corrigendum : manufacturing and supply of 6400 mm over riding derailing switches 1 in 8.5, bg, 60 kg. (uic) on psc sleeper as per rdso drawing no. t-6068 (alt-4) complete, but excluding grsp, insu lating liners, ercs, fish plates and fish bolts & nuts, and ir specification: t 10-2025. note-1: this in cludes cost of all the rails required for manufacturing of this item.note-2:the bifurcation of rh and lh quantity will be advised in coverage purchase order. [ warranty period: 30 months after the date o f delivery ] [ rate of supply 24 units per month , commencement time allowed -1 month ] anywhere in nwr as per tender 217.00 set
View Insights
corrigendum : running contract for manufacture and supply of pre-stressed monoblock isolated/offsiz e psc sleepers, pre-tensioned type for bg 1673 mm, for 1 in 12 turnouts to rdso/drawing no. t-421 8 (alt.-11), for 1 in 8.5 turnouts to rdso/drawing no. t-4865 (alt.-9) and for derailing switch to rds o/drawing no. t-6068 (alt.-5) as per alteration to suit 60e1 rail conforming to irs specification no.t- 45 (fourth revision, march,2021 with corrigendum no.-2) and loaded into wagons/road vehicles. the isolated psc sleepers will be paid in running meter(rm) as per relevant rdso drawing. [ warranty period: 60 months after the date of delivery ] ] anywhere in jodhpur as per tender 29420.00 metre
supply of running contract for manufacture and supply of pre-stressed mono block concrete sle epers, pre-tensioned type for b.g. (1673mm), for derailing switch to rdso/drg. no. t-6068 (alt.5), fo r general layout and part drawings thereof to suit 60e1 rail, both fan shaped, as per rdso design, drawing and irs specification no. t-45 (4 th revision- march,2021) and str-2025 (tdg-0046, july,20 25) and all the psc sleepers for turnouts duly loaded into wagons/road vehicles. [ warranty perio d: 60 months after the date of delivery ] ] anywhere in jodhpur as per tender 250.00 set
supply of hvn-66 insulating liner conforming to rdso drg no t-8992 alt- 2 for use on sharp curve with wider psc sleeper to drawing no. rdso/t-8979 to rdso/t-8982 suitable to rails 60kg(uic)/60e1 & 52 kg (drawings and item details as mentioned in set document are applicable) drg: (rdso) rt 899 2-8994 spec: (rdso) irs specification t-44, 2025 , third revision. [ warranty period: 30 months afte r the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] [ rate of supply 36213 units per month , commencement time allowed -1 day ]
manufacture and supply of isolated psc turnout sleeper for 1 in 12 turnout (in rm) as per rdso drawin g no. t-4218 and confirming to irs specification no. t-45 (4th revision march-2021 with corrigendum 1 & 2) as amen ded from time to time for pre-stressed concrete sleepers (pre-tensioned type). (the alt. in drawings & specification iss ued by rdso up to 10 days prior to tender opening date shall be applicable in this tender) [ warranty period: 60 mo nths after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
supply of manufacturing and supply of pre stressed mono-block concrete sleeper (pre-tensioned type) f or thick web switch expansion joint (rdso drg.no. t-8838) for long welded rails 52kg/60kg uic for bg wit h latest alteration in drawing and latest specification or corrigendum if any upto the date of opening of ten der.] [ warranty period: 30 months after the date of delivery ] ] senior section engineer/c-i/pw- - manufacturing and supply of pre stressed mono-block concrete sleeper
supply of 1 in 12 over riding (o.r.) turnout: 1 in 12 cast manganese steel crossing b.g. (1673 mm) for 60e1 rail on psc sleepers excluding erc, liner, ncrgrsp, fish plates, check rail and check rail fittings. (drawing and item details as mentioned in set documents are applicable) drg: (rdso) rdso/t-4220 alt.09 spec: (rdso) ir s: t-29 (revised -2024), (rdso) irs/t-10-2025 set doc: set documents for rt-4220 [ warranty period: 30 months after t he date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - running contract for supply of 1 in 12 over riding (o.r.) turnout: 1 in 12 cast manganese steel crossing drg: (rdso) rdso/t-4220 alt.09
composite work (civil, electrical & s&t) comprising formation, viaducts, minor/major bridges, rubs/subways, station buildings, staff quarters, platforms, passenger amenities, supply & spreading of ballast, track linking and p-way works, along with design, supply, erection, testing & commissioning of 25 kv ac ohe and supply, installation, testing & commissioning of telecom outdoor systems including trenching, laying, blowing, splicing & jointing of 48f x 2 ofc on both sides of the track, one-side quad cable, emergency communication system and other associated works between jamaniya (excluding) to tirla (excluding) from km 125.92 to km 147 (21.08 km) in connection with the chhotaudepur-dhar new broad gauge line project in vadodara division of western railway.
supplying of 65 mm gauge machine crushed railway track ballast in stacks &loading same ballast into railway ballast hoppers at haralaya ballast depot of jodhpur division.
manufacturing, supplying and stacking of machine crushed track ballast in between km: 99.400 to km: 116.654 in connection with taranga hill-abu road via ambaji new bg line project of ajmer division.
hubballi division: supply of ballast at kotturu(kty) depot & cess ballast at ginigera(gin) yard in sr.den/east/ubl jurisdiction.
[i] sbc-jtj section: proposed construction of rub at trespassing location at km 339/300-400 between hdih-kjm stations in aden/sbc sub-division- trd works[ii] sbc-jtj section: proposed construction of pedestrian subway at km.230/000-100 between pu-mar stations in aden/bwt sub-division [iii]recoupment of ballast at tss,sp/ssp and provision of cable trench covers in sbc-jtj section.[iv]bifurcation of elementary section at skpt station and modification of umbrella structures at ypr station. [v]provision of earthing and bonds at ssp/sp,fob and platform shelters in sbc-jtj section.[vi] kjm-augmentation of kjm shed for increasing homing capacity from 175 to 300 electric locomotives-detailed estimate. [vii]ohe modifications in connection with construction of new ac loco trip shed at ypr. [viii] ynk-bwt section: proposed an approach road on lh side in rub 85a at km 96/200-300 between cmy-svs stations [ix] ohe modifications in connection with construction of ac loco trip shed at smvb.