Find the latest shackles tenders in western railway for 2026 from government departments, corporations and state PSUs. Get tender details and bidding information.
FILTERS
supply of d' shackles set of one each 1" (25mm), 3/4" (19mm), 5/8" (16mm), 1/2" (12mm) with forged steel gr. 80 with galvanize d plated. working capacity of 1" & 3/4" should be 3.2 tonne and 5/8" & 1/2" should be 1.6 tonne. type - screw pin. note: load test re port with validity from govt./nabl approved test lab to be submitted along with the material. [ warranty period: 30 months after th e date of delivery ] ] senior section engineer trd store rjt, - d' shackles set
View Insights
custom bid for services - ns-1 labour cost for work of mechanized cleaning rag picking at awr station for a period of 03 years , custom bid for services - ns-2 cost of machines with amc for mechanized cleaning rag picking at awr station for a period of 03 years , custom bid for services - ns-3 cost of consumables and gadgets for mechanized cleaning rag picking at awr station for a period of 03 years , custom bid for services - ns-4 cost of ppe including uniforms for mechanized cleaning rag picking at awr station for a period of 03 years
supply of cvd coated 30 mm neutral insert for hyt make cnc surface wheel lathe machine lnux 301940-tn 7512,make-kennametal or lnux 301940 or 2500, make-indicarb or lnux 301940 sn-2 5 grade sr-17,make-ceratizit, preferable makes: kennametal,ceratizit,indicab / equivalent reputed brand. [ warranty period: 30 months after the date of delivery ] ]
supply of 3/4 inch guard's emergency valve with handle (r.h) for wsf type brake equipmen t of emu.spec. m/s.wsf's part no. ib 70391 or, kpa drg. no. er/kpa/el/va.3he.1941b [ warranty pe riod: 30 months after the date of delivery ] ]
supply of lever for brake without bush size 20 x 100 x 583mm for ac coach brake rigging to icf drg. no. wtac4-3-2-402, alt-l, item no. 2. material and specification as per drawing. [ warranty period: 30 m onths after the date of delivery ] ]
supply of equalising lever complete with bushes to rdso drg. no. sk-69597, alt-43, item nos. 1 , 5, 6 & 7. material for item 1 should be is: 2062-2011, with amendment no. 1 of nov. 2012, grade: e 250 a and for items 5 to 7 conforming to is:5517-1993, with amendment 1 to 3, grade: 45c8 hardene d/tempered. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] dy cmm - dahod, wr
supply of handle directional phenolic to emd pt. no. 10563802 alt. aa. as per drg.no. em d part no.10563802 specn: emd part no.10563802 [ warranty period: 30 months after the date of delivery ] ] diesel stores depot abu
supply of equalising lever with bush for bogie brake gear (blc) as per drg. no. contr-9404-s/10, item-2, alt-13. [ warranty period: 30 months after t he date of delivery ] ] senior section engineer wagon bogie prtn wr,
supply of koyta heavy duty blade material high carbon steel, handle material wooden, blade edge pla in, blade length 15 inches, construction type forged, item weight 1 kg, blade colour black and white. suit able for tree & branches cutting [ warranty period: 30 months after the date of delivery ] ] sr. section engineer ohe (s)
supply of lhb coach acp resetting key (99 mm x 120 mm)., with manual uncoupling device, having in jection mould handle, confirming to is 1875(carbon steel: en-08) as per drawing no.cg10100. test certific ate to be given by firm. [ warranty period: 30 months after the date of delivery ] ]
supply of neutral turning inserts with chipbreaker to widia make of part no 3870262 l nux- 191940-db-tn2000 or sandvik make of part no - lnux-191940-pm 4315 or kennametal to ols specification no.lnux 19 1940 rrh - kc9110 or ceratizit part no 191940 sn 25 grade sr 17. [ warranty period: 30 months after the date of delivery ] ] dsd-sbc, swr - neutral turning inserts with chipbreake
supply of handle for vestibule area for lhb coaches as per drawing le24103 alt b, packing instruction: brown paper wrapping for individual item collectiv ely packed in jute bags. quality plan: 0. test certificate to be provided along with supply. [ warranty period: 30 months after the date of delivery ] ] senior section engineer carpenter shop - handle for vestibule.
supply of rubber door stop for lavatory door to drg.no.icf/std-6-3-018 alt-nil. (natural rubber). [ warranty period: 30 months after the dat e of delivery ] ] senior section engineer carpenter shop - rubber door stop for lavatory door
supply of consumables required for flw section as per technical annexure-i (s.no.01 to 16) and techn ical annexure-ii (s.no. 01) [ warranty period: 12 months after the date of delivery ] ] - consumables required for flw section.
supply of indexible inserts to sandvik part no. snmg 190612-qm 40351 widia part no. snmg 19 0612-5 grade tm 2000, indicarb part no. snmg-190612 grade igsp or equivalent. [ warranty period : 30 months after the date of delivery ] ] - indexible inserts to sandvik
supply of t-max inserts neutral lnux 191940 as per sandvik part no.175 32 191940 25m 3 015 or widia part no lnux 191940 grade tn 2000 or ceratizit part no 191940 sn 25 grade sr 17 or drillco seco part no. 191940 mr 850 r conforming to specification attached. [ warrant y period: 30 months after the date of delivery ] ] - t-max inserts neutral lnux 191940
supply of link (item no 35) for top operating handle e type cbc handle as per clw drawing no 1209-0 2.441-120 [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] - link (item no 35) for top operating hand [link (item no 35) for top operating handle e type cbc handle as per clw drawing no 1209-02.441-120]
supply of 10 kg carbon steel sledge hammer with fiberglass handle as per attached specifications. make: deneer/taparia/stanle y/dewalt/other reputed make. [ warranty period: 12 months after the date of delivery ] ] - carbon steel sledge hammer
supply of supply of installation lever assy. with ball and socket to ftrtil part no ft00 53176-101 for trainset vb chair car [ warranty period: 30 months after the date of delivery ] ] sse/coach undergear & - supply of installation lever assy. with ball and socket
supply of handle for manhole cover of btpn wagon as per drawing no.w/tf-1374. note: - m aterial test certificate from nabl accredited/govt. approved labs to be submitted along with the supply. [ warranty period: 30 months after the date of delivery ] ] - handle for manhole cover
supply of installation lever as per kbi part. no. ii73437, for vande bharat train set coaches. [ w arranty period: 30 months after the date of delivery ] ] sse/coach undergear & - installation lever