of size 25 x 25 x 1.6mm thick x 3660mm long,with radius at root 4mm specn. is :3908-2025 or lat est. designation 63400 to is :733-2025 or latest & temper designation t6 to is :5052-2025 or latest. [ warranty period: 30 months after the date of deliver y ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - aluminium extruded and flat items.
supply of procurement of side filling complete with coupling, coupling union, strainer and washer to drg no. t-6-3-651 alt. d/55 or latest,item 1,2,3 & 4. material for item 1 & 2 as per rcf str no. mdts-203 (rev.06) or latest & material for item 3,4 as mentioned in drg. [ warranty period: 30 months after th e date of delivery ] ] - side filling complete with coupling
supply of supply of e type lock with brass ward as per rdso drg. no: sa -3376/m and key as per rds o drg. no: s 3377/m to suit rdso spec. no. irs:s-30/64 or latest alteration and amendment if any as per d rawing attached. list of quantity required as per ward numbers are attached. [ warranty period: 30 mont hs after the date of delivery ] ] - e type lock with brass ward as per rdso drawing
supply of high capacity loco side buffer assy-bg (elastomer spring type) cap 1500 kgm minimu m to rdso drg. no. sk.dl-4561 alt-2 including the following part drawings, sk.dl-4562 alt-3, sk.dl-4 563 alt-1, skdl-4564 items - 1,2,3,4,5, & 6 alt-1, l/bd-655/m alt-6, skdl-4565 alt-1 to material specifi cation no. mp 0.41.00.03 (rev-03) august 2024 [ warranty period: 30 months after the date of deliv ery ] ] amm/lssd/ed, sr - high capacity loco side buffer assy-bg (elastomer spring type) cap 1500 kgm minimum
supply of rate contract for manufacture and supply of fittings for level crossing for wider psc sleeper with 6 0 kg (uic) running rails and 52 kg check rail for 25t axle load to rdso drg no t-8671 (alt-3), specification- serial no. irs: t- 23-2021, serial no. irs: t-16-2019, serial no. irs: t-42- 2020. (the details of each set including drawing no and quantity as furnished in the annexure - 1a). [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - rate contract for manufacture and supply of fittings for level crossing for wider psc sleeper with 60 kg rdso drg no t-8671 (alt-3).
supply of components for clamp type ground connection for point machine 220mm stroke. cons ists of :- 1. clamp point lock 60kg (tws) for b.g to drg.no. rdso/s3395a- alt-ptj-2: 1 set. 2. drive rod to drg.no. rdso.s.3460 alt- ptj-3: 1 no 3. drive rod lug lh and rh to drg.no rdso.s.3461 alt-ptj-8: 1 s et 4. switch extension bracket to drg.no rdso.s.3591,alt-ptj-5: 2 nos 5. bush to drg.no rdso.s.3463 :1 no 6. insulating plate (rh) to drg.no rdso.s.3592 : 1 no 7. insulating plate (lh) to drg.no rdso.s.3 593 : 1 no 8. insulating washer to drg.no s.8640 : 8 nos 9. bush to drg.no.s23199: 4 nos 10 bolt special head with castle nut to drg.no.sa 9158 alt ptj-2 : 4 nos painting shall be done on the items where electro plating is not specified. painting all over, except on working surface, with two pri ming coats, one of zinc chrome to is:104 followed by another of red oxide - zinc chrome to is:2074 & finish coat of signal red to is:2932. supply shall be made with embossing of "s&t/ptj" in lock bar assembly, lock arm, stock rail bracket, drive lug & drive rod. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 la cs ] ] - components for clamp type ground connection for point machine 220mm stroke
supply of long life loco side buffer assly (capacity:30 kj minimum) to rdso drg. no. sk .dl- 4748 alt-2, and rdso specn. no. (1) mp-0.41.00.03 (rev. 03), august 2024 or latest [ war ranty period: 30 months after the date of delivery ] ] amm/elsd/rpm, sr - long life loco side buffer assly
supply of set of "c" runer for l.h.b ac/nac/coaches as per drg no.(i)310113.0.05.000.102 alt- r, qty:01 no.(ii) drg no. -310113.0.05.000.103 alt -r qty-01 no. [ warranty period: 30 months after the dat e of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - set of "c" runer
supply of set of external sealing for body side entrance door consisting of 3 items -(1) r ubber gasket to rcf drg. no:la52101 alt-a- quantity/set-1 .(2) gasket pivot side to alstorm lhb gmbh drg. no:3.10113.0.22.120.109(sheet 1 and 2)-quantity/set-1. (3)top gasket to rcf drg. no. la 52104-alt-a- quantity/set -1 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - set of external sealing for body side entrance door consisting of 3 items
supply of test point for lhb coaches as per faiveley part no.040209000 confirming to rdso s pec no. specn: rdso/2011/cg-04 ( rev.04 ) [ warranty period: 36 months after the date of delivery ] ] - test point for lhb coaches as per faiveley
supply of wheel iron skids. specification for wheel skid for use of indian railway bg stock as per rdso drawing no tfc/spec/374/skid dated 26.09.2013 or latest. the manufacturer shall supply the certificate of test and examination carried out by govt. owned lab or nabl approved lab [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - wheel iron skids. specification for wheel skid for use of indian railway bg stock as per rdso drawing no tfc/spec/374/skid dated 26.09.2013 or latest.
