Find the latest subway tenders in southern railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
proposed subway at km 11/686 ( 27.700 x 8.00 m x 5.50 m rcc box ) in lieu of existing lc no. 16 at km11/742 between ncj-cape railway stations.
View Insights
proposed subway at km 13/106 ( 26.50 x 8.00 m x 5.50 m) in lieu off existing lc no. 18 between ncj-cape railway stations.
proposed subway at km 13/106 ( 26.50 x 8.00 m x 5.50 m) in lieu of existing lc no. 18 between ncj-cape railway stations.
proposed subway at km 11/686 ( 27.700 x 8.00 m x 5.50 m rcc box ) in lieu off existing lc no. 16 at km11/742 between ncj-cape railway stations.
tvc division-proposed construction of a pedestrian subway in lieu of l c no. 33 @ km: 56/200-300 in ers-ktym-kyj section (additional crossing)
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, construction of fobs, protective works, proposed extension of minor bridges, between turavur (excluding) and cherthala (excluding) stations (km 24/000- km 32/100) (tuvr-srtl reach)
doubling of track between turavur - mararikulam (tuvr - makm) section:- proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts, side drains, retaining walls, construction of platforms, construction of fobs, provision of platform shelters, protective works, proposed extension of minor bridges along with p.way works at cherthala yard (km 32/100-km 34/300) (length = 2200 m) and mararikulam yard (km 43/300-km 45/100) (length = 1800 m)
doubling of track between alappuzha - ambalapuzha (allp - ampa) section: proposed earth work in formation, modification of lcs, provision of s&t accommodation and gate lodges, provision of cable ducts , side drains, retaining walls, construction of platforms, provision of platform shelters, protective works, proposed extension of minor bridges along with p way works at alappuzha yard (km 54/100-km 58/800).
shoranur-mangaluru section: (1) proposed re-construction of br. no. 829 (proposed dn line) at km 603/700-800 as 3x12.2m clear span psc slab between pallippuram and kuttippuram stations (2) proposed re-construction of br. no. 1177 (proposed up line) at km 822/300-500 as 6x12.2m clear span psc slab between kanhangad & kotikulam stations (3) proposed re-construction of br. no. 1188 (proposed dn line) at km 827/500-700 as 4x12.2m clear span psc i girder & slab between kanhangad & kotikulam stations including earthwork & blanketing for formation on approaches, collection of ballast, linking of track and other miscellaneous works in palakkad division of southern railway.
assistant divisional engineer/mangalore section -provision of 1.80 m wide fob to prevent tresspassing at km 808/800-900, 828/100-200 and 848/400-410- 130 kmph route.
assistant divisional engineer/kannur section -provision of 1.80 m wide fob to prevent tresspassing at km 658/300-400, 677/700-800 and 689/800-900-130 kmph route.
assistant divisional engineer/ palakkad section -provision of 1.80 m wide fob to prevent tresspassing at km 540/100-200 and 546/300-400.
assistant divisional engineer/shoranur section-provision of 1.80 m wide fob to prevent tresspassing at km 590/600-700 and 628/200-300- 130 kmph route.
palakkad division - provision of new 1.80 m wide fobs at kulukkallur (hg 2 category stn) and melattur station ( hg - 1 category stn ) in shoranur-nilambur section.
earthwork for the formation of embankment and construction of bridge, in connection with the provision of a mega ballast depot at manjattidal station.
ers - ktym - kyj section - pro. reconstruction of exg. bridge no. 297 (1 x 4.57m psc slab ) as 1 x 6.10m rcc box at km. 58 / 000 - 100 between ettumanur and kottayam stations.
srr - ers section - pro. reconstruction of exg. bridge no. 193 (1x 1.22 m pipe) as3.50 x 2.00 m rcc box at km. 94 / 700 - 800 between klmr and ipl stations
mdu division: provision of fob at 4 stations, construction of new running room at bodinayakkanur and rpf outpost building at manamadurai & vanchimaniyachi station- power supply arrangements, wiring and installations
modification to existing ohe arrangements in connection with provision of fob under amrit bharat station scheme in chennai division.