supply of clip retainer slack adjuster to blw part no. 17452405 and to emd part no. 8401928. [ warranty period: 30 months after the date of delivery ] ] - clip retainer slack adjuster
supply of set of items comprise of two items. item1: side sill rh to drawing no icf drg no. a aa12094, qty .01 no, item2: side sill lh to drawing no icf drg no. aaa12095, qty :01 no. [ warran ty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - side sill
supply of pillar to rcf drg no. lw 14112, alt.c or latest [ warranty period: 30 months after the da te of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - pillar to rcf
supply of member complete as per drg no. 2.10113.0.03.100.010 ( under slung water tank suspensio n bracket ) [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - slung water tank suspension bracke
supply of traction centre for fiat bogie of lhb coaches fiat drg.no.1267507 ver-00r1( c53973 ref bred 8396) and specification no.s355j2g3f,en 10025/29 and mdts 150 rev.nil an d mdts 166 rev .2.or latest [ warranty period: 30 months after the date of delivery ] ] sse/lhb fiat bogie - traction centre for fiat bogie of lhb coaches fiat.
supply of curve roll to fiat drg. no. 12667532 ver.00 or icf drg. no. lwscwac-0-0-002 alt.b and to specn. no. specn. no. en 1.0570, 10025/29 5355 j2g3f, mdts 166 rev.1 or latest [ warranty period: 30 months after the date of delivery ] ] sse/lhb fiat bogie - curve roll to fiat.
supply of becket complete to drawing no .58111054 [ warranty period: 30 months after the da te of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] sr section engineer,cb,carriage - becket complete
supply of web belt with chromium plate specifications: a durable, parade-quality white waist belt mad e from woven cotton/canvas webbing. the belt features a front male and female brass buckle and two 1-inc h adjustment buckles on the reverse, allowing secure size adjustment for uniformed personnel, material co mposition 2.1 webbing (canvas) material: 100% cotton canvas webbing (or cotton-poly blend minimum 7 0% cotton) width: 2 inches (50 mm) and 2 mm, thickness: 2.5 and 3 mm (tight, firm weave) colour: pure white (bleached), uniform shade throughout, finish: anti-fray edges, smooth surface, free from knots, stain s, blemishes, colour fastness: to washing: min. grade 4, to perspiration: min. grade 4, to light exposure: min. grade -4. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - web belt with chromium plate
supply of acrylic protection cover for passenger emergency alarm pull box for lhb coaches as per rdso drawing no. rdso/cg/drg/23003 or latest. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - supply of acrylic protection cover for passenger emergency alarm pull box
supply of spring kit for c3w2 type distributor valve consisting 0f 20 items as per enclose d annexure or ftrtipl part no. or gipl part no. or similar , conforming to rdso specification no. 02-abr-02 with amendment no. 4 of september 2016. [ warranty period: 30 months after the da te of delivery ] ] cws/jtj, sr - spring kit for c3w2 type distributor valve
supply of modified water pressurized flushing system cylinder piston ring 99mm od x 34mm thick x 16mm id for water pushing sy stem nylon seal and pressing bell set consists of 1 no. ring, 2 nos. of kgs. 25 seal,1 no belt 15 x 2mm. [ warranty period: 30 months after the date of delivery ] ] - modified water pressurized flushing system
supply of nrv 1/4 inch with both end bsp thread (material - brass) and hex nipple 1/4 inch (material - stainless steel) suitable for modification in pipe line of pressurized flushing system in lhb coaches. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] cdo/mdu, sr - nrv 1/4 inch with both end bsp thread